Loading...
HomeMy WebLinkAboutFile Documents.1240 Mountain View Dr.0047-2024-BROF (4) ROOF/RE-ROOF APPLICATION CHECKLIST Changes for 2021 Codes in RED PROJECT ADDRESS: 1240 Mtn View Dr DATE: 7/3/2024 NOTE:All re-roofing projects require a Roofing Permit. Roof work that changes height,slope,footprint,structural framing,or cavity insulation requires a Building Permit. Patching less than 1 square(10'x10')does not require a permit. Reference 2021 Codes and Ordinance 1,2023 for code requirements. THE FOLLOWING MUST BE INCLUDED WITH EACH ROOFING PERMIT SUBMISSION: 6 City of Aspen Re-Roofing Application Checklist—This form must be completed entirely. El Permit Application Signatures Packet-All 6 pages must be completed and include owner or contractor signatures where applicable. If you answered YES to the Asbestos Checklist in the Permit Application Signatures Packet,answer these questions: ®YES/CI NO-Are all materials to be removed asphaltic,tar impregnated and non-friable(will not crumble by hand pressure when dry)? l YES/0 NO-Will you be removing the roofing materials by hand(no circular saws)? in YES/0 NO-Will you dispose asphaltic roof shingles and NOT recycle them? If you answered YES to all the above,an asbestos test will not be required. 0 YES/0 NO-Is the address listed on the"Inventory of Historic Sites and Structures"or in a Historic District? If you answered YES,HPC Approval is required for this project. Contact the Historic Preservation Officer at 970-429-2758. El Site Plan—The site plan may be hand drawn but MUST be legible.Site plans must show the entire roof and include the following: El Extent of proposed work ® Impervious Areas—You must illustrate and label all hardscape vs.landscaping I Downspout&Gutter locations-Draw and label each one and show if they drain to hardscape or landscaping Snowguards/stops—These are required on all roofs that shed onto neighboring properties or potentially occupied areas such as a walkway, stairway,alley,deck,pedestrian and vehicular exit from buildings or areas where there is potential for personal injury or property damage and areas directly above or in front of gas utility or electric utility meters.(Ordinance 1,2023) ❑ Heat Tape—Show location of all heat tape (including existing) ❑ YES/RR) NO-Will you be adding or replacing or reinstalling heat tape? If yes, separate electrical permit required. ❑ Heat Tape watts/ft X Linear Feet: = Watts. If greater than 1000W: 0 REMP Worksheet required(will be completed by Permit Coordinator) ❑ Controls: >40 deg F shut off plus one of the following: ❑ moisture sensor or❑ daylight sensor or❑timer to shut off at night I YES/0 NO—Are there trees on the property?—Parks has purview over all trees/forest Note:City code 13.20.020 explains rules in and around trees.Contact City Forester or their designee @ 970-920-5120 6 Two Photographs of Existing Conditions-One photo must clearly show the structure involved and one must show a close-up of the existing roof. I Construction Management Plan(CMP) 183 Site Plan—(information can also be included on the site plan from above)Show all construction staging areas(i.e.dumpster,trailer,portable bathrooms,etc)and any other requirements per the CMP form IN Proposed Roof Assembly Drawing—Show all layers/components from the roof sheathing up.Each roof layer must be clearly labeled to include product and manufacturer name and existing to remain components and number of layers.Show flashing and ice/water barrier. • Existing roofing and number of layers: 1 layer, asphalt shingle ❑ YES/I NO-Is there insulation currently installed above the roof deck/sheathing? describe and list estimated average insulation R-value and thickness: ❑ YES/® NO—Are you replacing damaged roof deck?Approximate sqft of roof deck to be replaced: ❑If YES to either of the above two questions,insulate per the below: ❑ Commercial: R-40 above deck or R-60 cavity/attic insulation (or R-60 combo of above and below deck) ❑ Residential:R-49 above deck or R-49 cavity/attic insulation (or R-49 combo of above and below deck) ❑ Alternate design (must be approved by Building Department for a justified infeasibility) ❑ Letter of Structural Integrity from Structural Engineer-If adding insulation&building not constructed to current snow load(100psf) 18:1 UL or ICC-ES report for the listed Class A roof assembly specific to your roofing product and installation (required for all roofs per Ordinance 1, 2023) E YES/0 NO-Is the roof vented?If NO,changes to insulation must meet 2021 IBC 1202.3 or provide dew point calculations. Additional requirements from Ordinance 1,2023: Ice barrier consisting of either self-adhering polymer modified bitumen sheet or two layers of underlayment cemented together required to extend from the roof eave edge at least 6 feet inside the exterior wall line as measured along the roof surface,18 inches from the centerline of the valley and 24 inches on the vertical wall at a roofy and wall ig , nd. ETC ViD Ventilation openings,including ridge vents,must protect against rain and snow.Individual vents may not exceed 144 sq inches.Vents must be cov i corrosion-resistant mesh or screen with openings no larger than'4". 07/24/2024 Updated 4/7/23 ASPEN BUILDING DEPARTMENT