HomeMy WebLinkAboutFile Documents.315 Dean St.0024-2024-BCOM (8) 8/11/24,9:16 AM S ubm sion Confirm e1—City of Aspen Engineering
City of Aspen Engineering Construction M anagem ent Plan #0000000657 I On August 11, 2024
3:14 pm
First Name Jeff Reynolds
Last Name EasTex Tow if LLC
Em ail jeff.reynolds@ontivity.com
Phone 7196414606
IP Address 174.234.3.139
Score Obtained 100.0 out of 105.0 (95.2%)
Passed
Designation
You passed! Your Certificate is attached. Please print and submit w th your
CM P
Completion Time 5 m inutes, 22 seconds
Adrn inistrator Processing
Rem arks
User Account Guest
Link https://cm paspen.com/subm ission-confirm ed/?
id=ac5de433d32656375fad3f744d311067
Section 1/4
Correct answ as are w crth 5 points.
about:blank 1/9
8/11/24,9:16 AM S ubm sion Confirm e1—City of Aspen Engineering
True
(Score 0)
Once a CM Pis approved, the site is
exem pt from any new or changed ® False
regulations added to the CM P (Score 5)
U Score Obtained/Total 5/5
a. M ake contractors jum pthrough hoops
(Score 0)
b. Have a docum ent stating how the construction
O site will m itigate its effect on the neighborhood
(Score 5)
The City requires a CM Pin order to: 0 c. M ake it m ore diffi cult to do construction
(Score 0)
d. Have a docum ent that allow sthe contractor do
O w laatever it takes to complete the construction
(Score 0)
U Score Obtained/Total 5/5
The best description of the City's a. The contractor m ust do w hat the City tells him,no
enforcem ent policy for CM P issues is: 0 matter w laat
(Score 0)
b. The City w II alw ars give a verbal w aning and a
O correction notice before issuing a red tag
(Score 0)
c. The City will work with the contractor to fix any
O issues, but m ay issue a verbal warning, correction
notice, or red tag when appropriate.
(Score 5)
d. The City w II autom atically side w th neighbors in
O any dispute
(Score 0)
about:blank 2/9
8/11/24,9:16 AM S ubm sion Confirm e1—City of Aspen Engineering
U Score Obtained/Total 5/5
Section 2/4
Add all square footage, interior and exterior, that will
O be physically disturbed by construction activities,
even if it is to be revegetated after construction
(Score 5)
Add all square footage, interior and exterior, that w II
O be finished w th im pervious materials
(Score 0)
To Calculate disturbance area, you Add all square footage w thin the footprint of the
m ust: 0 house
(Score 0)
Add all square footage of the neighborhood that w II
O be disturbed by any parking, noise, or fumes from the
construction site
(Score 0)
U Score Obtained/Total 5/5
Be as short as possible
O (Score 0)
Provide an overview of the construction project
including background information, proposed
O developm ent type and general inform ation, the
proposed effect on public utilities and the extent of
excavation and method of stabilization employed.
(Score 5)
The Project Description should be:
Include the contact inform ation
O (Score 0)
Be at least 600 w crds and detail the structural
O engineering of the building
(Score 0)
U Score Obtained/Total 5/5
about:blank 3/9
8/11/24,9:16 AM S ubm sion Confirm e1—City of Aspen Engineering
Notifying all neighbors w thin 300' of the
construction site no less than 10 days prior to the
O start of construction w th a project description and
schedule
(Score 0)
Updating the neighborhood on a monthly basis
O (Score 0)
Public Notification includes:
Posting a project sign in a visible location
O (Score 0)
All of the above
(Score 5)
O Score Obtained/Total 5/5
7 AM - 5 PM Mon-Sat
O (Score 0)
7 AM - 5 PM M on-Fri, 9-5 Sat
O (Score 0)
The Allow able Construction hours are: O 9-5 M on-Sun
(Score 0)
ell 7:30 AM-5:30 PM M on-Fri, 9-5 Sat
(Score 5)
U Score Obtained/Total 5/5
True
O (Score 0)
The w crk hours are completely non-
flexible 0 False
(Score 5)
U Score Obtained/Total 5/5
Some holiday no w crk days are in 0 True
effect throughout the entire City, w hle (Score 5)
about:blank 4/9
8/11/24,9:16 AM S ubm sion Confirm e1—City of Aspen Engineering
some depend on w here the
construction site is located False
O (Score 0)
u Score Obtained/Total 5/5
M ust m aintain site lines or provide signage showing
O that neighboring businesses are still open
(Score 5)
Is allow Ed to completely block access to neighboring
O businesses as long as access is open from the other
side
(Score 0)
When w a-king near other businesses,
a construction site: Can w crk 24 hrs/day w thout City approval if
O neighboring businesses are closed for offseason
(Score 0)
Should schedule large deliveries during the
O neighboring businesses' large sale events
(Score 0)
U Score Obtained/Total 5/5
Construction fence m ust be at least 6' high chain link
O w th a m esh w hdscreen.
