Loading...
HomeMy WebLinkAboutFile Documents.675 E Durant Ave.0037-2022-BCOM (11) ; �,, City of Aspen Building Permit Application Checklist for Commercial and Multifamily Projects (IBC) CITY OF ASPEN PROJECT ADDRESS DATE Note:This checklist is specific to Building Department requirements for various building permit application types. For Zoning,Engineering,Parks, Utilities,and WELS requirements visit their pages at http://www.aspen.gov. Building permit application submissions must include ALL the Submittal Requirements on this checklist or they will not be accepted. Refer to the IBC Building Submittal Guide for more information about each requirement. Submittal guides,required forms and other resources can be found in the Building Department Document and Resource Library. Submit all documents and drawings in PDF format via the Salesforce portal.Follow File Preparation Standards for all files submitted. REQUIRED 8 %" X 11" DOCUMENTS Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Permit Application Packet* ✓ Asbestos test and clearance reports ❑ ❑ ✓ ❑ ❑ State Asbestos Demolition Approval Notice Fireplace Registration Form in Manufacturer's ❑ ❑ se N/A installation instructions Energy Code Compliance ❑ ❑ ENEVLOPE: N/A (REScheck, I LIGHTING: COMCHECK COMcheck, or prescriptive path) MECHANICAL: COMCHECK U-Factor Fenestration ❑ ❑ ❑ Docs CREMP/RREMP documents ❑ Line Grade Verification Form ❑ RECEIVED Updated 3/9/22 Page 1 of 5 08/18/2022 ASPEN BUILDING DEPARTMENT Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Signed Special Inspection and ❑ Testing ❑ ✓ N/A Agreement Verification of Structural Integrity n ✓ ORIGINAL FRAMING PLANn Soils Report ❑ Mechanical Docs ❑ ✓ Photos ❑ ❑ N/A Unit/Building relationship ✓ N/A CMP** Residential ECU Calculator** Water/sewer Service Disconnect Applications *Permit Application Packet must be filled out entirely or your submission will not be accepted. **CMP and ECU Calculator are common Engineering requirements; contact Engineering to discuss. REQUIRED 24"x36" PLANS Note: Sheets must be in the following order. Existing plans required for all additions &alterations. Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Cover Sheet ❑ ✓ Survey ❑ Fire Area Sheet Updated 3/9/22 Page 2 of 5 08/18/2022 ASPEN BUILDING DEPARTMENT Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Site Plan CREMP/RREMP Plan ❑ ❑ ❑ Floor Plans: Existing & Proposed ✓❑ Reflected Ceiling Plans ❑ Lighting Plan w/ spec sheet(s) ❑ Occupancy/ Means of Egress Plans ❑ ❑ ❑ E Separation/Fire Resistance Plans ❑ ❑ ❑ Fire Resistant Assembly Listed ❑ ❑ ❑ ❑ Installation Details Accessibility Plans & Details ❑ ❑ ❑ E Roof Plan Elevations/ Height ❑ ❑ ❑ Sections Details Fireplace Details PflNIA RECEIVED Updated 3/9/22 Page 3 of 5 08/18/2022 ASPEN BUILDING DEPARTMENT Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Schedules 1111 1- Excavation/ Earth Retention ❑ Plans Civil Plans *discuss directly ❑ with Engineering Electrical Plans ❑ ❑ ✓ Kitchen Plans ❑ n N/A Mechanical Plans E Plumbing Isometrics/ ❑ Flatometric Structural Plans ❑ ✓ N/A ADDITIONAL NOTES and/or REQUIREMENTS RECEIV ' D Updated 3/9/22 Page 4 of 5 08/18/2022 ASPEN BUILDING DEPARTMENT PRE-SUBMISSION BUILDING CHECKLIST REVIEWED AND ACCEPTED: CITY STAFF NAME: DATE: PERMIT APPLICANT DECLINES TO CONDUCT A PRE-BUILDING PERMIT SUBMISSION MEETING WITH BUILDING STAFF AND UNDERSTANDS THAT FAILING TO DO SO MAY RESULT IN A LENGTHIER BUILDING REVIEW PROCESS: PERMIT APPLICANT NAME: DATE: RECEIVED Updated 3/9/22 Page 5 of 5 08/18/2022 ASPEN BUILDING DEPARTMENT