APPLICATION ACCEPTED DATE: 2022-05-16 PERMIT NUMBER: 0058-2022-BRES ;;';;°
COMMUNITY DEVELOPMENT DEPARTMENT ,;,, CITY. O ASPEN CITY F
BUILDING PERMIT COVERSHEET
lir 44 •
ASPEN
CITY OF ASPEN PERMIT NO. 0058-2022-B RES
These plans must. a ept at the
building site or inspection
PROPERTY INFORMATION delays may occur.Construction
OWNER 273514209001 shall conform to these plans.All
ADDRESS: 1470 TIEHACK RD UNIT: changes shall be approved by
PARCEL ID: 273514209001 LEGAL DESCRIPTION: MAROON CREEK CLUB Ifilig- - ing official.
OWNER: 1470 TIEHACK LLC
PERMIT CONTRACTOR: BOWDENDEVELOPMENTCORP 1470 •Tiehack RD
ADDRESS SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING,MECHANICAL,OR
DESCRIPTION OF WORK 2 small additions with interior renovation. FIRE SPRINKLER WORK
PARCEL ID 273514209001 SMOKE ALARMS AND
CARBON MONOXIDE
. ' - - °" DETECTORS REQUIRED
THROUGHOUT DWELLING
USE OF BUILDING Single Family FIRE SPRINKLER REQUIRED? Yes UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
CLASS OF WORK Residential FIRE SPRINKLER TYPE NFPA 13
1 It should be known that this review shall
REQUIRED SPECIAL High-Strength Bolting;Structural not relieve the applicant of their
BUILDING TYPE(IRC) One family INSPECTIONS Steel Welding responsibility to comply with the
requirements of the City of Aspen
Municipal Code.Pursuant to
Sec.26.104.050,any permit or approval
CONSTRUCTION TYPE VB ENERGY CODE COMPLIANCE Prescriptive Table issued in error or otherwise not in
conformity with the requirements of this
SPECIAL INSPECTION REQUIRED: Title,shall be void.Similarly,any permit
WORK CHANGES BUILDING or approval issued in reliance upon or
OCCUPANCY GROUP(IBC) R-3 FOOTPRINT? No -Structural steel welding:Field&Shop as a result of,a materially false
-High strength bolting statement or representation made in
-Epoxy anchors the process of obtaining the permit or
-Intumescent paint development approval shall,likewise,
CODE EDITIONS 2015 IRC TOTAL SPA SQ.FT. -Spray applied fire resistive materials be void.Any person having received a
-Permanent micropiles void or voidable permit or approval
shall not be relieved from having to
2015IEBC,2015IECC,2015 IMC, Special inspection is required per 201518C comply with all applicable terms and
OTHER CODE EDITIONS 2020 NEC TOTAL SNOWMELT SQ.FT. section 1704.Inspector to verify that copy of conditions of this Title and the City shall
agreement for inspection program to be on not be estop
ped from fully enforcing
the job site prior to performing any same.
