HomeMy WebLinkAboutFile Documents.420 E Durant Ave.0045-2023-BCOM (3) 0 ,, City of Aspen Building Permit Application Checklist
for Commercial and Multifamily Projects (2021 IBC)
CITY OF ASPEN
PROJECT ADDRESS 420 E Durant Ave DATE 7/26/2023
Note:This checklist is specific to Building Department requirements for various building permit application types.For Zoning, Engineering,Parks,
Utilities,and WELS requirements visit their pages at http://www.aspen.gov.
Building permit application submissions must include ALL the Submittal Requirements on this checklist or they will not be accepted. Refer to the
Commercial and Multifamily Building Submittal Guide for more information about each requirement. Submittal guides,required forms and other
resources can be found in the Building Department Document and Resource Library.
Submit all documents and drawings in PDF format via the Salesforce portal.Follow File Preparation Standards for all files submitted.
REQUIRED 8 %" X 11" DOCUMENTS
Submittal New Addition Alteration/ Alteration Demo Repair
Requirements Construction Remodel (Interior only) (Complete)
Permit
Ap
plication Packet*
Packet*
Asbestos test and
clearance reports
State Asbestos
Demolition
Approval Notice
Fireplace
Registration Form
&Manufacturer's
installation
instructions
Energy Code
Compliance
(REScheck,
COMcheck, or
prescriptive path)
U-Factor
Fenestration
Docs
REMP documents
Line Grade
Verification Form
Signed Special
Inspection and
Testing
Agreement U
Updated 5/23/23 Page 1 of 6
08/11/2023
ASPEN
BUILDING DEPARTMENT
Submittal New Addition Alteration/ Alteration Demo Repair
Requirements Construction Remodel (Interior only) (Complete)
Verification of
Structural
Integrity
Structural
Calculations
Soils Report
Mechanical Docs
Photos
Unit/Building
relationship
Benchmarking
Agreement
Energy
Assessment
Report
(residential only)
CMP**
Residential ECU
Calculator**
Water/sewer 11111r VI"
Service
Disconnect
Applications
*Permit Application Packet must be filled out entirely or your submission will not be accepted.
**CMP and ECU Calculator are common Engineering requirements; contact Engineering to discuss.
RECEIVED
Updated 5/23/23 Page 2 of 6
08/11/2023
ASPEN
BUILDING DEPARTMENT
REQUIRED 24"x36" PLANS
Note: Sheets must be in the following order. Existing plans required for all additions &alterations.
Submittal New Addition Alteration/ Alteration Demo Repair
Requirements Construction Remodel (Interior only) (Complete)
Cover Sheet
Survey
Area Sheet
Work Area/Demo p.
Plans
i v
Fenestration Area
Drawings
Site Plan
CREMP/RREMP
Plan
Floor Plans:
Existing &
Proposed
Reflected Ceiling
Plans
Lighting Plan w/
spec sheet(s)
Occupancy/
Means of Egress
Plans
Separation/Fire
Resistance Plans
Fire Resistant
Assembly Listed
Installation
Details
Accessibility
Plans &Details
irlr�'vif'�1►i+ "
Updated 5/23/23 Page 3 of 6
08/11/2023
ASPEN
BUILDING DEPARTMENT
Submittal New Addition Alteration/ Alteration Demo Repair
Requirements Construction Remodel (Interior only) (Complete)
Roof Plan •
Elevations/
Height V
Sections
DetailsOr
Fireplace Details
Schedules
Excavation/
Earth Retention
Plans
Civil Plans
*discuss directly /
with Engineering V
Electrical Plans
Kitchen Plans
Mechanical Plans
Plumbing
Isometrics/
Flatometric
Structural Plans
RECEIVED
Updated 5/23/23 Page 4 of 6
08/11/2023
ASPEN
BUILDING DEPARTMENT
ADDITIONAL NOTES and/or REQUIREMENTS
RECEIVED
Updated 5/23/23 Page 5 of 6
08/11/2023
ASPEN
BUILDING DEPARTMENT
PRE-SUBMISSION BUILDING CHECKLIST REVIEWED AND ACCEPTED:
CITY STAFF NAME:
DATE:
PERMIT APPLICANT DECLINES TO CONDUCT A PRE-BUILDING PERMIT SUBMISSION MEETING
WITH BUILDING STAFF AND UNDERSTANDS THAT FAILING TO DO SO MAY RESULT IN A
LENGTHIER BUILDING REVIEW PROCESS:
PERMIT APPLICANT NAME: Kyla Smits
DATE: 7/26/2023
RECEIVED
Updated 5/23/23 Page 6 of 6
08/11/2023
ASPEN
BUILDING DEPARTMENT