Loading...
HomeMy WebLinkAboutFile Documents.315 Dean St.0024-2024-BCOM (8) 8/11/24,9:16 AM S ubm sion Confirm e1—City of Aspen Engineering City of Aspen Engineering Construction M anagem ent Plan #0000000657 I On August 11, 2024 3:14 pm First Name Jeff Reynolds Last Name EasTex Tow if LLC Em ail jeff.reynolds@ontivity.com Phone 7196414606 IP Address 174.234.3.139 Score Obtained 100.0 out of 105.0 (95.2%) Passed Designation You passed! Your Certificate is attached. Please print and submit w th your CM P Completion Time 5 m inutes, 22 seconds Adrn inistrator Processing Rem arks User Account Guest Link https://cm paspen.com/subm ission-confirm ed/? id=ac5de433d32656375fad3f744d311067 Section 1/4 Correct answ as are w crth 5 points. about:blank 1/9 8/11/24,9:16 AM S ubm sion Confirm e1—City of Aspen Engineering True (Score 0) Once a CM Pis approved, the site is exem pt from any new or changed ® False regulations added to the CM P (Score 5) U Score Obtained/Total 5/5 a. M ake contractors jum pthrough hoops (Score 0) b. Have a docum ent stating how the construction O site will m itigate its effect on the neighborhood (Score 5) The City requires a CM Pin order to: 0 c. M ake it m ore diffi cult to do construction (Score 0) d. Have a docum ent that allow sthe contractor do O w laatever it takes to complete the construction (Score 0) U Score Obtained/Total 5/5 The best description of the City's a. The contractor m ust do w hat the City tells him,no enforcem ent policy for CM P issues is: 0 matter w laat (Score 0) b. The City w II alw ars give a verbal w aning and a O correction notice before issuing a red tag (Score 0) c. The City will work with the contractor to fix any O issues, but m ay issue a verbal warning, correction notice, or red tag when appropriate. (Score 5) d. The City w II autom atically side w th neighbors in O any dispute (Score 0) about:blank 2/9 8/11/24,9:16 AM S ubm sion Confirm e1—City of Aspen Engineering U Score Obtained/Total 5/5 Section 2/4 Add all square footage, interior and exterior, that will O be physically disturbed by construction activities, even if it is to be revegetated after construction (Score 5) Add all square footage, interior and exterior, that w II O be finished w th im pervious materials (Score 0) To Calculate disturbance area, you Add all square footage w thin the footprint of the m ust: 0 house (Score 0) Add all square footage of the neighborhood that w II O be disturbed by any parking, noise, or fumes from the construction site (Score 0) U Score Obtained/Total 5/5 Be as short as possible O (Score 0) Provide an overview of the construction project including background information, proposed O developm ent type and general inform ation, the proposed effect on public utilities and the extent of excavation and method of stabilization employed. (Score 5) The Project Description should be: Include the contact inform ation O (Score 0) Be at least 600 w crds and detail the structural O engineering of the building (Score 0) U Score Obtained/Total 5/5 about:blank 3/9 8/11/24,9:16 AM S ubm sion Confirm e1—City of Aspen Engineering Notifying all neighbors w thin 300' of the construction site no less than 10 days prior to the O start of construction w th a project description and schedule (Score 0) Updating the neighborhood on a monthly basis O (Score 0) Public Notification includes: Posting a project sign in a visible location O (Score 0) All of the above (Score 5) O Score Obtained/Total 5/5 7 AM - 5 PM Mon-Sat O (Score 0) 7 AM - 5 PM M on-Fri, 9-5 Sat O (Score 0) The Allow able Construction hours are: O 9-5 M on-Sun (Score 0) ell 7:30 AM-5:30 PM M on-Fri, 9-5 Sat (Score 5) U Score Obtained/Total 5/5 True O (Score 0) The w crk hours are completely non- flexible 0 False (Score 5) U Score Obtained/Total 5/5 Some holiday no w crk days are in 0 True effect throughout the entire City, w hle (Score 5) about:blank 4/9 8/11/24,9:16 AM S ubm sion Confirm e1—City of Aspen Engineering some depend on w here the construction site is located False O (Score 0) u Score Obtained/Total 5/5 M ust m aintain site lines or provide signage showing O that neighboring businesses are still open (Score 5) Is allow Ed to completely block access to neighboring O businesses as long as access is open from the other side (Score 0) When w a-king near other businesses, a construction site: Can w crk 24 hrs/day w thout City approval if O neighboring businesses are closed for offseason (Score 0) Should schedule large deliveries during the O neighboring businesses' large sale events (Score 0) U Score Obtained/Total 5/5 