inspections.A copy of all Special Inspector REFERENCES FROM 2015 IRC
HISTORIC PROPERTY? No TOTAL POOL SQ.FT. field reports to be on the job site for CV/A=crawl space ventilation required,sec.R408.1 Access required,R408.4
EE=emergency escape required sec R310.1
inspectors'review if requested.Failure to EU=enclosed usable space under stairs shall be'''A"Gyp,sec R302.7
comply may result in denial of inspection. G/D=garage/dwelling separation,sec R302.5 and R302.6
FIRE SPRINKLER EXISTING? Yes STC=Sound transmission class not less than 45 at dwelling separations,a
K
RV=roof and rafter ventilation required,R806.1
A=attic access 22"x 30",30"headroom above,R807.1 rem,: ySA=smoke alarms installed to NFPA 72 requirements,sec R314jCO=carbon monoxide detector per City Ordinance 41 series 2008 bobs
SG=safety glazing required,sec R308.408/2023
GR=guardrails,36"min ht,4"max opening;req at 30"drop any point w/in 36'
General Electrical Requirements horizontally,sec R312 ZONING
Anyareas affected bythe renovation must be brought WFP=window fall protection-operable window<24"AFF&>72"above
g grade:use opening control device listed to ASTM F2090,sec R312.2
up to the current electrical code including: HR=handrails 34"-38"ht,sec R311.7.8
tamperproof receptacles(NEC 406.12), SI=stairway illumination,sec R303.7
PD=protect against decay,sec R317
ground-fault circuit interrupter protection(NEC 210.8), REFERENCES FROM 2015 IMC
arc-fault protection(NEC 210.12), V=bathroom and balanced whole house mechanical ventilation req. ALL OUTDOOR LIGHTING
spacing 210.52)etc. Ordinance 40,2016 MUST COMPLY WITH
receptacle
P g(NEC( DE=clothes dryer exhaust,sec 504.Makeup air req'd if over 200 CFM THE CITY OF ASPEN LIGHTING CODE
AS=access and service space for maintenance req'd,sec 306
MA=make up air required if hood exhausts greater than 400 CFM,sec 505.2 SECTION 26.575.150
ET=exhausts terminate 3'from prop line and openings,10'from intakes,
501.3.1
IT=intake openings 10'from lot line&contaminant sources(vents,streets), —
401.4 REVIEWED BY ZONING
D=fasten and seal all ductwork per 603.9
REFERENCES FROM 2015 IFGC 02/08/2023 bobn
DV=direct vent req'd,sec 303.3
CA=combustion air not taken from bedrooms,bathrooms or1 It should be known that this review shall
storage sec 303.3
not relieve the applicant of their
OD=outdoor appliances must be listed for outdoor use,sec 303.6 pp
REFERENCES FROM 2015 IECC responsibility to comply with the
F=new or replacement glazing shall not exceed 0.28 U-Value,NFRC label requirements of the City of Aspen.The
required,Ordinance 40,2016 review and approval by the City is
L=75%of lamps in permanently installed lights must be high efficacy,sec offered only to assist the applicant's
R404.1
SE=Continuous air barrier required;all exterior joints,cracks,and holes to be understanding of the applicable Land
caulked,gasketed,sealed,table R402.4.1.I Use Code requirements.The issuance
REFERENCES FROM 2014 NEC of a permit based on construction
EP=electric panel'happy space'30"x36"x78",not in storage,sec 110.26 documents and other data shall not
prevent the City of Aspen from
requiring the correction of errors in the
construction documents and other
data.
Reviewed by Engineering
12/16/2022 11:49:16 AM
[rfl
"It should be known that this review shall not
relieve the applicant of their responsibility to
comply with the requirements of the City of
Aspen.The review and approval by the City is
29/2023 DI offered only to assist the applicant's
understanding of the applicable Engineering
RSCOltaiiiiiANCE requirements."The issuance of a permit based
]imp on construction documents and other data shall
not prevent the City of Aspen from requiring the
correction of errors in the construction
documents and other data.
41
opNlik
1/i,/ R Owner Responsibilities:
CITY OF ASPEN 1. The project owner,an agent of the owner,or the design professional in responsible charge acting
as the owner's agent,is responsible for employing special-inspection services.The special G. Building Department Responsibilities:
inspector/agency shall not be in the employ of the contractor,Subcontractor or material supplier. 1. Approve special-inspection program.The building department shall approve all special
SPECIAL INSPECTION AND TESTING AGREEMENT [IBC Sec 1704.1)In case of an owner/contractor,the special inspector\agency shall be employed inspectors and special-inspection requirements.
This form is required forprojects needingspecial inspection and/or testingper Chapter 17 of the International as specified by the building official.
q P P p C. Design Professional in Responsible Charge Responsibilities: 2. Enforce special inspection.Work requiring special inspection and the building inspector shall
Building Code(IBC). monitor the performance of special inspectors.His/Her approval,in addition to that of the special
Design Professional in Responsible Charge defniiicer:An individual who is registered or licensed to
Project Address: 1470 Tiehack Permit Number: 0058-2022-BRES a des tension as defined b the statutory practice then inspector,must be obtained prior to placement of concrete,covering of structural steel,or other
1 respectiv ign pro y ry requirements of the professional registration laws of the state or
jurisdiction in which the project is to be constructed;who is engaged by the owner to review and coordinate certain Similar materials.
