Loading...
HomeMy WebLinkAboutFile Documents.729 Cemetery Ln.0086-2022-BRES (9) City of Aspen Engineering Construction Management Plan #0000000460 I On July 9, 2022 2:47 am First Name Bob mcdonough Last Name mcdonough Construction LLC Email mcdonoughconstruction@comcast.net Phone 9703799674 IP Address 73.153.241 .8 Score Obtained 100.0 out of 105.0 (95.2%) Passed Designation You passed! Your Certificate is attached. Please print and submit with your CMP. Completion 7 minutes, 23 seconds Time Administrator Processing Remarks User Account Guest Link https://cmpaspen.com/submission-confirmed/? id=96e6f9f46342398549fdf6886fe6e9d5 Section 1/4 Correct answers are worth 5 points. True 0 (Score 0) Once a CMP is approved, the site is exempt from any new or False changed regulations added to ® (Score 5) the CMP lis%J Score Obtained/Total 5/5 a. Make contractors jump through hoops 0 (Score 0) b. Have a document stating how the construction site will mitigate its effect on the neighborhood (Score 5) The City requires a CMP in Make i r% t more difficult to do construction order to: 0 (Score 0) d. Have a document that allows the contractor do whatever it takes to complete the construction (Score 0) Score Obtained/Total 5/5 The best description of the a. The contractor must do what the City City's enforcement policy for 0 tells him, no matter what (Score 0) CMP issues is: 0 b. The City will always give a verbal warning and a correction notice before issuing a red tag (Score 0) c. The City will work with the contractor to fix any issues, but may issue a verbal ® warning, correction notice, or red tag when appropriate. (Score 5) d. The City will automatically side with 0 neighbors in any dispute (Score 0) U Score Obtained/Total 5/5 Section 2/4 To Calculate disturbance area, Add all square footage, interior and you must: exterior, that will be physically disturbed ® by construction activities, even if it is to be revegetated after construction (Score 5) Add all square footage, interior and exterior, that will be finished with impervious materials (Score 0) Add all square footage within the footprint O of the house (Score 0) Add all square footage of the neighborhood that will be disturbed by any 0 parking, noise, or fumes from the construction site (Score 0) 8 Score Obtained/Total 5/5 Be as short as possible (Score 0) Provide an overview of the construction project including background information, proposed development type ® and general information, the proposed effect on public utilities and the extent of excavation and method of stabilization The Project Description should employed. be: (Score 5) Include the contact information 0 (Score 0) Be at least 600 words and detail the O structural engineering of the building (Score 0) 121 Score Obtained/Total 5/5 Public Notification includes: Notifying all neighbors within 300' of the construction site no less than 10 days O prior to the start of construction with a project description and schedule (Score 0) Updating the neighborhood on a monthly O basis (Score 0) Posting a project sign in a visible location 0 (Score 0) ® All of the above (Score 5) 8 Score Obtained/Total 5/5 7 AM - 5 PM Mon-Sat (Score 0) 7 AM - 5 PM Mon-Fri, 9-5 Sat (Score 0) The Allowable Construction 9-5 Mon-Sun hours are: 0 (Score 0) 7:30 AM-5:30 PM Mon-Fri, 9-5 Sat (Score 5) 8 Score Obtained/Total 5/5 True 0 (Score 0) The work hours are completely False non-flexible 0 (Score 5) Score Obtained/Total 0/5 True Some holiday no work days (Score 5) are in effect throughout the entire City, while some depend 0 False on where the construction site (Score 0) is located e Score Obtained/Total 5/5 When working near other e Must maintain site lines or provide signage showing that neighboring businesses, a construction businesses are still open site: (Score 5) Is allowed to completely block access to neighboring businesses as long as access 0 is open from the other side (Score 0) Can work 24 hrs/day without City approval if neighboring businesses are closed for offseason (Score 0) Should schedule large deliveries during the neighboring businesses' large sale events (Score 0) 8 Score Obtained/Total 5/5 Construction fence must be at least 