Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.1010 E Hyman Ave.0056-2020-BRES (29)
PERMIT NUMBER: ADDRESS: 1010 East Hyman COMMUNITY DEVELOPMENT DEPARTMENT � � ZONING COMPLIANCE VERIFICATION POLICY CITY OP PEN 4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/ elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items unique to the project. 5-The report shall include a written description or drawing notes of the benchmarks or control points used to establish property boundaries, setbacks, building location, building height,and grades for each measurement. 6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in the approved building permit set. 7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptance of Report:The Zoning Officer shall review the report(s) and either confirm the project conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance,which may include but is not limited to additional survey work or a site visit. All drawings of the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field conditions or amendments to the building permit may be required. A determination of non-compliance shall result in the issuance of a correction notice and possible work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the construction process to minimize disruption to the construction schedule. Acknowledgment: I (contractor name) 51 v s,Psa cvNsne _7-7,3fJ understand this policy. I agree that this project will comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this project complies with all applicable zoning limitations. Contractor Signature: Date: ZC Zfl CITY OF ASPEN August 2017 130 S. GALENA ST I ASPEN, CD, /UU6 ASPEN BUILDING DEPARTMENT ADDRESS: 1010 East Hyman PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT e D BUILDING PERMIT CONTACT SHEET CM/CiFASPEN FOR PLAN RLVIF'.d QUrti ioNs Name MONIQUE AGNEW Phone• • • • • i E-mail • •I - - • - • . • FOR INSPECTION QUESTIONS _ _ _ _ - --%. - _4_Jr I- .✓• Name STEVEN WALDECK Phone * �� E-mail - -r- .r Name� Phone Cell Phone NA ess 1010 E. HYMAN City ASPEN state CO _ ZIP 81611 Addaress marileesusi@gmail.com O'.'vNER'S AUTII IZED AGFNI • Name MONIQUE AGNEW Phone Cell Phone a • • 4 • Itl> u 1261 Juniper Hill Road C;I,ASPEN state CO ZIP 81611 E-mail Address MO©MAARCHDESIGN.COM APRL1CAI ION BEST CONTACT Name MONIQUE AGNEW,Monique Agnew Architecture Phone Cell Phone • • Addlreg 1261 JUNIPER HILL ROAD City ASPEN State ZIP 81611 E-mail mo©maarchdesign.com Address ARCHI I[CT OR DESIGNER OF RECORD Name see best contact Phone Cell Phone Mailing Address City State ZIP E-mail Address CIVIL LNGINFER OF RECORD Name NIA Phone Cell Phone Mailing Address City State ZIP E-mail Address STRUCTUAI. ENGINEER OF RECORD _ - Name Jack Albright ALBRIGHT&ASSOCIATES Phonea Cell Phone a' =dreg 402 Park Ave., Unit A City Basalt state CO ZIP 81621 E-mail Address jack@albright-associates.com GENERAL CONTRACTOR Name STEVE WALDECK,STEEPLECHASE CONSTRUCTION,INC. Phone _ _a- a _ _ - _' a Cell Phone e • PAId'n rigs 0124 Totterdown Road City State state CO ZIP 81611 E-mail steve@steeplechaseconstruction.com Address INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is uilt in c mpli ith all applicable codes. Contractor /-\,_ Date 2 I - 20.Z o Signature ❑ Check i you are a tested owner builder(single-family homes only).You must take a test and complete the ovyner/bu 't. (CITY USE ONLY)Owner builder approved by: Date: Affidavit I CITY OF ASPENAugust2017 130 S. GALENA ST I ASPEN, C9, 321u6/111,3 ASPEN BUILDING DEPARTMENT