BEFORE A PERMIT CAN BE ISSUED:The owner,or the design professional in responsible charge,acting as aspects of the project,as determined by the building official,for corn tibili with the 3. Review inspection reports.The building official should review special-inspection progress and
the owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing structure. Pa tY design of the building or final reports.
Schedule,including the required acknowledgments.A pre-construction conference with the parties involved may be 1. Prepare statement of special inspections.The registered design professional in responsible 4. Perform final inspection.The building official should perform the final inspection and approval
required to review the special-inspection requirements and procedures. charge stall prepare a statement of special inspections in accordance with IBC Section 1705 for for a project[IBC Sec.109.3.1]after the final special-inspection report has been reviewed and
APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the projects for submittal by the applicant.The statement of special inspections shall identify the following: approved.
which they provide special inspections.Special inspectors shall be approved by the building department prior to a. The materials,systems,components and work required to have special inspection or
performing any duties.Special inspectors shall submit their qualifications and are subject to personal interviews for testing by the building official or by die registered design professional responsible for
pre-qualification.Special inspectors shall display approved identification,as stipulated by the building official, each portion of the work.
when performing the function of special inspector. b. The type and extent of each special inspection.
c. The type and extent of each test
Special inspection and testing shall meet the minimum requirements of the International Building Code Section d. For each type of special inspection,identification as to whether it will be contitmous Project Address: 1470 Tlehack Permit Number: 0058-2022-BRES
1704.The following conditions are also applicable: special inspection or periodic special inspection
A. Special Inspector Responsibilities: D. Contractor Responsibilities: ACKNOWLEDGMENTS
1- Notify the special inspector.The contractor is responsible for notifying the special inspector or I have read and agree to comply with the conditions of this agreement.
1. Signify presence at job site.Special inspectors should notify contractor personnel of their agency regarding individual inspections for items listed on the attached schedule and as noted on
presence and responsibilities at the job site.If required by the building official,they shall sign in the building department approved plans.Adequate notice shall be provided so the special inspector
on the appropriate form posted with the building permit. has time to become familiar with the project.
2. Observe assigned work.The special inspector shall observe assigned work for conformance with 2. Provide access to approved plans.The contractor is responsible for providing the special
inspector access to approved plans. Special Inspection Signature Printed Name Date Email
the building department approved(stamped)design drawings,specifications,and applicable 3. Retains al inspectionUponrequest, Agency***
workmanship provisions of the International Building Code.Architect\engineer-reviewed shop Peail records. m the contractor is also responsible for retaining,
at the ab ic o special inspection records completed by the special inspector. 1470 Tieback LLC y 3/27/23
drawings may be used only as an aid to inspection. E. Inspection of Fabricators: PP � 9 p
Chris Ca s chris k cca ital.com
For continuous special-inspection,the special inspector shall be on site at all times observing the 1. Fabrication of structural assemblies and members.Where fabrication of structural load-bearing Owner* Signature Printed Name Date Email
work requiring special inspection.Periodic inspections,if any,must have prior approval based on members and assemblies is being performed on the premises of a fabricator's shop,IBC Section
a separate written plan reviewed and approved by the building department and the engineer or 1704.2 shall require special inspection of the fabricated items.
architect of record. 2. Fabrication and implementation procedures.The special inspector stall verify that the Design Professional in Signature Printed Name Date Email
3. Report nonconforming items.The special inspector shall bring nonconforming items to the fabricator maintains detailed fabrication and quality control procedures that provide a basis for Responsible Charge**
immediate attention of the contractor and note all such items in the daily report.If any item is not inspection control of the workmanship and the fabricator's ability to conform to approved B2 Builders Mark Janian 3/27/23
resolved in a timelymanner or is about to be incorporated in the work,the special inspector shall construction documents and reference standards.Thespecial p mark@b2aspen.com
rp p p inspector shall review the procedures Contractor Signs a Printed Name Date Email
immediately notify the building department by telephone or in person,notify the engineer or for completeness and adequacy relative to code requirements for fabricator's scope of work.
