Loading...
HomeMy WebLinkAboutSub Permit.315 E Hyman Ave.0011-2023-BCOM (2) 2/27/25,2:58 PM 0008-2024-BCHO-Salesforce-Enterprise Edition • Close Window salesforce • Print This Page • Expand All I Collapse All 0008-2024-BC HO Number 0008-2024-BCHO Record Type Change Order Address 315 E HYMAN AVE 104 Owner Sydney Fallon Original Number 23-4364 Status Closed-Final Type Change Order Reason for Cancel or Comp!. Review Fail Applicant Christopher Vandall Aspen Internal? No Account OZArchitecture Required Bond Amount Project Total Available Bond Amount Land Use Planning Application Bluebeam Project Id 228-943-935 Master Building Permit 0011-2023-BCOM HPC-ZON-EH-UTIL Review HPC Rev,EH-Food Rev, Permit Contractor GF WOODS CONSTRUCTION INC HPC-ZON-EH-UTIL Review-2 Valid Business License on Eng Review #Error! Account Imported Parks-Prkng-San Review Required Submissions Conditional Inspections Documents Resubmitted Conditional Final Insp Approved Covid-19 Plan Action Items Hold All Reviews Create Fees ./ Hold Reason Create Fees 2 ,/ Conditional Flat Fee Formula Price Book 2023 Conditional Tiered Fee Formula Applicant is a Nonprofit? No Conditional Tiered SqFt Fee Discount All Fees(%) Formula Fee Discount Reason Queue Score Project Designation Additional Information Milestone Current Days in 0 Applicant Hand Queue Designation Response to Comments-Simple Milestone Current Days in City 13 Hands Queue Score 0 Milestone-Total Days in 3 Applicant Hand Last Date Received from Milestone-Total Days in City 123 Applicant Hands Dates New Application Date 12/19/2023 TCO Issuance Date Application Complete Date 1/30/2024 Close/CO Issuance Date 11/13/2024 Application Accepted Date 1/30/2024 Last Activity Date Issue Date 7/30/2024 Expiration Date Days to Issue 182 Due Date Override Expiration Date Basic Information Description Kitchen Equipment Replacement-New grease exhaust Census Code **Change Order hood and duct,new make-up air unit,and new wall mounted HVAC unit with condensing unit. Use of Building Commercial Use Class Commercial Class of Work Other Permit Comments Job Location Address 315 E HYMAN AVE 104,ASPEN:273718217104 Lot Site Address Display on Map Legal Description Subdivision:WHEELER SQUARE Unit:104 https://cityofaspen.my.salesforce.com/a038X00002NrDnnVQAV/p 1/17 2/27/25,2:58 PM 0008-2024-BCHO—Salesforce-Enterprise Edition Historic Property? No Eden Address Historic District? Yes HPC-Planning-Zoning Details Zone District CC HOA/Covenant Property Not Subject to HOA or Covenant Is There an ADU? No HPC Certificate of No Appropriateness? ADU Sq Ft 0 Work Involves a Land Use No Approval? Deed Restricted? No Located in a PD? No #of Dwellings 0 Adds/Changes Floor Area? No Category of Zoning Fee Change Order Occupancy or Use Change? No Zoning Work Level Work Affects Exterior of Yes Building? Building Project Details Valuation $100,000.00 Lot Size Sq.Ft. 0 Reason for Valuation Change New work Soil Disturbance Sq Ft 0 Unit Sq.Ft. 472 Affected Area Sq Ft 0 Building Footprint Sq Ft Existing Hardscape Footprint Sq 0 Ft Sq Ft of Building Work Area 472 Existing Hardscape%of Lot #Error! Building Fire Area Sq Ft Con Mit Sq Ft Total 472 Utility Review Sq.Ft. 0 Utility Review Sq Ft Total 0 of Interior being Altered 100% New Sq.Ft. 0 Scope of Work Details Work Changes Building No Work Affects Tree/Drip Line? No Footprint? Work Changes No Located Within City Mall No Fenestration/Thrml Envelop? Boundaries? Requires Asbestos Test? No Adjacent to City Open Space? No Photovoltaic Installation No Impacts City Trails/Parks? No Work Adds/Removes/Changes No Work Subject to Water Efficient No Plumbing Fixt? L.O.? Restaurant/Food Service Yes Involves Impact on Sewer? No Involved? Change of Restaurant No Prevents Access to Sewer Main? No Ownership? Affects Parking/Alleys/Loading? No Sewer Easements Affected? No Utility Water Details Already on City Water? Class of Service Customer Utility Account Number Water Service Area Water Service Agreement Is There Well or Wells on the Required? Property? Common