Loading...
HomeMy WebLinkAboutMaster Permit.705 Spruce St.0012-2023-BROF 2/25/25,4:08 PM 0012-2023-BROF—Salesforce-Enterprise Edition • Close Window salesforce • Print This Page • Expand All I Collapse All 0012-2023-BROF Number 0012-2023-BROF Record Type Roofing/Re-Roofing Address 705 SPRUCE ST Owner Fernando Cruz Original Number 23-0444 Status Closed-Final Type Roofing/Re-Roofing Reason for Cancel or Comp!. Review Fail Applicant Shenoa Weems Aspen Internal? No Account STORM KING ROOFING LLC Bluebeam Project Id 741-437-379 Project HPC-ZON-EH-UTIL Review Master Building Permit Eng Review Eng-CMP Rev, Permit Contractor STORM KING ROOFING LLC Parks-Prkng-San Review Parks Rev, Valid Business License on Account Conditional Inspections Parks leap, Imported Conditional Final Insp Parks Final, Required Submissions Documents Resubmitted Approved Covid-19 Plan Action Items Hold All Reviews Create Fees ,/ Hold Reason Create Fees 2 Conditional Flat Fee Formula Price Book 2023 Conditional Tiered Fee Formula Applicant is a Nonprofit? Conditional Tiered SqFt Fee Discount All Fees(%) Formula Fee Discount Reason CO/LOC? LOC CO Status if Applicable Issued Queue Scoring Project Designation IFFR&Roof Milestone Current Days in 0 Applicant Hand Queue Designation IFFR&Roof Milestone Current Days in City 11 Hands Queue Score 0 Milestone-Total Days in Applicant 0 Hand Last Date Received from Applicant Milestone-Total Days in City 8 Hands Dates New Application Date 2/21/2023 Close/CO Issuance Date 1/27/2025 Application Complete Date 3/9/2023 Expiration Date 7/7/2025 Application Accepted Date 3/9/2023 Override Expiration Date Issue Date 4/14/2023 Last Activity Date 1/8/2025 Days to Issue 36 Additional Information Description Scope#1—5,615 SF Davinci"Multi-Width"Synthetic Slate Census Code RF-Roof Options •Remove and properly dispose of the existing cedar shake roof system to the plywood deck.Includes protection of landscaping and structure. •Fabricate and install 16 oz.Copper flashings per manufacturer's specifications. •Furnish and install full coverage High Temp Ice&Water Shield per manufacturers specifications. •Install Solarhide membrane to provide Class"A"Fire rated roof system per local codes and manufacturers specifications. •Furnish and install Davinci Roofscapes"Multi-Width" Synthetic Slate and associated starter,hip,and ridge shingles per the manufacturer's specifications.Slate to be laid in straight rows with 8"exposure.(Customer's choice of standard color blends) •Clean up and properly dispose of all roofing debris. Davinci"Multi-Width"Synthetic Slate Price:$165,614 Scope#2—700 Pre-finished TRAApex Snow Guards at Synthetic Shake Areas(Preliminary budget pricing) •Install 700 TRAApex pre-finished steelSnow Guards per roof plan and manufacturers specifications. •Clean up and properly dispose of all roofing debris. https://cityofaspen.my.salesforce.com/a038X00002HLjiMQAT/p 1/9 2/25/25,4:08 PM 0012-2023-BROF—Salesforce-Enterprise Edition 700 TRA Apex Snow Guards at Synthetic Shake Areas Price: $11,920 Use of Building Single Family Requires Asbestos Test? No Use Class Residential Permit Comments Parks comments:Please use care and caution in and around trees.If branch pruning is required please use the Shigo Pruning Diagram as a reference. Engineering Comments:Do not stage,store,or park any vehicles or equipment under tree Driplines or on the Public Right of Way without first obtaining additional permits. Job Location Address 705 SPRUCE ST,ASPEN:273707105001 Lot A Site Address Display on Map Legal Description Subdivision:WITZ PROPERTY LLC Lot:A Historic Property? No Eden Address Historic District? No HPC-Planning-Zoning Details Zone District R-30 HPC Certificate of Appropriateness? Deed Restricted? Roofing Project Details Valuation $177,534.00 Lot Size Sq.Ft. Reason for Valuation