Construction fence m ust be at least 6' high chain link O w th a m esh w hdscreen. (Score 0) An approved sound fence can be used in lieu of chain O link fence (Score 0) Which sentence best describes construction fencing as required by Depending on construction activities, a fence may the CM P? 0 not have to fully enclose the entire property (Score 0) All of the above O (Score 5) U Score Obtained/Total 5/5 about:blank 5/9 8/11/24,9:16 AM S ubm ssion Confirm ed—City of Aspen Engineering Section 3/4 True (Score 5) You m ust provide a copy of all necessary draw hgs w th the CM P submittal even if the draw hgs are O False (Score 0) already in the main permit set. U Score Obtained/Total 5/5 Clearly marked property line O (Score 0) Construction and/or sound fence line w th access O points (Score 0) Which of these items is not necessary on a general site plan: O All neighbors within 300' names and addresses (Score 5) Delivery, material storage, and parking areas (Score 0) U Score Obtained/Total 0/5 If you have a site w here the location of Turn in one site plan that show sthe first stage of the key elements such as access points, 0 construction storage areas, and site offs ces w II (Score 0) change throughout the construction process you should: O Turn in a site plan for each w e;k of the construction (Score 0) Turn in a site plan to cover each general phase of O the construction (Score 5) Don't turn in a site plan because it w II alw ars be O changing (Score 0) about:blank 6/9 8/11/24,9:16 AM S ubm sion Confirm e1—City of Aspen Engineering U Score Obtained/Total 5/5 Any time construction activity w II block any part of a O street, sidew dk, or alley (Score 0) Any tim em aterials w II be stored in City ROW O (Score 0) When is a Temporary Right of Way Any tim etraffi cflow, vehicular or pedestrian, w II be Encroachm ent needed? 0 effected by construction activity (Score 0) All of the above (Score 5) U Score Obtained/Total 5/5 Any tim eyou will have any soil stabilization (e.g. e m icropiles, soil nails, layback etc...) as part of your construction process (Score 5) Any tim eyou w II have large piles of dirt onsite for When m ust you depict the extent of 0 m ore than 2 w a?ks excavation and detail any method of (Score 0) stabilization to be em ployed in your CM P? 0 Any time you w II be re-vegetating over 'h an acre (Score 0) Any time you w II be storing dirt in the Right of Way O (Score 0) U Score Obtained/Total 5/5 Section 4/4 All construction sites are required to True have 24 hr noise monitoring. 0 (Score 0) about:blank 7/9 8/11/24,9:16 AM S ubm sion Confirm e1—City of Aspen Engineering False (Score 5) 8 Score Obtained/Total 5/5 65 db all year long O (Score 0) 70 db in the sum m e throughout the city, 70 db in O the winter on the M all, 80 db all other times (Score 5) Which statement best describes the noise lim its for construction in Aspen? 70 db in the sum m a, 80 db all other times O (Score 0) 80 db all year long O (Score 0) U Score Obtained/Total 5/5 Any neighbor w thin 300' requests it O (Score 0) Any type of reinforced earth stabilization will be O performed A construction site is required to have (Score 5) a sound engineer/consultant model the site and specify noise mitigation There are 3 or m ore houses w thin 300' of the site m easures to keep the noise below the O (Score 0) allow thle lim it w hen: Over 400 square ft of the site w II be disturbed O (Score 0) U Score Obtained/Total 5/5 Which statement about construction All m easurem ents w II be taken w th a decibel reader site noise m easurem ent is not true: 0 on a "Slow "response using the "A" w eghting scale (Score 0) O All m easurem ents are taken from the property line of the construction site about:blank 8/9 8/11/24,9:16 AM S ubm sion Confirm e1—City of Aspen Engineering (Score 0) At a project inside a m ulti-unit building, noise O m easurem ents w II be taken from the w dl, ceiling, or floor of neighboring units. (Score 0) All m easurem ents are taken from the 2nd floor of a O neighboring house (Score 5) 8 Score Obtained/Total 5/5 M anufacturing activities that are in excess of 80 db O require an Extended Inn pact Permit (Score 0) Cutting stone is an exam ple of M anufacturing Onsite O (Score 0) Which of the follow hg statements All m anufacturing activities are limited to a 90 day about M anufacturing Onsite are true: p duration (Score 0) All of the above (Score 5) 8 Score Obtained/Total 5/5 Certificate Inform ation Name at Jeff Reynolds Company Name & EasTex Tow er LLC Email Address jeff.reynolds@ontivity.com Phone Number ® 7196414606 about:blank 9/9