F. Approved Fabricator Responsibilities:
architect,and post a discrepancy notice. 1. Fabrication exempt lions.
4. Provide timely reports.The special inspector shall complete written inspection reports for each P Pec Special inspections are not requited where
is dote on the Approved Signature Printed Name Date Email
inspection visit and provide the reports on a timely basis determined by the building official.The premise of a fabricator registered and approved to perform such work without special inspection. PP g
special inspector or inspection agency shall furnish these reports directly to the building official, if work is done on site that requires special inspection,special inspection will be required. Fabricator***
engineer or architect of record,and others as designated.[IBC Sec.1704.1.2]These reports should 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written
be organized on a daily format and maybe submitted weekly at the option of the building official. procedural and quality control manuals and periodic andiing of fabrication practices by an Email
These reports should include: approved special inspection agency. Inspected Signature Printed Name Dale
3. Completion of fabrication.Upon completion of fabrication,the a Fabricator***
a. Description of daily inspections and tests made with applicable locations, P approved fabricator shall submit ,
b. Listing of nonconforming items, certificate of compliance to the building official stating that the work was perfomned in accordance .', �
with the approved construction documents. CjtyofAspen Building ,...-y Jim Pomeroy 3/27/23 jim.pomeroy@aspen.gov
c. Report on how nonconforming items were resolved or unresolved as applicable, Department: 'Signamre Printed Name Date Email
d. Itemized changes authorized by the architect,engineer,and building official if
not included in nonconforming items 'See a list of who may sign as the owner on page 2.
5. Provide Final Inspection Report.The special inspector shall submit a written final report **The Design Professional in Responsible Charge is not required to sign if they perfomm the duties as described in item C above.
documenting required special inspections and correction of any discrepancies noted in the ***Either the Approved Fabricator or Inspected Fabricator must sign.If all work is performed in the shop elan Approved Fabricator,the Special
inspections prior to the final building inspection. Inspection Agency signature is not required(no field work).
13o South Galena Street Aspen,CO et611-1975 I P,970.920.5000 I F:970.920.5197 I cityofaspen.com a.env4t
l l l 130 South Galena Street As...�. �`^^ p*n,C0816».1975I P.970.920.5000 I F,970.920.51971 c Rye face
G. Building Department Responsibilities: G. BuildingDepartment Res M1ilities:
G. Building Department Responsibilities: I. Approvespecial-inspection The building department shalllls 1 Responsibilities:
Approve speniatins sPecia pe program. g pnnlnrn approve a special
I. A pection pro I. Approve special-inspection program.The building department shall approve all special
gum.The building department shall approve all special inspectors and special-inspection requirements.
inspectors and special-inspection requirements_ 2. Enforces 1 inspection.Work 1 in d the building tor shall inspectors and special-inspection requirements.
2. Enforces 1 ins peels peen requ'vhmg specie inspection an g inspector 2. Enforce special inspection.Work re al inspection and the building tor shall
special inspection.Work requiring special inspection and the buildingmonitor the performance of special inspectors.His/Her approval,in addition to that of the special pxia pee'on. requiring sped p g inspector
inspector shall monitor the performance of special inspectors.His/Her approval,in addition to that of the special
monitor the performance of special inspectors.His/Her approval,in addition to that of the special inspector,must be obtained prior to placement of concrete,covering of structural steel,or other
inspector,must be obtained prior to placement of concrete.covering of s ructmal steel or other similar materials. inspector,must be obtained prior to placement of concrete,covering of structural steel,or other
similar materials. 3. Review inspection reports.The building official should review special-inspection progress and similar materials.