Change Sq Ft of Building Work Area 5,615 Scope of Work Details Affects Parking/Alleys/Loading? No Work Affects Tree/Drip Line? Yes Located Within City Mall No Boundaries? Impacts City Trails/Parks? No Adjacent to City Open Space? No Building Description Code Editions 2015 IRC Energy Code Compliance Building Type(IRC) Fire Sprinkler Existing? Construction Type VB Fire Sprinkler Required? Occupancy Group Fire Sprinkler Type Fire Alarms Installed? Financials Total Fees $2,932.43 Total Payments $2,932.43 Fees Due at Current Status $1,228.28 Total Balance $0.00 System Information Number 0012-2023-BROF Con Mit Sq Ft Total 5,615 Created By Jacob Weems,2/21/2023 1:28 PM Last Modified By Fernando Cruz,2/25/2025 4:05 PM VIP Form Tool VIP 2/21/2023 VIP Permit Application Submitted 1:34 PM Form Template VIP VIP [{"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus':"Completed","categoryld':"a2E6A000000UwvPUAS"}, Foreign Template {"parentCategoryld":null;'isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvNUAS"}, Language Status {"parentCategoryld":"a2E6A000000UwvKUAS","isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000Uwvl {"parentCategoryld":nulrisSubmin null,"isCurrenn null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvaUAC"}, {"parentCategoryld":nulrisSubmin null,"isCurrenn null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvZUAs"}, {"parentCategoryld":null;'isSubmintrue,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000Ux1 dUAC"}] Action Items View/Print Permit Link Attachment Activity History Email:Letter of Completion:Permit 0012-2023-BROF at 705 SPRUCE ST,ASPEN:273707105001 Type Billable Assigned To Martyna Wojtkowska Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 1/27/2025 Days in Applicant's Hands https://cityofaspen.my.Salesforce.com/a038X00002HLjiMQAT/p 2/9 2/25/25,4:08 PM 0012-2023-BROF—Salesforce-Enterprise Edition To:katie@stormkingroof.com CC: BCC: Attachment:Building_-_CO_City_Use_Tax_-_FRR_Notice_to_Contractor_20250127(1).pdf,Building_-_CO_City_Use_Tax_-_FRR_Transmittal_to_Owner_20250127 (1).pdf,Building_- CO City Use Tax -_Final Return Reconciliation_20250127.pdf,705 Spruce St-0012-2023-BROF_LOC_Final.pdf Subject:Letter of Completion:Permit 0012-2023-BROF at 705 SPRUCE ST,ASPEN:273707105001 Comments Body: Hello Shenoa Weems, Please find attached your issued letter of completion for the completed project at 705 SPRUCE ST,ASPEN:273707105001. If you have any questions about use tax or how to fill out the forms,please contact Bebo Salib at bebo.salib@aspen.gov or 970.920.5043. For questions about this permit,you can reply to this email. Email:Letter of Completion:Permit 0012-2023-BROF at 705 SPRUCE ST,ASPEN:273707105001 Type Billable Assigned To Martyna Wojtkowska Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 1/27/2025 Days in Applicant's Hands To:katie@stormkingroof.com CC: BCC: Attachment:Building_-_CO_City_Use_Tax_-_FRR_Notice_to_Contractor_20250127(1).pdf,Building_-_CO_City_Use_Tax_-_FRR_Transmittal_to_Owner_20250127 (1).pdf,Building_- CO City Use Tax -_Final Return Reconciliation_20250127.pdf,705 Spruce St-0012-2023-BROF_LOC_Final.pdf Subject:Letter of Completion:Permit 0012-2023-BROF at 705 SPRUCE ST,ASPEN:273707105001 Comments Body: Hello Shenoa Weems, Please find attached your issued letter of completion for the completed project at 705 SPRUCE ST,ASPEN:273707105001. If you have any questions about use tax or how to fill out the forms,please contact Bebo Salib at bebo.salib@aspen.gov or 970.920.5043. For questions about this permit,you can reply to this email. Email:Building Permit 0012-2023-BROF-705 SPRUCE ST,ASPEN:273707105001-Issued Type Billable Assigned To Martyna Wojtkowska Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/14/2023 Days in Applicant's Hands To:office@stormkingroof.com CC: BCC: Attachment:City_Use_Tax_Letter_20230414.pdf,Building_Permit_Letter_20230414.pdf Subject:Building Permit 0012-2023-BROF-705 SPRUCE ST,ASPEN:273707105001-Issued Body: JACOB WEEMS, Please find attached your issued building permit for 0012-2023-BROF for 705 SPRUCE ST,ASPEN:273707105001,City Use Tax exemption letter and COVID-19 site safety plan approval notice(if applicable). Below is a link to your plans.Please print these 24x36 in color and keep them on site at all times.As a reminder,links will expire in 30 days so please download the plans as soon as you get this email. Comments https://cityofaspen.sharepoint.com/:f:/s/COA-IssuedBuildingPlansPublicRecords/EhvvxLzFW6RFpwwlt7zeJ5EBx3RrBHye1Jmnyo7Uxdxi7Q?e=auGtQ6 All inspections are scheduled through the Salesforce applicant portal. BUILDING INSPECTIONS REQUESTED BY 7:30 PM WILL BE SCHEDULED FOR THE NEXT BUSINESS DAY.REQUESTS AFTER 7:30 PM WILL BE SCHEDULED FOR THE FOLLOWING BUSINESS DAY.ALLOW THE ENTIRE DAY FOR THE INSPECTION. PLEASE NOTE THAT ALL REFERRAL AGENCIES MUST APPROVE THEIR FINAL INSPECTIONS PRIOR TO THE FINAL BUILDING INSPECTION. WHAT INSPECTIONS DO I NEED?Please visit here:https://www.cityofaspen.com/DocumentCenterNiew/7847/-What-Inspections-are-Needed-for-my-Permit?bidld= HOW TO SCHEDULE AN INSPECTION ONLINE?Please visit here:https://www.cityofaspen.com/DocumentCenterNiew/6436/How-to-request-an-inspection?bidld= For questions on inspections please email buildinginspectors@cityofaspen.com or call 970-920-5065. If you are experiencing system issues please contact sfsupport@cityofaspen.com Email:Permit Fees Due:0012-2023-BROF at 705 SPRUCE ST,ASPEN:273707105001 Type Billable Assigned To Martyna Wojtkowska Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 3/20/2023 https://cityofaspen.my.salesforce.com/a038X00002HLjiMQAT/p 3/9 2/25/25,4:08 PM 0012-2023-BROF—Salesforce-Enterprise Edition Days in Applicant's Hands To:office@stormkingroof.com CC: BCC: Attachment:--none-- Subject:Permit Fees Due:0012-2023-BROF at 705 SPRUCE ST,ASPEN:273707105001 Body: If you have not already paid the fees due on your permit 0012-2023-BROF,at 705 SPRUCE ST,ASPEN:273707105001,please log into the Aspen Permitting Portal to pay them.If you pay online,be aware that credit card or e-check transaction fees will apply. If you would like to pay by check,you can mail payments to the following locations: •Building and related permits:Community Development,427 Rio Grande •Parking Reservation permits:Parking Department,427 Rio Grande •Pitkin County Water Permit:Utility Billing.,427 Rio Grande •ROW and encroachments:427 Rio Grande Comments •Tree permits:Parks Dept.,585 Cemetery Lane Aspen •Utility Connection Permits:Utility Billing.,130 S Galena,1st Floor •Electric Community Investment Fee:Utility Billing.,130 S Galena,1st Floor Current Amount Due:$1,228.28 Instructions to see detail of fees due: -Log in to the Portal here:https://cityofaspen.force.com/applicantportal and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible,click the"View All"link -To filter fees,click on the black funnel icon at the top right.(Example:to only see the fees due at permit submission,select"Complete Pending Submittal Fees" under Permit Fees Due At section and then click Apply button.) Instructions to pay fees are found here:https://www.aspen.gov/DocumentCenterNiew/5008/Paying-for-an-Application-?bidld= Thank you! City of Aspen Email:Permit Fees Due:23-0444 at 705 SPRUCE ST,ASPEN:273707105001 Type Billable Assigned To Linzhi Douglass Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 2/24/2023 Days in Applicant's Hands To:office@stormkingroof.com CC: BCC: Attachment:--none-- Subject:Permit Fees Due:23-0444 at 705 SPRUCE ST,ASPEN:273707105001 Body: If you have not already paid the fees due on your permit 23-0444,at 705 SPRUCE ST,ASPEN:273707105001,please