HomeMy WebLinkAboutFile Documents.1240 Mountain View Dr.0047-2024-BROF (7) CITY OF ASPEN Field Plan Set Must Be Printed In Color ►1►
PERMIT NO.0047-2024-BROF e . - , ; '4 j
OWNERICI t.
CHRISTENSEN ROBERT M&CANC Pill
6- • • ela
® SERVICEION
ADDRESS 1240 MTN VIEW DR , CITY OF
. V R ASPEN
PARCELID 273501308001 •B•• y.• . f�•"'1 • a 1 • Compliance with International codes
•,, , _ • .••: ,�_. • compliance with State Codes
4 These plans muu eKeept at the
APPLICATION ACCEPFED DATE: 2024-07-24 PERMIT NUMBER: 0047-2024-BROFI1 • M www.icc-es.orq I (800)423-6587 I (562)699-0543 A Subsidiary of the International Code Council® building site or inspection
ii\-. • • ICC-ES Evaluation Report Reissued January2023 delays may occur.Construction
• . shall conform to these plans.All
i L• • - E R ESR-3150 This report is subject to renewal January 2025. changes shall be approved by
COMMUNITY DEVELOPMENT DEPARTMENT ; the building official.
N''4�/ r - • r DIVISION:07 00 00—THERMAL AND MOISTURE 3.2.2 Highlander NEX AR:Highlander NEX AR shingles
BUILDING PERMIT COVERSHEET r i\. _ �r PROTECTION are identical to the Highlander except for the addition of
Section:073113—Asphalt Shingles copper roofing granules,for algae resistance,on the top
CITY'Or ASPEN A SEPARATE PERMITS ARE
�- • • W' REPORT HOLDER: surfacing. REQUIRED FOR ELECTRICAL,
• • 3-tab Dura-Seal:Dura-Seal are self-sealing,single layer, PLUMBING,MECHANICAL,OR
B il► 3-tab shingles that consist of bitumen and fillers applied on
PROPERTY INFORMATION ' RED - - _ t , MALARKEY ROOFING PRODUCTS g roofing granules. FIRE SPRINKLER WORK
• I- a fiberglass mat and surfaced with
•now R Ion f ••• EVALUATION SUBJECT: 3.2.4 Dura-Seal AR:Dura-Seal AR are self-sealing,single
ADDRESS: 1240 MTN VIEW DR UNIT: - • . .t24g ^ 9, 9
PARCEL ID: 273501308001 LEGAL DESCRIPTION: WEST MEADOW ,� li "- • - '-1 r * .. layer,3-tab shingles that consist of bitumen and fillers SMOKE ALARMS AND
MALARKEY POLYMER-MODIFIED ASPHALT applied on a fiberglass mat and surfaced with algae
OWNER: CHRISTENSEN ROBERT M&CANDICE L •' • ,••• ` • t • SHINGLES resistant roofing granules. CARBON MONOXIDE
PERMIT CONTRACTOR: '' ' r _ . - • I — DETECTORS REQUIRED
a • �•� • - • 1.0 EVALUATION SCOPE 3.2.5 Vista: Vista shingles are self-sealing laminated THROUGHOUT DWELLING
.. t e _ ..., shingles that consist of polymer modified bitumen and fillers UNIT PER CITY OF ASPEN
t _ ,a • Compliance with the following codes: applied onto a fiberglass mat and surfaced with mineral
«W.1
• •• - • T } ' 1 •1 ' • • ■2021,2018,2015,2012 and 2009 International Building roofing granules. MUNICIPAL CODE 8.15
• E •" i Code®(IBC) 3.2.6 Vista AR: Vista AR shingles are self-sealing
DESCRIPTION OF WORK Remove existing asphalt shingles and install new Malarkey Legacy asphalt shingle roof system ' •• • �� I I • 1` ■2021, 2018, 2015, 2012 and 2009 International laminated shingles that consist of bitumen and fillers applied
t r E • 1 Residential Code (IRC) onto a fiberglass mat and surfaced with mineral roofing
• - ■2013 Abu Dhabi International Building Code(ADIBC)1 granules.
• , / should be known that this review shall
1 ' ` ,The ADIBC is based on the 2gg9 IBC.2009 IBC code sections referenced 3.2.7 Alaskan:Alaskan shingles are self-sealing,single-
t in thisrepodaretnesamesectionslntneAolec. layer three-tab shingles that consist of polymer-modified not relieve the applicant of their
USE OF BUILDING Single Family FIRE SPRINKLER REQUIRED? �• ` •� - - Properties evaluated: bitumen and fillers applied onto a fiberglass mat and responsibility to comply with the
II y surfaced with mineral roofing granules.