(Score 0)
An approved sound fence can be used in lieu of chain
O link fence
(Score 0)
Which sentence best describes
construction fencing as required by Depending on construction activities, a fence may
the CM P? 0 not have to fully enclose the entire property
(Score 0)
All of the above
O (Score 5)
U Score Obtained/Total 5/5
about:blank 5/9
8/11/24,9:16 AM S ubm ssion Confirm ed—City of Aspen Engineering
Section 3/4
True
(Score 5)
You m ust provide a copy of all
necessary draw hgs w th the CM P
submittal even if the draw hgs are O False
(Score 0)
already in the main permit set.
U Score Obtained/Total 5/5
Clearly marked property line
O (Score 0)
Construction and/or sound fence line w th access
O points
(Score 0)
Which of these items is not necessary
on a general site plan: O All neighbors within 300' names and addresses
(Score 5)
Delivery, material storage, and parking areas
(Score 0)
U Score Obtained/Total 0/5
If you have a site w here the location of Turn in one site plan that show sthe first stage of the
key elements such as access points, 0 construction
storage areas, and site offs ces w II (Score 0)
change throughout the construction
process you should: O Turn in a site plan for each w e;k of the construction
(Score 0)
Turn in a site plan to cover each general phase of
O the construction
(Score 5)
Don't turn in a site plan because it w II alw ars be
O changing
(Score 0)
about:blank 6/9
8/11/24,9:16 AM S ubm sion Confirm e1—City of Aspen Engineering
U Score Obtained/Total 5/5
Any time construction activity w II block any part of a
O street, sidew dk, or alley
(Score 0)
Any tim em aterials w II be stored in City ROW
O (Score 0)
When is a Temporary Right of Way Any tim etraffi cflow, vehicular or pedestrian, w II be
Encroachm ent needed? 0 effected by construction activity
(Score 0)
All of the above
(Score 5)
U Score Obtained/Total 5/5
Any tim eyou will have any soil stabilization (e.g.
e m icropiles, soil nails, layback etc...) as part of your
construction process
(Score 5)
Any tim eyou w II have large piles of dirt onsite for
When m ust you depict the extent of 0 m ore than 2 w a?ks
excavation and detail any method of (Score 0)
stabilization to be em ployed in your
CM P? 0 Any time you w II be re-vegetating over 'h an acre
(Score 0)
Any time you w II be storing dirt in the Right of Way
O (Score 0)
U Score Obtained/Total 5/5
Section 4/4
All construction sites are required to True
have 24 hr noise monitoring. 0 (Score 0)
about:blank 7/9
8/11/24,9:16 AM S ubm sion Confirm e1—City of Aspen Engineering
False
(Score 5)
8 Score Obtained/Total 5/5
65 db all year long
O (Score 0)
70 db in the sum m e throughout the city, 70 db in
O the winter on the M all, 80 db all other times
(Score 5)
Which statement best describes the
noise lim its for construction in Aspen? 70 db in the sum m a, 80 db all other times
O (Score 0)
80 db all year long
O (Score 0)
U Score Obtained/Total 5/5
Any neighbor w thin 300' requests it
O (Score 0)
Any type of reinforced earth stabilization will be
O performed
A construction site is required to have (Score 5)
a sound engineer/consultant model
the site and specify noise mitigation There are 3 or m ore houses w thin 300' of the site
m easures to keep the noise below the O (Score 0)
allow thle lim it w hen:
Over 400 square ft of the site w II be disturbed
O (Score 0)
U Score Obtained/Total 5/5
Which statement about construction All m easurem ents w II be taken w th a decibel reader
site noise m easurem ent is not true: 0 on a "Slow "response using the "A" w eghting scale
(Score 0)
O All m easurem ents are taken from the property line of
the construction site
about:blank 8/9
8/11/24,9:16 AM S ubm sion Confirm e1—City of Aspen Engineering
(Score 0)
At a project inside a m ulti-unit building, noise
O m easurem ents w II be taken from the w dl, ceiling, or
floor of neighboring units.
(Score 0)
All m easurem ents are taken from the 2nd floor of a
O neighboring house
(Score 5)
8 Score Obtained/Total 5/5
M anufacturing activities that are in excess of 80 db
O require an Extended Inn pact Permit
(Score 0)
Cutting stone is an exam ple of M anufacturing Onsite
O (Score 0)
Which of the follow hg statements
All m anufacturing activities are limited to a 90 day
about M anufacturing Onsite are true: p duration
(Score 0)
All of the above
(Score 5)
8 Score Obtained/Total 5/5
Certificate Inform ation
Name at Jeff Reynolds
Company Name & EasTex Tow er LLC
Email Address jeff.reynolds@ontivity.com
Phone Number ® 7196414606
about:blank 9/9