log into the Aspen Permitting Portal to pay them.If you pay online,be aware that credit card or a-check transaction fees will apply. If you would like to pay by check,you can mail payments to the following locations: •Building and related permits:Community Development,427 Rio Grande •Parking Reservation permits:Parking Department,427 Rio Grande •Pitkin County Water Permit:Utility Billing.,427 Rio Grande •ROW and encroachments:427 Rio Grande •Tree permits:Parks Dept.,585 Cemetery Lane Aspen •Utility Connection Permits:Utility Billing.,130 S Galena,1st Floor Comments •Electric Community Investment Fee:Utility Billing.,130 S Galena,1st Floor Current Amount Due:$1,704.15 Instructions to see detail of fees due: -Log in to the Portal here:https://cityofaspen.force.com/applicantportal and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible,click the"View All"link -To filter fees,click on the black funnel icon at the top right.(Example:to only see the fees due at permit submission,select"Complete Pending Submittal Fees" under Permit Fees Due At section and then click Apply button.) Instructions to pay fees are found here:https://www.cityofaspen.com/DocumentCenterNiew/5008/Paying-for-an-Application-?bidld= Thank you! City of Aspen Linzhi Douglass Plans Examiner I linzhi.douglass@aspen.gov I(Office):970.429.2020 Email:Your Building Permit Application Has Been Received...Here's What to Expect Type Billable Assigned To Linzhi Douglass Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 2/22/2023 Days in Applicant's Hands Comments To:office@stormkingroof.com CC: https://cityofaspen.my.salesforce.com/a038X00002HLjiMQAT/p 4/9 2/25/25,4:08 PM 0012-2023-BROF—Salesforce-Enterprise Edition BCC: Attachment:--none-- Subject:Your Building Permit Application Has Been Received...Here's What to Expect Body: Dear JACOB WEEMS: I have received your permit application.I will be your Permit Coordinator.The City of Aspen permit process works as follows: Completeness Review:I will be reviewing your permit application for completeness in the next 7-10 business days.I will follow up with you directly if I need any additional information. Submittal Fees:Once your permit is deemed complete,I will provide you with a list of all permit submittal fees that are due.Your permit will not be placed into our review queue until payment of all submittal fees is received. Permit Review:Your permit will be placed in our review queue on the date that the submittal fee payment is received.Each review agency triggered for the review will either approve the permit or issue comments that you are required to address prior to their approval.You can see the status of all reviews by going into your permit on the Salesforce portal,clicking on the'Related'tab,and scrolling down to'Reviews.' Comment Response:Once you have addressed all agency comments,both in writing and on your plans,you will resubmit all documents via the portal.Just go into your permit,scroll down to the bottom of the page,and use the'Add more'button.You must notify me when you have uploaded your files for me to know that you have resubmitted.You can use the portal's Chatter feature(see instructions below). Issuance:Once all agencies have approved your permit,you will be notified that it is time to pay your permit issuance fees.Once you do so,your approved plans and permit documents will be sent to you electronically. Additional Important Information: Only after I perform a completeness review and submittal fees are paid will your permit be accepted into our system as a formal submission.At that time,it will be put into the permit work queue. I may need to meet with you—either in person,over the phone,or via a virtual meeting—before I can finish my completeness review to ensure that I have a full understanding of your project's scope. If you need