1 requirements of the City of Aspen
♦ • '1 • r ■Weather resistance q Y P
+f I '� •• • • • 3.2.8 Alaskan ScotchgardT": Alaskan ScotchgardT• Municipal Code.Pursuant to
•Fire classification
• - shingles are identical to the Alaskan except for the addition Sec.26.104.050,any permit or approval
•It Wind resistance
CLASS OF WORK Residential FIRE SPRINKLER TYPE A.
of copper roofing granules,for algae resistance,on the top issued in error or otherwise not in
4 2.0 USES surtacing.
i ` Illi
conformity with the requirements of this
_ Iii-
r F T ' r The Malarkey asphalt shingles described in this report meet 3.2.9 Legacy:Legacy shingles are self-sealing laminated
REQUIRED SPECIAL / R n -• Title,shall be void.Similarly,any permit
the requirements for Class A roof coverings when installed shingles that consist of polymer-modified bitumen and fillers
BUILDING TYPE(IRC) One family L. • /++ •. in accordance with this report. applied onto a fiberglass mat and surfaced with mineral or approval issued in reliance upon or
INSPECTIONS IP• - :III
i. r L • - roofing granules. as a result of,a materiallyfalse
•
3.0 DESCRIPTION
statement or representation made in
{ ) 3.1 General: 3.2.10 Legacy ScotchgardTM: Legacy ScotchgardT" P
r .• Z . shingles are identical to the Legacy except for the addition the process of obtaining the permit or
CONSTRUCTION TYPE VB ENERGY CODE COMPLIANCE `i -- •• ' • Malarkey asphalt shingles are polymer-modified self-sealing
I r Snow stops required at all location of copper roofing granules,for algae resistance,on the top development approval shall,likewise,
r • 114
shingles complying with ASTM D3462.See Table 1 and P PP
�01" where roofs could shed snow onto surfacing. Any person having received a
• 41141 A • Figure 1 for shingle type(three-tab or laminated),product be void.
i4 walkways,stairs,alleys,decks,exits, 1) names,dimensions,and manufacturing locations. 3.2.11 Ecoasis NEX:Ecoasis shingles are self-sealing void or voidable permit or approval
WORK CHANGES BUILDING !R B utilities and meters,emergency escape 3.2 Polymer Modified Asphalt Shingles: laminated shingles that consist of bitumen and fillers applied shall not be relieved from having to
OCCUPANCY GROUP(IBC) JP 1 s♦ , 7• 9 Y P
FOOTPRINT? 'Y and rescue O enin window wells,or onto a fiberglass mat and surfaced with reflective roofing
opening 3.2.1 Highlander NEX:Highlander NEX shingles are self- comply with all applicable terms and
adjacent properties-Ordinance 1, sealing laminated shingles that consist of bitumen and fillers granules conditions of this Title and the City shall
2023. applied onto a fiberglass mat and surfaced with mineral 3.2.12 Ecoasis Premium:Ecoasis Premium shingles are not be"stopped from fully enforcing
CODE EDITIONS 2021 IBC TOTAL SPA SQ-FT. •a I - - _ • roofing granules. self-sealing laminated shingles that consist of polymer-
11 r• �� , ,' 1 same.
• ICCn endorsement
Report/are not to be construedor a ec representing aesfor its us or any other no warrantybutes not specificallyEvaluation
on Sewed,nor are theypre so r i plied.ed as
as an endorsement of the subject of the report ore recommendation for its use There is no warranty by LCC Eva(umion Service,LGC express or implied.as �_
OTHER CODE EDITIONS TOTAL SNOW MELT SQ.FT. m anvfndina or other matter m this report or as to an,-prodnet covered by the report .L
RECEIVED Copyright o 2023 ICC Evaluation Service,LLC.All rights reserved. Page 1 of 12
HISTORIC PROPERTY? No TOTAL POOL SQ.FT.
077//24/2024 eVIEWE
07/
FIRE SPRINKLER EXISTING? ASPEN l
cRcu c MPLANDE
2024
I BUILDING DEPARTMENT linzhid
li �_• .�::: i ; _!—,— i---1 ray - Work on heat tape is not permitted under
r _ ������ r �_ �� this scope. If any existing heat tape is
touched or new heat tape is proposed, it
�� ` ' will be subject to REMP payment and heat
1240 Mtn. View Dr. - tape control requirements and will require a
•
Roof Assembly Drawing_ �asRa I a sub-electrical permit.
•
I t�' � — • Reach out to your permit reviewer with
Final Roof Inspection
REQUIRED J--- — NUM Malarkey Vista Asphalt questions.
, I , z111 Shingles (class•A")
III Once roof work is complete, you =r ,
Mid-Roof Inspection must request a final roof
REQUIRED inspection. __-.-- -' — Ill High Temp Ice 8,Water
•
Shield
After your roof permit is issued, Inspectors will inspect snow - . -.. •• • .
and you have started work, you guards and heat tape (if Plywood Sheathing _ _.: SWIMS--
•
must request a mid-roof applicable). (existing) 24 Gauge Coated -. -
inspection. Drip Edge
NOTE: If there is heat tape
Inspectors will verify your Class present, a final roof inspection - • r I.
A assembly on site. cannot be requested until the 07/24/2024 MID-ROOF AND FINAL
sub-electrical permit is applied ASPEN ROOF INSPECTIONS
You will request inspection for as both final inspections will ASPEN
BUILDING REQUIRED TO RECEIVE A
directly on SalesForce. occur simultaneously. LETTER OF
COMPLETENESS