Building Name Abandon Existing Well Abandon Existing Tap Acre-feet of Water Currently by Well Date of Existing Tap Acre-feet of Water Rights to be Conveyed Existing Tap Modifications? Existing ECU Count New Tap? If Residential App,Estimated New ECUs Date of New Tap Final ECU Count Does Project Involve Outdoor Size of Existing Domestic Water Irrigation? Line Irrigated Area Sq Ft Number of Meters Proposed Identify ALL Sources of Water Size of Existing Fire Suppression Line Is There a Pool,Spa or Water Size of Proposed Domestic Feature? Water Line Summary of Prior Water Fees Size of Proposed Fire Paid Suppression Line Building Description Code Editions 2015 IEBC Required Special Inspections https://cityofaspen.my.salesforce.com/a038X00002NrDmVQAV/p 2/17 2/27/25,2:58 PM 0008-2024-BCHO—Salesforce-Enterprise Edition Other Code Editions Energy Code Compliance Building Type(IRC) Total Snowmelt Sq Ft 0 Construction Type VA Total Spa Sq Ft 0 Fire Sprinkler Existing? Yes Total Pool Sq Ft 0 Fire Sprinkler Required? Yes Amount of Onsite Renewable No Generation? Fire Sprinkler Type NFPA 13 CO Description Fire Alarms Installed? NFPA 72 Basement #Wood Fireplaces 1st Floor #Gas Log Fireplaces 2nd Floor #Gas Appliances 3rd Floor Open Text Field For Comments Additional Financials Total Fees $5,151.25 Total Payments $5,151.25 Total Balance $0.00 System Information Number 0008-2024-BCHO Community Visibility Bluebeam Project Id 228-943-935 Contact IDs 0038X00003ngDB4QAM,0036A00000ZPoEJQA1 BB Project Name 315 E HYMAN AVE 104-0008-2024-BCHO IsTestData? Created By Christopher Vandall,12/19/2023 10:21 AM Last Modified By Bonnie Muhigirwa,11/13/2024 10:22 AM VIP Form Tool VIP 12/19/2023 VIP Permit Application Submitted 11:40AM Form Template VIP VIP [{"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwyPUAS"), Foreign Template {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvNUAS"), Language Status {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000iWidUAE"), {"parentCategoryld":nulrisSu bmir nu I I,"isCu rrenn n ull,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvVUAS"}, {"parentCategoryld":nulrisSu bmir nu I I,"isCu rrenn n ull,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvKUAS"}, {"parentCategoryld":nulrisSu bmir nu I risCu rrenn n ull,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvXUAS"}, {"parentCategoryld":nulrisSu bmir nu I risCu rrenn n ull,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000Uwva UAC"), {"parentCategoryld":nulrisSu bmir nu I I,"isCu rrenn n ull,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvZUAS"), {"parentCategoryld":null,"isSubmit":true,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000Ux1 dUAC")] Action Items View/Print Permit Link Attachment Activity History Email:Building Permit 0008-2024-BCHO-315 E HYMAN AVE 104,ASPEN:273718217104-Issued Type Billable Assigned To Martyna Wojtkowska Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 7/30/2024 Days in Applicant's Hands Comments To:cvandall@ozarch.com CC:greg@gfwoods.com BCC: Attachment:Building_-_Permit_Issuance_and_Use_Tax_Letter_20240730.pdf Subject:Building Permit 0008-2024-BCHO-315 E HYMAN AVE 104,ASPEN:273718217104-Issued Body: Christopher Vandall, Please find attached your issued building permit for 0008-2024-BCHO for 315 E HYMAN AVE 104,ASPEN:273718217104 and City Use Tax exemption letter,if applicable. Below is a link to your plans.Please print these 24x36 in color and keep them on site at all times.As a reminder,links will expire in 30 days so please download the plans as soon as you get this email. https://cityofaspen.sharepoi nt.com/:f:/s/COA-Issued Bu i Id i ng Plans P u bl icRecords/Eq kU V h cydMhCgYcVfj M F W PQB9g45BUo-3xhHODbYxQla9g? e=6CrEXT All inspections are scheduled through the Salesforce applicant portal. BUILDING INSPECTIONS REQUESTED BY 7:30 PM WILL BE SCHEDULED FOR THE NEXT BUSINESS DAY.REQUESTS AFTER 7:30 PM WILL BE SCHEDULED FOR THE FOLLOWING BUSINESS DAY.ALLOW THE ENTIRE DAY FOR THE INSPECTION. https://cityofaspen.my.salesforce.com/a038X00002NrDmVQAV/p 