to contact me about your permit,I encourage you to use the Chatter feature on your permit on the applicant portal.When you use Chatter,I get an email, but it also gets attached to the permit record in the back office.So,anyone looking at the permit can see the conversations.This will be very helpful if someone else needs to get involved with your permit. To use Chatter: Open your permit on the portal. In the'Share an update...'box,type'@'then start typing my name.My name will appear.Just click on it then add your message. Linzhi Douglass Plans Examiner I linzhi.douglass@aspen.gov I(Office):970.429.2020 Permit Review Type Building Billable Assigned To Linzhi Douglass Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/13/2023 Days in Applicant's Hands Comments Contacts JACOB WEEMS Account STORM KING ROOFING LLC Type Applicant Active Contractor License Count 1.00 Number 0054994 JACOB WEEMS Account STORM KING ROOFING LLC Type Contractor Active Contractor License Count 1.00 Number 0054995 Fees 0081408 https://cityofaspen.my.salesforce.com/a038X00002HLjiMQAT/p 5/9 2/25/25,4:08 PM 0012-2023-BROF—Salesforce-Enterprise Edition Type Use Tax Deposit-City of Aspen Total $814.11 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart V. Paid in Full ✓ Fee Paid Date/Time 0081409 Type Use Tax Deposit-Pitkin County Total $88.77 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart V. Paid in Full ✓ Fee Paid Date/Time 0081410 Type Roof/Repair Con Mit Fee Total $300.40 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Complete Pending Submittal Fees Show in Cart V. Paid in Full ✓ Fee Paid Date/Time 0081411 Type Roofing Plan Review Total $1,403.75 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Complete Pending Submittal Fees Show in Cart V. Paid in Full ✓ Fee Paid Date/Time 0081412 Type Roof/Repair Con Mit Fee Total $300.40 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart V. Paid in Full ✓ Fee Paid Date/Time 0081413 Type Roofing&Re-Roofing Permit Fee Total $25.00 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart V. Paid in Full ✓ Fee Paid Date/Time Files 705 Spruce St-0012-2023-BROF_LOC_Final Building_- CO City Use Tax -_FRR Transmittal_to_Owner_20250127(1) Last Modified 1/27/2025 11:50 AM Last Modified 1/27/2025 11:48 AM Created By Martyna Wojtkowska Created By Martyna Wojtkowska Building_- CO City Use Tax -_FRR Notice to Contractor_20250127(1) Building_-_IRC_IBC_Letter_of_Completion_20250127.docx Last Modified 1/27/2025 11:48 AM Last Modified 1/27/2025 11:44AM Created By Martyna Wojtkowska Created By Martyna Wojtkowska Building_- CO City Use Tax -_FRR Transmittal_to Owner_20250127.docx Building_- CO City Use Tax -_FRR Notice to Contractor_20250127.docx Last Modified 1/27/2025 11:42 AM Last Modified 1/27/2025 11:41 AM Created By Martyna Wojtkowska Created By Martyna Wojtkowska Building_- CO City Use Tax -_Final Return Reconciliation_20250127.pdf Building__IRC_IBC_Letter_of_Completion_20250127.docx Last Modified 1/27/2025 11:22 AM Last Modified 1/27/2025 11:22 AM https://cityofaspen.my.salesforce.com/a038X00002HLjiMQAT/p 6/9 2/25/25,4:08 PM 0012-2023-BROF—Salesforce-Enterprise Edition Created By Martyna Wojtkowska Created By Martyna Wojtkowska City_Use_Tax_Letter_20230414.pdf Building_Permit_Letter_20230414.pdf Last Modified 4/14/2023 10:32 AM Last Modified 4/14/2023 10:32 AM Created By Martyna Wojtkowska Created By Martyna Wojtkowska Building_Cover_Sheet_20230313.pdf Shigo Pruning Diagram Last Modified 3/13/2023 2:07 PM Last Modified 2/22/2023 1:30 PM Created By Linzhi Douglass Created By David Radeck Permit Application 2023-02-21 20:34:24.pdf Last Modified 2/21/2023 1:34 PM Created By Jacob Weems Inspections INS-0001120-23 Status Accepted as Noted Type Building-Midway Point Subtype Requested Date 4/28/2023 9:00 AM Scheduled Start Date 4/28/2023 