Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.1010 E Hopkins Ave.0070-2021-BCHO (3)
CHO Order Number 1010-2021-BNA Record Type ChangeyGaniChange] Field Plan Set Must Be Printed In Color ,`►►;�;� Address 1010E HYMAN AVE Owner ©Emmy Garrigus[Change] Original Number 21-3221 Status Permit Review Type Change Order Reason for Cancel or Carpi. ''',I Review Fail Applicant MONIQUE AGNESn, Aspen Internal? No Account MAA Required Bond Amount aster permit A#0056-2020-BRES CITY OF Project Total Available Bond Amount ASPEN Land Use Planning Application Bluebeam Project Id 169-681-913 ,�■ 1Y. OF ASPEN Master Building Permit 0056-2020-BRES HPC-ZON-EH-UTIL Review These plans'rtept at the Permit ContractorAor HPC-ZON-EH-UTIL Review-2 PERMIT N4. building site or inspection Valid Business License on Eng Review 0070-2021-BCHO delays may occur.Construction shall conform to these plans.All Imported Parks-Prkng-San Review Parks Rev, Required Submissions Conditional Inspections the building official.approvedes shall be by Documents Resubmitted Conditional Final lnsp OWNER stJsl Approved Covid-19 Plan SEPARATE ADDRESS 1010 E. Hyman REQUIRED FORE ECTRICAL, ►Action Items PLUMBING,MECHANICAL,OR • FIRE SPRINKLER WORK ►Queue Score PARCEL ID 273718147002 SMOKE ALARMS AND v Dates CARBON MONOXIDE New Appcation Date 10/182021 Close/CO Issuance Date DETECTORS REQUIRED li THROUGHOUT DWELLING Application Complete Date 10202021 Last Activity Date 2/92022 UNIT PER CITY OF ASPEN Application Accepted Date 10/20/2021 Expiration Date MUNICIPAL CODE 8.15 Issue Date Due Date TCO Issuance Date Override Expiration Date It should be known that this review shall not relieve the applicant of their v Basic Information responsibility to comply with the requirements of the City of Aspen Description The description of work is to waterproof the existing census code **Change Order Municipal Code.Pursuant to foundation walls for the renovation project.We are excavating the earth around the two sides of the exterior Se 04.050,any permit or approval issued walls to waterproof the foundation because issued in error or otherwise not in water is getting into the house.We cannot sheet rock conformity with the requirements of this anything in the basement until we do the waterproofing. Title,shall be void.Similarly,any permit PLEASE SEE ATTACHED PROJECT SUMMARY FOR or approval issuedof,a in reliance upon or as a result of,a materially false Use of Building Multi-Family statement or representation made in Use Class Residential the process of obtaining the permit or development approval shall,likewise, Class of or Alteration be void.Any person having received a Permit Comments void or voidable permit or approval shall not be relieved from having to Job Location comply with all applicable terms and v conditions of this Title and the City shall Address 1010 E HYMAN AVE.ASPEN:273718147002 Lot not be estopped from fully enforcing Site Address Display on Map Legal Description Subdivision PINE GLEN TOWNHOUSE CONDO Unit:W same. Historic Property? No Eden Address Historic District? No ►HPC-Planning-Zoning Details D olloorial Building Project Details MAA 02/22/2022 1 Valuation S125.000.00 Lot Size Sq.Ft 6.666 Reason for Valuation Change The valuation change is 10 excavate.shore and apply the Soil Disturbance Sq Ft 276 October 17,2021 . . waterproofing. Unit Sq.Ft 3.509 Affected Area Sq Ft 276 To:The City of Aspen j imp Building Footprint Sq Ft Existing Hardscape Footprint Sq 873 RE: 1010 East Hyman:Change order submittal for emergency waterproofing. Ft Sq Ft of Building Work Area 0 Existing Hardscape%of Lot 13% The attached change order is to waterproof the existing foundation walls of 1010 East Hyman,a Building Fire Area Sq Ft Con Mit Sq Ft Total 276 project currently under renovation under 0056-2020-BRES permit.During the renovation Utility Review Sq.Ft 0 Utility Review Sq Ft Total 276 process it was discovered that there is no waterproofing on the existing foundation walls.This %of Interior being Altered 0% results in run-off entering the basement of the duplex during every significant rainfall event. New Sq.Ft. 0 Until the existing foundation walls are waterproofed,the renovation process has been halted. Otherwise,there is significant risk of damage to all interior improvements,all of which would v Scope of Work Details further delay the construction process. Work Changes Building No Work Affects Tree/Drip Line? Yes Footprint? Though this application is only to perform emergency waterproofing we understand that Work Changes FenestrationfThrtnl No Located Within City Mall No waterproofing is the first part of the mitigation work needed to update the site's drainage to Envelop? Boundaries? meet current City of Aspen standards.This application includes civil plans illustrating the full Requires Asbestos Test?j No Adjacent to City Open Space? No proposed improvements to the site's drainage.The application for permission to do this civil work will follow in a separate change order so that the waterproofing mitigation at the Photovoltaic Installation No Impacts City Trails/Parks? No foundation walls may be approved as soon as possible Work AddsiRemoves,Changes No Work Subject to Water Efficient No Plumbing Fixt? L.O.? Please let me know if you have any questions or comment. Restaurant/Food Service No Involves Impact on Sewer? No Involved? Change of Restaurant No Prevents Access to Sewer Main? No Respectfully Submitted, Ownership? Affects Parking/Alleys:Loading? No Sewer Easements Affected? No Monique Agnew,AIA LEED AP V Building Description Code Editions Required Special Inspections Other Code Editions Energy Code Compliance Prescriptive Table Building Type(IRC) Total Snowmelt Sq Ft ria#9) Construction Type Total Spa Sq FtophjevFire Sprinkler Existing? NO Total Pool Sq Ft 28/2022 Fire Sprinkler Required? No Amount of Onsite Renewable ZONING Generation? Fire Sprinkler Type CO Description Fire Alarms Installed? NFPA 72 Basement MONIQUE AGNEW ARCHITECTURE RECEIVED #Wood Fireplaces 1st Floor ASPEN/sAM rx co .:!ASIPN/ s 6461 54-6362 #Gas Log Fireplaces end Floor Mo0MAAAc,,nn,o,.coo 10/20/2021 #Gas Appliances 3rd Floor ASPEN Open Text Field For Comments BUILDING DEPARTMENT Additional