3/17 2/27/25,2:58 PM 0008-2024-BCHO—Salesforce-Enterprise Edition PLEASE NOTE THAT ALL REFERRAL AGENCIES MUST APPROVE THEIR FINAL INSPECTIONS PRIOR TO THE FINAL BUILDING INSPECTION. WHAT INSPECTIONS DO I NEED?Please visit here:https://www.aspen.gov/DocumentCenterlView/7847/-What-Inspections-are-Needed-for-my-Permit? bidld= HOW TO SCHEDULE AN INSPECTION ONLINE?Please visit here:https://www.aspen.gov/DocumentCenterNiew/6436/How-to-request-an-inspection? bidld= For questions on inspections please email buildinginspectors@aspen.gov If you are experiencing system issues,please contact sfsupport@cityofaspen.com or call 970-920-5065. Email:Permit Fees Due:0008-2024-BCHO at 315 E HYMAN AVE 104,ASPEN:273718217104 Type Billable Assigned To Martyna Wojtkowska Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 7/16/2024 Days in Applicant's Hands To:cvandall@ozarch.com CC: BCC: Attachment:--none-- Subject:Permit Fees Due:0008-2024-BCHO at 315 E HYMAN AVE 104,ASPEN:273718217104 Body: If you have not already paid the fees due on your permit 0008-2024-BCHO,at 315 E HYMAN AVE 104,ASPEN:273718217104,please log into the Aspen Permitting Portal to pay them.If you pay online,be aware that credit card or e-check transaction fees will apply. If you would like to pay by check,you can mail payments to the following locations: •Building and related permits:Community Development,427 Rio Grande •Parking Reservation permits:Parking Department,427 Rio Grande •Pitkin County Water Permit:Utility Billing.,427 Rio Grande •ROW and encroachments:427 Rio Grande Comments •Tree permits:Parks Dept.,585 Cemetery Lane Aspen •Utility Connection Permits:Utility Billing.,130 S Galena,1st Floor •Electric Community Investment Fee:Utility Billing.,130 S Galena,1st Floor Current Amount Due:$5,151.25 Instructions to see detail of fees due: -Log in to the Portal here:https://cityofaspen.force.com and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible,click the"View All"link -To filter fees,click on the black funnel icon at the top right.(Example:to only see the fees due at permit submission,select"Complete Pending Submittal Fees"under Permit Fees Due At section and then click Apply button.) Instructions to pay fees are found here:https://www.aspen.gov/DocumentCenter/View/5008/Paying-for-an-Application-?bidld= Thank you! City of Aspen Email:Building Comments-0008-2024-BCHO-315 E HYMAN AVE 104 Type Billable Assigned To Nick Thompson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 6/21/2024 Days in Applicant's Hands Comments To:cvandall@ozarch.com CC:denis.murray@aspen.gov;sydney.fallon@aspen.gov BCC: Attachment:0008-2024-BCHO_Bu ild ingComments_2.pdf Subject:Building Comments-0008-2024-BCHO-315 E HYMAN AVE 104 Body: Hello Christopher Vandal!, I've reviewed your responses;please see the attached comment list.Please contact me directly if you have any questions on the comments.You may resubmit your responses online when you have received comments or approval from all applicable review agencies.Please be sure to reach out to your permit coordinator to ensure you've received all applicable comments prior to uploading responses.Once you have uploaded you comments online, please email your permit coordinator directly to notify them as they will not receive an automated email from our system. Address:315 E HYMAN AVE 104 Permit Number:0008-2024-BCHO Permit Coordinator:Sydney Fallon These design documents have been reviewed for conformance to the International Codes as adopted and amended by the City of Aspen.State and Federal regulations are administered where applicable.You can find a copy of all adopted codes,ordinances,and policies on our website. The attached corrections are required to be addressed.Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list.Indicate which detail or specification page shows the required information. Responses such as"will comply with code"are not adequate.Revised drawings must clearly show code compliance. https://cityofaspen.my.salesforce.com/a038X00002NrDmVQAV/p 4/17 2/27/25,2:58 PM 0008-2024-BCHO—Salesforce-Enterprise Edition Building plan check is only one part of the often complex process by which projects are reviewed for approval.These parts are interrelated and are sometimes conflicting.It is ultimately the applicant's responsibility to coordinate these requirements. Nick Thompson Plans Examiner/Building Inspector III Community Development 427 Rio Grande Place Aspen,CO 81611 p:970.429.2757 c:970.456.5165 nick.thompson@aspen.gov www.aspen.gov Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning and/or applicable building code regulations which are subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email:Building Comments-0008-2024-BCHO-315 E HYMAN AVE 104 Type Billable Assigned To Nick Thompson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 5/7/2024 Days in Applicant's Hands To:cvandall@ozarch.com CC:denis.murray@aspen.gov;sydney.fallon@aspen.gov BCC: Attachment:0008-2024-BCHO_Bu ild ingComments_1.pdf Subject:Building Comments-0008-2024-BCHO-315 E HYMAN AVE 104 Body: Hello Christopher Vandal!, I've reviewed your permit application;please see the attached comment list.Please contact me directly if you have any questions on the comments.You may resubmit your responses online when you have received comments or approval from all applicable review agencies.Please be sure to reach out to your permit coordinator to ensure you've received all applicable comments prior to uploading responses.Once you have uploaded you comments online,please email your permit coordinator directly to notify them as they will not receive an automated email from our system. Address:315 E HYMAN AVE 104 Permit Number:0008-2024-BCHO Permit Coordinator:Sydney Fallon These design documents have been reviewed for conformance to the International Codes as adopted and amended by the City of Aspen.State and Federal regulations are administered where applicable.You can find a copy of all adopted codes,ordinances,and policies on our website. The attached corrections are required to be addressed.Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list.Indicate which detail or specification page shows the required information. Comments Responses such as"will comply with code"are not adequate.Revised drawings must clearly show code compliance. Building plan check is only one part of the often complex process by which projects are reviewed for approval.These parts are interrelated and are sometimes conflicting.It is ultimately the applicant's responsibility to coordinate these requirements. Nick Thompson Plans Examiner/Building Inspector III Community Development 427 Rio Grande Place Aspen,CO 81611 p:970.429.2757 c:970.456.5165 nick.thompson@aspen.gov www.aspen.gov Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning and/or applicable building code regulations which are subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email:315 E Hyman Ave.-0008-2024-BCHO-Historic Preservation Review Type Billable Assigned To Stuart Hayden Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 2/27/2024 https://cityofaspen.my.salesforce.com/a038X00002NrDmVQAV/p 5/17 2/27/25,2:58 PM 0008-2024-BCHO—Salesforce-Enterprise Edition Days in Applicants Hands To:cvandall@ozarch.com CC: BCC: Attachment:HP Comments.0008-2024-BCHO.20240227.pdf Subject:315 E Hyman Ave.-0008-2024-BCHO-Historic Preservation Review Body: Comments Mr.Vandall, I have attached the Historic Preservation staff review comments for permit#0008-2024-BCHO at 315 E HYMAN AVE. Please let me know if you have any questions. Dutifully, Stuart Email:City of Aspen-Application Status:Completeness Review Failed Type Billable Assigned To Sydney Fallon Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 1/5/2024 Days in Applicant's Hands To:cvandall@ozarch.com CC: BCC: Attachment:--none-- Subject:City of Aspen-Application Status:Completeness Review Failed Body: Dear Christopher Vandall, Comments Your Permit Application#23-4364 for 315 E HYMAN AVE 104,ASPEN:273718217104 