Completed Date 4/28/2023 Owner Last Name Feder Permit Inspection Round Midpoint Inspection Closed TRUE INS-0001121-23 Status Pass/Accepted Type Parks Subtype Requested Date 4/28/2023 9:00 AM Scheduled Start Date Completed Date 5/4/2023 Owner Last Name Permit Inspection Round Initial Inspection Closed TRUE INS-0001532-23 Status Pass/Accepted Type Building&Referral Inspection Status Subtype Requested Date 5/31/2023 12:00 PM Scheduled Start Date 5/31/2023 Completed Date 5/31/2023 Owner Last Name Nye Permit Inspection Round Final Inspection Closed TRUE INS-0001533-23 Status Pass/Accepted Type Parks Subtype Requested Date 5/31/2023 12:00 PM Scheduled Start Date Completed Date 6/8/2023 Owner Last Name Pewitt Permit Inspection Round Final Inspection Closed TRUE INS-0002703-23 Status Pass/Accepted Type Building Subtype Final Building Requested Date 1/8/2025 7:38 AM Scheduled Start Date 1/8/2025 Completed Date 1/8/2025 Owner Last Name Bennett Permit Inspection Round Final Inspection Closed TRUE Milestones Review Round 1-0012-2023-BROF Status Approved Due Date Created Date 3/9/2023 Payments PY-016502 Related To 0012-2023-BROF Amount $1,228.28 https://cityofaspen.my.salesforce.com/a038X00002HLjiMQAT/p 7/9 2/25/25,4:08 PM 0012-2023-BROF—Salesforce-Enterprise Edition Created Date 4/14/2023 Payment Source R-0015478 Receipt-Amount Remaining R-0015478:$0 PY-016072 Related To 0012-2023-BROF Amount $1,704.15 Created Date 3/7/2023 Payment Source R-0015099 Receipt-Amount Remaining R-0015099:$0 Permit History 2/25/2025 4:05 PM User Fernando Cruz Action Changed Owner from Martyna Wojtkowska to Fernando Cruz. 1/27/2025 11:52 AM User Martyna Wojtkowska Action Changed Status from Ready for Closure to Closed-Final. 1/8/2025 7:57 AM User Ric Bennett Action Changed Status from Final Inspections to Ready for Closure. 1/8/2025 7:38 AM User Shenoa Weems Action Changed Expiration Date from 6/16/2025 to 7/7/2025. 12/18/2024 6:53 AM User Steve Feder Action Changed Expiration Date from 6/14/2025 to 6/16/2025. 12/16/2024 6:52 AM User Steve Feder Action Changed Expiration Date from 6/9/2025 to 6/14/2025. 12/11/2024 3:26 PM User Shenoa Weems Action Changed Expiration Date from 12/5/2023 to 6/9/2025. Reviews REV-028854 Milestone Review Round 1-0012-2023-BROF Status Approved Type Building Due Date Completed Date 3/13/2023 2:32 PM Owner Alias LDoug On Hold Created Date 3/9/2023 REV-028855 Milestone Review Round 1-0012-2023-BROF Status Approved with Conditions Type Parks Due Date Completed Date 3/9/2023 5:59 PM Owner Alias DRade On Hold Created Date 3/9/2023 REV-028856 Milestone Review Round 1-0012-2023-BROF Status Approved Type Engineering CMP Due Date Completed Date 3/20/2023 12:06 PM Owner Alias AReed On Hold Created Date 3/9/2023 Submissions 10.COA Permit Application_Packet-705spruce-20230221.pdf Actions Submission Date 2/21/2023 1:32 PM Status Required Description 10.2020 CMP Application for Medium Projects-Checklist Style-Final-705spruce Actions https://cityofaspen.my.salesforce.com/a038X00002HLjiMQAT/p 8/9 2/25/25,4:08 PM 0012-2023-BROF—Salesforce-Enterprise Edition Submission Date 2/21/2023 1:32 PM Status Required Description 10.assembly details-705spruce 20230221.pdf.pdf Actions Submission Date 2/21/2023 1:32 PM Status Required Description 10.ICC-ES Report.705spruce.20230221.pdf Actions Submission Date 2/21/2023 1:32 PM Status Required Description 10.photo-705spruce 20230221.pdf Actions Submission Date 2/21/2023 1:32 PM Status Required Description 10.Re-Roof Application Checklist.705spruce.20230221.pdf Actions Submission Date 2/21/2023 1:32 PM Status Required Description 10.site plans-705spruce 20230221.pdf Actions Submission Date 2/21/2023 1:32 PM Status Required Description Copyright©2000-2025 salesforce.com,inc.All rights reserved. https://cityofaspen.my.salesforce.com/a038X00002HLjiMQAT/p 9/9