HomeMy WebLinkAboutFile Documents.1225 Alta Vista Dr.0075-2024-BROF (8) CITY OF ASPEN
• Field Plan Set Must Be Printed In Color 1►
PERMIT NO.0075-2024-BROF �_� - '`/'/,/
OWNER WILPON JEFFREY&VALERIE J -L:_
dididge
ADDRESS - -- ICC
,��o.�mu umesmo•••• EVALUATION
1225 ALTA VISTA DR .•....� R. ,fix, ® SERVICE®
r ' ' ICC-ES Evaluation Report CITY OF
PARCEL ID 273512261001 ' -- \. �� •
p ASPEN
//�J�/�/,`��� ESR-1389
P ' lB `"C `J • `'',v 1 '- - Reissued January 2024 this report also contains:
APPLICATION ACCEPTED DATE: 2024-09-D6 PERMIT NUMBER: 0075-2024-BROF P- - 9+L R0 e 1 ,` ` - . �,�W --� Revised Match 2024 -CBC Supplement These plans must be kept at the
cs. 'f' • ^ � - ' Stblaalm renewal January 2025 building site or inspection
v�`' n l• QK(AJ _� ;�? ....Pm o.•..r N ICCES Eveluaflon Reports ere sotto es construed es represeM,ngeestha11s crew other elpbutas not spealkaC addressed,nor ere lheyfo be consauedes an delays may occur.Construction
" T -✓ c sII,, �;,;, endorsement ofthe subject of the report or a recommendation for its use Morels warranty bylCC Evaluation Serves,LW,express or Implied,es to any Wing or
COMMUNITY DEVELOPMENT DEPARTMENT t400 �•• •r�' OW' - te- a i Q atherreegerBIMreport,orestoanyw«metcoveredbythesepal shall conform to these plans.All
ool�1 ' •� �` r "� h:: • I' I H cepmsht®raze ICC Evaluation Service LLc All rights reserved.
'� ��� x r o •� , R changes shall be approved by
BUILDING PERMIT COVERSHEET J ' _ �t� L,Ey
I e ' t,. ;kJ
DIVISION:07A D 00— REPORT HOLDER: EVALUATION SUBJECT: Y❑ official.
GTV OF,ySpr 1 I,.(�i + _ ,', r7^W - �4�`
''',I •^ {1' p THERMAL AND CERTAINTEED LLC CERTAINTEED
_ - Ct.' 1.ALOI rid Q S MOISTURE ASPHALT SHINGLES
PROPERTY INFORMATION .-.m 1 r `'✓ a N 1 - \••rI t� � �� Nt S PROTECTION IR
p A +I L f 4% W ai SEPARATE PERMITS ARE
', \ Z 3 Section:0731 13—es
ADDRESS'. 122sALTA VISTA DR UNIT: _ �1g- �'` j AsphaltShingles 0 REQUIRED FOR ELECTRICAL,
PARCEL ID: 273512261001 LEGAL DESCRIPTION: RESIDENCES AT ALTA VISTA 1' •-!� - PLUMBING,MECHANICAL OR
t`P�l` ri•`1: W
OWNER. WILPON JEFFREY&VALERIE •
I�-� V' 5 �•' G ,
PERMIT CONTRACTOR O - iv" ., _ '--" t 1 t - '_ _ LFIRE SPRINKLER WORK
� 1.OEVALUATION SCOPE
• }fy'> J _ ``�
Compliance with the following codes:
• - . -- '� SMOKE ALARMS AND
t ■2021,2018,2015,2012 and 2009 International Building Code.(IBM
I T i yyI .. CARBON MONOXIDE
DESCRIPTION OF WORK Replace roof like for like 0 -' I c - 66 ' ■2021,2018,2015,2012 and 20091nternational Residential Code.(IRC
PO - t • F- - e, _ _ _--_ --\ _ t DETECTORS REQUIRED
. .�0t -- • ., j-_: f--+{ •It - -1 �• �� • -�..7.
� ■2013 Abu Dhabi International Building Code(ADIBC)f THROUGHOUT DWELLING
4. r f .o y
• • _ �1 j*'e. . `y .7 :, "The ADIBC is based on the 2009 IBC.2009 IBC code sections referenced in this report are the same sections UNIT PER CITY OF ASPEN
_ _ '!r- in the ADIBC. MUNICIPAL CODE8.15
USE OF BUILDING Single Family FIRE SPRINKLER REQUIRED? Yes - • - 'Ws� • r' �tv.w� Properties evaluated:
�.� •Weather resistance
CLASS OF WORK Residential FIRE SPRINKLER TYPE I 0 51TE RAN • ■Fire classification
Iileeil to Wind It should be known that this review shall
ons 2.1 1 not relieve the applicant of their
BUILDING TYPE(IRO REQUIRED SPECIAL - - •• •• -• ° USES
INSPECTIONS HEAT TAPE MANDATORY CONTROL REQ'S. • onto responsibility to comply with the
walkwa s,stairs, s,decks,exits, The CertainTeed asphalt shingles described in this report comply with ASTM D3462 and are Class A roof All heat tape systems shall meet the following per(Ordinance)Series 2023): y Y requirements of the City of Aspen
ens
-Automatic controls configured for system shut off when air temperature is above utilities and meters,emer coverings when installed as described in this report.