is in the"Completeness Review Failed"Status because of the following: -need updated HOA and contact pages -spec sheets for all new equipment Please contact Sydney Fallon with any questions at sydney.fallon@services.cityofaspen.com. Thank you, City of Aspen Email:Your Permit Application 23-4364 for 315 E HYMAN AVE 104,ASPEN:273718217104 has been received! Type Billable Assigned To Christopher Vandall Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 12/19/2023 Days in Applicant's Hands To:cvandall@ozarch.com CC: BCC: Attachment:--none-- Comments Subject:Your Permit Application 23-4364 for 315 E HYMAN AVE 104,ASPEN:273718217104 has been received! Body: Hello Christopher Vandall, We have received your application 23-4364 for 315 E HYMAN AVE 104,ASPEN:273718217104.A Permit Coordinator from the appropiate office will take ownership of your application,review it for completeness,and process it accordingly. The City of Aspen. Permit Review Type Building Billable ✓ Assigned To Denis Murray Number of Hours 6.00 Total Cost $1,950.00 Fee Generated Date 7/15/2024 Start Date Completed Date 7/15/2024 Days in Applicant's Hands Comments Contacts Christopher Vandall Account OZ Architecture https://cityofaspen.my.salesforce.com/a038X00002NrDmVQAV/p 6/17 2/27/25,2:58 PM 0008-2024-BCHO—Salesforce-Enterprise Edition Type Applicant Active Contractor License Count 0.00 Number 0064411 GREGORY WOODS Account GF WOODS CONSTRUCTION INC Type Contractor Active Contractor License Count 1.00 Number 0064412 Fees 0096918 Type Building Hourly Review Fee Total $1,950.00 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0092714 Type Change Order Fee Total $3,201.25 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full / Fee Paid Date/Time Files Building_-_Permit_Issuance_and_Use_Tax_Letter_20240730.pdf Building_-_Cover_Sheet_20240715.pdf Last Modified 7/30/2024 10:21 AM Last Modified 7/15/2024 11:56 AM Created By Martyna Wojtkowska Created By Denis Murray 0008-2024-BCHO_BuildingComments_2 0008-2024-BCHO_BuildingComments_1 Last Modified 6/21/2024 4:40 PM Last Modified 5/7/2024 12:53 PM Created By Nick Thompson Created By Nick Thompson HP Comments.0008-2024-BCHO.20240227 Permit Application 2023-12-19 18:40:30.pdf Last Modified 2/27/2024 7:02 PM Last Modified 12/19/2023 11:40 AM Created By Stuart Hayden Created By Christopher Vandal) Milestones Review Round 1 -0008-2024-BCHO Status Not Approved Due Date Created Date 1/30/2024 Review Round 2.0-0008-2024-BCHO Status Not Approved Due Date Created Date 3/25/2024 Review Round 3.0-0008-2024-BCHO Status Not Approved Due Date Created Date 5/21/2024 Review Round 4.0-0008-2024-BCHO Status Approved Due Date Created Date 7/2/2024 Open Activities Applicant Responding Type Time in Applicant's Hands Status In Progress Assigned To Emily Page Start Date 7/2/2024 Completed Date Comments https://cityofaspen.my.salesforce.com/a038X00002NrDmVQAV/p 7/17 2/27/25,2:58 PM 0008-2024-BCHO—Salesforce-Enterprise Edition Payments PY-022054 Related To 0008-2024-BCHO Amount $5,151.25 Created Date 7/29/2024 Payment Source R-0020590 Receipt-Amount Remaining R-0020590:$0 Permit History 11/13/2024 10:22 AM User Bonnie Muhigirwa Action Changed Status from Issued to Closed-Final. 7/30/2024 10:21 AM User Martyna Wojtkowska Action Changed Issue Date to 7/30/2024.Changed Status from Ready for Issue to Issued. 7/29/2024 10:40 AM User Martyna Wojtkowska Action Changed Total Payments from$0.00 to$5,151.25. 7/16/2024 11:17 AM User Martyna Wojtkowska Action Changed Status from Final Review Complete to Ready for Issue. 7/15/2024 2:27 PM User Denis Murray Action Changed Status from Final Review to Final Review Complete. 7/15/2024 2:21 PM User Denis Murray Action Changed Total Fees from$3,201.25 to$5,151.25.Changed Status from Permit Review to Final Review. 7/15/2024 2:21 PM User Denis Murray Action Changed Status from Final Review to Permit Review. 7/15/2024 12:06 PM User Sydney Fallon Action Changed Total Fees from$25.00 to$3,201.25. 