6' 0 high chain link with a mesh windscreen. (Score 0) An approved sound fence can be used in 0 lieu of chain link fence (Score 0) Which sentence best describes construction Depending on construction activities, a fencing as required by the fence may not have to fully enclose the 0 CMP? entire property (Score 0) All of the above (Score 5) 121 Score Obtained/Total 5/5 Section 3/4 True You must provide a copy of all (Score 5) necessary drawings with the CMP submittal even if the © False drawings are already in the (Score 0) main permit set. u Score Obtained/Total 5/5 O Clearly marked property line (Score 0) Construction and/or sound fence line with O access points (Score 0) Which of these items is not All neighbors within 300' names and necessary on a general site Q addresses plan: (Score 5) Delivery, material storage, and parking O areas (Score 0) u Score Obtained/Total 5/5 If you have a site where the Turn in one site plan that shows the first location of key elements such 0 stage of the construction as access points, storage (Score 0) areas, and site offices will change throughout the Turn in a site plan for each week of the 0 construction construction process you (Score 0) should: ® Turn in a site plan to cover each general phase of the construction (Score 5) Don't turn in a site plan because it will O always be changing (Score 0) 8 Score Obtained/Total 5/5 Any time construction activity will block O any part of a street, sidewalk, or alley (Score 0) Any time materials will be stored in City O ROW (Score 0) When is a Temporary Right of Any time traffic flow, vehicular or Way Encroachment needed? pedestrian, will be effected by 0 construction activity (Score 0) All of the above (Score 5) 121 Score Obtained/Total 5/5 When must you depict the Any time you will have any soil extent of excavation and detail stabilization (e.g. micropiles, soil nails, any method of stabilization to 0 layback etc...) as part of your construction process be employed in your CMP? (Score 5) Any time you will have large piles of dirt 0 onsite for more than 2 weeks (Score 0) 0 Any time you will be re-vegetating over 1/2 an acre (Score 0) Any time you will be storing dirt in the 0 Right of Way (Score 0) 8 Score Obtained/Total 5/5 Section 4/4 True (Score 0) All construction sites are required to have 24 hr noise 0 False monitoring. (Score 5) 8 Score Obtained/Total 5/5 65 db all year long (Score 0) 70 db in the summer throughout the city, 70 db in the winter on the Mall, 80 db all other times Which statement best (Score 5) describes the noise limits for construction in Aspen? 0 70 db in the summer, 80 db all other times (Score 0) 80 db all year long 0 (Score 0) 12I Score Obtained/Total 5/5 A construction site is required ° Any neighbor within 300' requests it to have a sound (Score 0) engineer/consultant model the site and specify noise Any type of reinforced earth stabilization • will be performed mitigation measures to keep (Score 5) the noise below the allowable limit when: There are 3 or more houses within 300' of O the site (Score 0) Over 400 square ft of the site will be O disturbed (Score 0) Score Obtained/Total 5/5 All measurements will be taken with a decibel reader on a "Slow" response using the "A" weighting scale (Score 0) All measurements are taken from the O property line of the construction site (Score 0) Which statement about At a project inside a multi-unit building, construction site noise noise measurements will be taken from measurement is not true: 0 the wall, ceiling, or floor of neighboring units. (Score 0) All measurements are taken from the 2nd O floor of a neighboring house (Score 5) 8 Score Obtained/Total 5/5 Which of the following 0 Manufacturing activities that are in excess statements about of 80 db require an Extended Impact Manufacturing Onsite are true: Permit (Score 0) Cutting stone is an example of 0 Manufacturing Onsite (Score 0) All manufacturing activities are limited to 0 a 90 day duration (Score 0) All of the above (Score 5) 8 Score Obtained/Total 5/5 Certificate Information Name & Bob mcdonough Company Name & mcdonough Construction LLC Email Address r, mcdonoughconstruction@comcastnet Phone Number p 9703799674 •