3. Review inspection reports.The building Official stead review special-inspection 3. Review inspection reports.The building official should review special-inspection progress and
progress and final reports.
final reports.
final reports. plOBre 4. Perform final inspection.The building official should perform the Mal inspection and approval q, Perform Mal inspection.The building official should perform the final inspection d approval
4. Perform final inspection.The building official should perform dr final inspection and approval fora project[IBC Sec.109.3.1]after the final special-inspection report has been reviewed and fora t IBC Sec.]09.3.1 after the final special-inspection r r[has beevmreviewed avdva
project[ ] report for a project[IBC Sec.109.3.1]after are final special-inspectionreport has been reviewed and approved. approved.
approved.
Project Address: 1470 Tiehacker•. 0058-2022-BRES Project.Address: 1470 Tiehack Permit Number: 0058-2022-BRES Project Address: 1470 Tiehack Permit Number: 0058-2022-BRES
Permit Numb
ACKNOWLEDGMENTS ACKNOWLEDGMENTS
ACKNOWLEDGMENTS f have read and a to Iwith the conditions of this agreement.
I have read and agree to comply with the conditions of this agreement -rr- agree y seamen / I have read and agree to comply with the conditions of this agreement.
lrlU inin.1- 1 cWagA-nglaiejl "4LePt�rfrNi a ailiv`e,,6ffgjbJ
Sprvni Inspection Signature Primed Name Dale Email Special Inspection re Printed Name Date Email�Off f 1.4007 '` Special Inspection Signature Printed Name Date Email
Aged.... Agency*** Agcocy«««
rant Tieback LLC Chris Capes 1470Ttehack LLC Chris Capps 3/27/23 chris@k9ccapital.com 1470 Tlehack LLC Chris Capps 3/27/23 chris@kgccapital.com
3/27/23 chris@kgccapltal.com
Owner. Signature printed Name Irate Bn 7 Owner* Signature Printed Name Date Email Owner' Sigva ��((�� Printed Name Date Email
DB Structural Design,Ltd .�L. Nate Decker,PE 03.29.23 nate0Adbsd.mm
Design Professional in 5ignalum Printed Name Date Email Design Professional in Signature Printed Name Date Email Design Professional in Signtimre Printed Name Date Email
Responsible Charge.. Responsible Charge*• Responsible Charge.*
Corrector Signature Primed Name Date Email Contractor Signature Printed Name Date Email Contractor Signature Printed Name Date Email
ApprovedFaber s * Signature Printed Nine Date Email Approved Signature Printed Name Date Email Approved Signature Printed Name Date Email
r Fabricator.*' Fabricator***
r� SS � ! �/ q,-. 7(� Inspected Si ture Printed Name Date Email
ed Si ` Printed
er Qf it ' Ptu�^�O`f-f Inspected Signature Printed Name Date EmailDana
Fabricator'** d J Fabricator«u Fabricator***
City of Aspen Building City of Aspen Building City of Aspen Building
Department Signature Printed Name Date Email Department: Signature Printed Name Date Email Department: Si... Printed Name Date Email
'Seea list of nho al O p
v sign owner on e 'See a r or who stay sign as the owner en page 2. .see alist of who may sign an the owneron Paget.
''is Design Dot -anal Responsible iv required gnifthey pert 00du4,xasdesnibna in item C above. "'ton Design Professional'ResponsibleC� ,nquvM sign hither perform the dudes as described in imv Cebwe. mile Design Professnon,in Responsible Charge cod if they perform the duties as descdbedmitemCabwe.
^*ENath Approved Fabricator 1 aiFabrics...si�lfdl xoat.isp performed '••Either NeA Approved b' N Fabricator •••Either the Approved Fabricator or Inspected Fab' tsigo.Ifail works perMrnand in the shop ofan Approved Fabricator,the Special
Inspection Agercr-s gnatura is notrequired fm hold xvk). shop of Fabduq.the Special Ins Pero must sign.If work is performed Me ofao Approved Fabricator, Spsial Inspection Agency signature is not reviled(no field work)mu
Inspection Agency sign.a is not required(no tied work).
t5o South Galena Street Aspen CO MM.,I p:970.92(1500(3 I F:970.920.5197 ',,.,.pence:- tin South G.lana Shoe Aapan.COn,i,vn751 p:9)0.920.500e IF:970.920.519)le,irot.se.r.eom .,re�w-