7/15/2024 11:22 AM User Nick Thompson Action Changed Status from Permit Review to Final Review. 7/2/2024 4:44 PM User Sydney Fallon Action Changed Queue Designation from Applicant to Respond to Response to Comments-Simple. 7/2/2024 4:01 PM User Emily Page Action Changed Queue Designation from Additional Information to Applicant to Respond. 2/2/2024 10:00 AM User Sydney Fallon Action Changed Queue Designation to Additional Information. 1/30/2024 12:24 PM User Sydney Fallon Action Changed Number from 23-4364 to 0008-2024-BCHO.Changed Status from Application Completeness Review to Permit Review. 1/30/2024 12:24 PM User Sydney Fallon Action Changed Total Payments to$0.00.Changed Total Fees to$25.00.Changed Create Fees from false to true.Changed Status from Completeness Review Failed to Application Completeness Review. 1/5/2024 2:46 PM User Sydney Fallon Action Changed Status from New Application to Completeness Review Failed. 12/26/2023 3:44 PM User Sydney Fallon Action Changed Owner from PC-Comm Dev to Sydney Fallon. 12/19/2023 11:40 AM https://cityofaspen.my.salesforce.com/a038X00002NrDmVQAV/p 8/17 2/27/25,2:58 PM 0008-2024-BCHO—Salesforce-Enterprise Edition User Christopher Vandal) Action Changed Owner from Christopher Vandal)to PC-Comm Dev. 12/19/2023 11:40 AM User Christopher Vandal) Action Changed Status from Draft Application to New Application. 12/19/2023 10:53 AM User Christopher Vandal) Action Changed Bluebeam Project Id to 228-943-935. 12/19/2023 10:50 AM User Christopher Vandal) Action Changed Valuation to$100,000.00.Changed Address to 315 E HYMAN AVE 104,ASPEN:273718217104. 12/19/2023 10:21 AM User Christopher Vandal) Action Changed Number to 23-4364.Created. Reviews REV-037086 Milestone Review Round 4.0-0008-2024-BCHO Status Approved Type Building Due Date Completed Date 7/15/2024 11:21 AM Owner Alias NThom On Hold Created Date 7/2/2024 REV-036293 Milestone Review Round 3.0-0008-2024-BCHO Status Approved Type Zoning Due Date Completed Date 6/27/2024 11:17 AM Owner Alias SMont On Hold Created Date 5/21/2024 REV-036294 Milestone Review Round 3.0-0008-2024-BCHO Status Closed-Re-Review Created Type Building Due Date Completed Date 6/21/2024 4:41 PM Owner Alias NThom On Hold Created Date 5/21/2024 REV-036295 Milestone Review Round 3.0-0008-2024-BCHO Status Approved Type HPC Due Date Completed Date 6/24/2024 7:22 PM Owner Alias SHayd On Hold Created Date 5/21/2024 REV-035089 Milestone Review Round 2.0-0008-2024-BCHO Status Closed-Re-Review Created Type Zoning Due Date Completed Date 5/21/2024 11:21 AM Owner Alias SMont On Hold Created Date 3/25/2024 REV-035090 Milestone Review Round 2.0-0008-2024-BCHO Status Closed-Re-Review Created Type Building Due Date Completed Date 5/7/2024 12:53 PM https://cityofaspen.my.salesforce.com/a038X00002NrDmVQAV/p 9/17 2/27/25,2:58 PM 0008-2024-BCHO—Salesforce-Enterprise Edition Owner Alias NThom On Hold Created Date 3/25/2024 REV-035091 Milestone Review Round 2.0-0008-2024-BCHO Status Closed-Re-Review Created Type HPC Due Date Completed Date 5/21/2024 11:22 AM Owner Alias SHayd On Hold Created Date 3/25/2024 REV-034325 Milestone Review Round 1-0008-2024-BCHO Status Closed-Re-Review Created Type Zoning Due Date Completed Date 3/20/2024 1:23 PM Owner Alias bnarr On Hold Created Date 1/30/2024 REV-034326 Milestone Review Round 1-0008-2024-BCHO Status Closed-Re-Review Created Type Building Due Date Completed Date 3/25/2024 10:08 AM Owner Alias NThom On Hold Created Date 1/30/2024 REV-034327 Milestone Review Round 1-0008-2024-BCHO Status Closed-Re-Review Created Type HPC Due Date Completed Date 2/27/2024 7:14 PM Owner Alias SHayd On Hold Created Date 1/30/2024 REV-034328 Milestone Review Round 1-0008-2024-BCHO Status Approved Type EH Food Service Due Date Completed Date 2/16/2024 4:34 PM Owner Alias NTsev On Hold Created Date 1/30/2024 Submissions 30.Building Comments.20240515.pdf Actions Submission Date 5/15/2024 4:51 PM Status Required Description 90.Architectural Plans Comments 1.20240515.pdf Actions Submission Date 5/15/2024 4:51 PM Status Required Description 