CONSTRUCTION TYPE ENERGY CODE COMPLIANCE 40°F and comply with one of the following: emergency escapeMunicipal Code.Pursuant to
-shut absence of and rescue opening window wells,or 3.0 D
mff Sec.26.104.050,any permit or approval
-shut off atnight(daylight sensor ortruer) adjacent properties-Ordinance 1, 3.1 General:
issued in error or otherwise not in
WORK CHANGES BUILDING 2023. CertainTeed asphalt shingles are available as three-tab,four-tab,no cut-out and laminated asphalt shingle conformity with the requirements of this
OCCUPANCY GROUP(IBC) FOOTPRINT? p
roof covering materials. •See Table 1 and Figure 1 for recognized product names,shingle types,manufacturing Title,shall be void.Similarly,any permit
locations,overall dimensions,installed weights,maximum exposure to the weather,and fastening details.The ' or approval issued in reliance upon or
CODE EDITIONS 2021 IBC TOTAL SPA SQ•FT. shingles are self-sealing by means of adhesive strips located on either the weather side or the underside.See as a result Of,a materially false
Figure 1 for adhesive strip location for field shingles and Starter Strip shingles. statement or representation made in
' - 3.2 Three-tab,Four-tab and No Cut-out Shingles: the process of obtaining the permit or
OTHER CODE EDITIONS TOTAL SNOWMELT SQ.FT. Three-tab,four-tab and no cut-out shingles are composed ate single layer of fiberglass mat,impregnated and development approval shall,likewise,
coated with asphalt on both sides,and surfaced with mineral roofing granules on the weather side and a be void.Any person having received a
mineral release agent on the back side, void or voidable permit or approval
HISTORIC PROPERTY? No TOTAL POOL SQ.Fr. shall not be relieved from having to
Roof Assembly APPPLICANT SAID THERE WILL BE NO comply with all applicable terms and
all
ARE SPRINKLER EXISTING? SNOW RETENION NEEDED - WILL BE _ riot bees oppeof this Tlflome ndy the enforcingCity n
Pegs of to not estopped from fully
same.
VERIFIED AT INSPECTION
rovoreiv
09/2024 J
Futuutailikawa
linzhid
CertainTeed
Presidential
Shake, Asphalt Existing Plywood
Shingle
Final Roof Inspection
REQUIRED
WIP 300HT, High Temp Ice and Water Shield
Once roof work is complete, you
Mid-Roof Inspection must request a final roof Amenity Energy Use Approved(2021 CODE)
REQUIRED inspection.
I 0 RREMP ❑ CREMP
PERMIT#:0075-2024-BROF DATE:_9/9/24_
After your roof permit is issued, Inspectors will inspect snow RECEIVED HEAT TAPE TOTAL WATTAGE:_4340_
and you have started work, you guards and heat tape (if 09/06/2024 WATTS/FT: 14
must request a mid-roof applicable). ASPEN TOTAL LINEAR FT:_310
inspection. BUILDING DEPARTMENT OFFSET: REMP PAYMENT
NOTE: If there is heat tape NOTE: You many not substitute roofing components/products that stray
Inspectors will verify your Class present, a final roof inspection from the approved and issued ESR/QAI report without Building
A assembly on site. cannot be requested until the department approval. 'Note: MID-ROOF AND FINAL
sub-electrical permit is applied -The first 1000W are exempt from REMP.
p pp -All roof permits will require a sub-electrical ROOF INSPECTIONS
You will request inspection for as both final inspections will Class A assemblies are tested and listed with the specific roof products permit applied for by a licensed electrician. SUB-ELECTRICAL PERMIT REQUIRED FOR HEAT
-A sub-electrical permit must be applied for TAPE REQUIRED TO RECEIVE A
directlyon SalesForce. A sub-electncal permit is required it a heat tape system is present,no matter the LETTER OF
occur simultaneously. called out in the associated documentation. Installers shall follow all prior to the final roof inspection as both final total wattage.A licensed electrician must apply for the permit.
manufacturer's installation instructions for Class A roof assembly. Inspections will occur simultaneously. eaub-eleetd al moat bee lied fer to final roof inspection as permi pp prior p COMPLETENESS
both foal Inspections will occur simultaneously.