90.Electrical Plans Comments 1.20240515.pdf Actions Submission Date 5/15/2024 4:51 PM Status Required Description https://cityofaspen.my.salesforce.com/a038X00002NrDmVQAV/p 10/17 2/27/25,2:58 PM 0008-2024-BCHO—Salesforce-Enterprise Edition 90.Mechanical Plans Comments 1.20240515.pdf Actions Submission Date 5/15/2024 4:51 PM Status Required Description 90.Plumbing Plans Comments 1.20240515.pdf Actions Submission Date 5/15/2024 4:51 PM Status Required Description 90.Structural Plans Comments 1.20240515.pdf Actions Submission Date 5/15/2024 4:51 PM Status Required Description 30.Building Comments.20240628.pdf Actions Submission Date 6/28/2024 4:48 PM Status Required Description 90.Architecture Plans 2.20240628.pdf Actions Submission Date 6/28/2024 4:48 PM Status Required Description 90.Mechanical Plans 2.20240628.pdf Actions Submission Date 6/28/2024 4:48 PM Status Required Description 90.Plumbing Plans 2.20240628.pdf Actions Submission Date 6/28/2024 4:48 PM Status Required Description 90.Combined Drawings ASI 04.pdf Actions Submission Date 4/2/2024 1:23 PM Status Required Description 2024.03.12_GHA_ASI 4 Arch.pdf Actions Submission Date 4/2/2024 1:23 PM Status Required Description 90.Electrical Plans ASI 05.20240416.pdf Actions Submission Date 4/16/2024 4:07 PM Status Required Description 90.Combined Drawings ASI 04 05.20240416.pdf Actions Submission Date 4/16/2024 4:07 PM Status https://cityofaspen.my.salesforce.com/a038X00002NrDmVQAV/p 11/17 2/27/25,2:58 PM 0008-2024-BCHO-Salesforce-Enterprise Edition Required Description 90.Architectural Plans 20240429_wClouds.pdf Actions Submission Date 4/29/2024 7:27 PM Status Required Description 90.Commercial Bar Plans 20240429_wClouds.pdf Actions Submission Date 4/29/2024 7:27 PM Status Required Description 90.Commercial Kitchen Plans 20240429_wClouds.pdf Actions Submission Date 4/29/2024 7:27 PM Status Required Description 90.Electrical Plans 20240429_wClouds.pdf Actions Submission Date 4/29/2024 7:27 PM Status Required Description 90.Interior Design 20240429_wClouds.pdf Actions Submission Date 4/29/2024 7:27 PM Status Required Description 90.Mechanical Plans 20240429_wClouds_flat.pdf Actions Submission Date 4/29/2024 7:27 PM Status Required Description 90.Plumbing Plans 20240429_wClouds_flat.pdf Actions Submission Date 4/29/2024 7:27 PM Status Required Description 90.Structural Plans 20240429_wClouds.pdf Actions Submission Date 4/29/2024 7:27 PM Status Required Description 30.GHA_ASI-1_Kitchen 200-0 Equipment.20231219.pdf Actions Submission Date 12/19/2023 11:28 AM Status Required Description 90.Hood Design ASI-1.20231219.pdf Actions Submission Date 12/19/2023 11:28 AM Status Required Description 90.Mechanical Plans ASI-1.20231219.pdf https://cityofaspen.my.salesforce.com/a038X00002NrDmVQAV/p 12/17 2/27/25,2:58 PM 0008-2024-BCHO—Salesforce-Enterprise Edition Actions Submission Date 12/19/2023 11:28 AM Status Required Description 10.HOA Compliance Approval 20231024.pdf Actions Submission Date 1/16/2024 4:20 PM Status Required Description 30.GHA_ASI-R1_Kitchen 200-0 Equipment.20240116.pdf Actions Submission Date 1/16/2024 4:20 PM Status Required Description 90.Commercial Kitchen Equipment Specifications.20240116.pdf Actions Submission Date 1/16/2024 4:20 PM Status Required Description 90.Commercial Kitchen Equipment.20240116.pdf Actions Submission Date 1/16/2024 4:20 PM Status Required Description 90.Commercial Kitchen Plans ASI-1.20240116.pdf Actions Submission Date 1/16/2024 4:20 PM Status Required Description 90.Electrical Plans ASI-1.20240116.pdf Actions Submission Date 1/16/2024 4:20 PM Status Required Description 90.Hood Design ASI-1.20240116.pdf Actions Submission Date 1/16/2024 4:20 PM Status Required Description 90.Mechanical&Plumbing Plans ASI-1.20240116.pdf Actions Submission Date 1/16/2024 4:20 PM Status Required Description 90.Architectural Plans ASI 02.20240202.pdf Actions Submission Date 2/6/2024 2:14 PM Status Required Description 90.Electrical.AS 102.20240202.pdf Actions Submission Date 2/6/2024 2:14 PM Status Required https://cityofaspen.my.salesforce.com/a038X00002NrDmVQAV/p 13/17 2/27/25,2:58 PM 0008-2024-BCHO—Salesforce-Enterprise Edition Description 90.Mechanical Plans.ASI 02.20240202.pdf Actions Submission Date 2/6/2024 2:14 PM Status Required Description 90.Plumbing Plans.ASI 02.20240202.pdf Actions Submission Date 2/6/2024 2:14 PM Status Required Description 90.Structural Plans.ASI 02.20240202.pdf Actions Submission Date 2/6/2024 2:14 PM Status Required Description G H.P EX.Ltr_02-02-2024.pdf Actions Submission Date 2/6/2024 2:14 PM Status Required Description 90.Commercial Kitchen Equipment.20240116_clouds.pdf Actions Submission Date 2/6/2024 2:15 PM Status Required Description 30.Arch Narrative ASI 04.20240315.pdf Actions Upload Submission Date Status Required Description 30.ID Narrative ASI 04.20240312.pdf Actions Upload Submission Date Status Required Description 90.Architectural Plans ASI 04.20240315.pdf Actions Upload Submission Date Status Required Description 90.Combined Drawing Set ASI 04.20240315.pdf Actions Upload Submission Date Status Required Description 90.Electrical Plans ASI 04.20240315.pdf Actions Upload Submission Date Status Required Description 90.Food Service Plans ASI 04.20240315.pdf Actions Upload https://cityofaspen.my.salesforce.com/a038X00002NrDmVQAV/p 14/17 2/27/25,2:58 PM 0008-2024-BCHO—Salesforce-Enterprise Edition Submission Date Status Required Description 90.ID Plans ASI 04.20240315.pdf Actions Upload Submission Date Status Required Description 30.Arch Narrative ASI 04.20240315.pdf Actions Upload Submission Date Status Required Description 30.ID Narrative ASI 04.20240312.pdf Actions Upload Submission Date Status Required Description 90.Architectural Plans ASI 04.20240315.pdf Actions Upload Submission Date Status Required Description 90.Combined Drawing Set ASI 04.20240315.pdf Actions Upload Submission Date Status Required Description 90.Electrical Plans ASI 04.20240315.pdf Actions Upload Submission Date Status Required Description 90.Food Service Plans ASI 04.20240315.pdf Actions Upload Submission Date Status Required Description 90.ID Plans ASI 04.20240315.pdf Actions Upload Submission Date Status Required Description 30.Arch Narrative ASI 04.20240315.pdf Actions Upload Submission Date Status Required Description 30.ID Narrative ASI 04.20240312.pdf Actions Upload Submission Date Status Required Description https://cityofaspen.my.salesforce.com/a038X00002NrDmVQAV/p 15/17 2/27/25,2:58 PM 0008-2024-BCHO—Salesforce-Enterprise Edition 90.Architectural Plans ASI 04.20240315.pdf Actions Upload Submission Date Status Required Description 90.Combined Drawing Set ASI 04.20240315.pdf Actions Upload Submission Date Status Required Description 90.Electrical Plans ASI 04.20240315.pdf Actions Upload Submission Date Status Required Description 90.Food Service Plans ASI 04.20240315.pdf Actions Upload Submission Date Status Required Description 90.ID Plans ASI 04.20240315.pdf Actions Upload Submission Date Status Required Description 30.ID Narrative ASI 04.20240312.pdf Actions Submission Date 3/25/2024 9:54 AM Status Required Description 90.Architectural Plans ASI 04.20240315.pdf Actions Submission Date 3/25/2024 9:54 AM Status Required Description 90.Food Service Plans ASI 04.20240315.pdf Actions Submission Date 3/25/2024 9:54 AM Status Required Description 90.Electrical Plans ASI 04.20240315.pdf Actions Submission Date 3/25/2024 9:54 AM Status Required Description 90.Combined Drawing Set ASI 04.20240315.pdf Actions Submission Date 3/25/2024 9:54 AM Status Required Description 30.Arch Narrative ASI 04.20240315.pdf Actions Submission Date 3/25/2024 9:54 AM Status https://cityofaspen.my.salesforce.com/a038X00002NrDmVQAV/p 16/17 2/27/25,2:58 PM 0008-2024-BCHO-Salesforce-Enterprise Edition Required Description 90.ID Plans ASI 04.20240315.pdf Actions Submission Date 3/25/2024 9:54 AM Status Required Description Copyright©2000-2025 salesforce.com,inc.All rights reserved. https://cityofaspen.my.salesforce.com/a038X00002NrDmVQAV/p 17/17