Loading...
HomeMy WebLinkAboutFile Documents.320 E Hyman Ave.0015-2024-BCOM (2) __ 1 1 2 Q 0 5 0 7 7.1 7.2 7.3 �8 8.2 0/% i\\ r) ID I 1 . .,...__., , , IC A MDP-1 s 0PpD0 UCF''h 60 24 O 1 :co 0^^ay''''sRo l'' x 11 I r P 1. i, 36x16 65x24 i m 46561 °, t - - �._. -. 60x24 - A _� 11 22x16 22x16 22x16 i ? •' AV-21 1, VAV-24 VAV 20 VAV-22 6Ox22(existing) ,� i 1 ���;V-23 OI -. MDP-3 ,1 1� _. - -._.. — ( l i, ■- -O - 1x1: MDP-2 , , www.cunniffe.com �,j2x,2 _._�/- _..r. R.EG 4. oo <8> �, Resource Engineering Group ' �` '� - ! reginc.com•970.349.1216 © Existing Silencer III ST-s 10o 01 0-1 r 012x12 l / In/ ! _ 13 -0 Q Li al O13 1 L_L I v.. .... Z _ o (existing) U li a T•12 CD w a Q 0. <> 1 = is I 1 7500 CFM max 60x24 ( m o Approximate location "Proscenium Wall" per 1981 structurals.. JJJJ a 10 �� 60x22(existing) JJJJ- _ `W _1 Notes this sheet: r� r ww © O See Details Sheet M3.1 for isometric views of the Attic AHU-4 duct routing. CC Z O LU Motorized dampers(MDP)in existing return plenum(3)and attic(1).See Schedule for more information. tj j co O New homerun ductwork for Projection Booth supply air(600 CFM:12x12)required from associated VAV-24 to Projection Booth.Duct may - CL Q need to split into equivalent static loss pair to avoid structure and spacial conflicts ,,-,---.,-- 0 O '41\1 40 New roof top air handler supply air to below to connect supply air plenum tight to ceiling.New VAV's to connect to supply plenum. I -" > CC I getairke Return air to MDP-2 will require free-area"slots"in the front of the stage panels used when the pit is not in use to provide an air pathway i w0 from the theater space.9 ft2 of free-area required to maintain below 500 FPM.Coordinate detailing with Engineer and Archtiect. OBelow balcony supply ducts underfloor to be scoped and rebalanced to provide 1400 CFM spread evenly across the length of the(4) cc) existing in floor difussers.Coordinate with Engineer to verify that adequate flow at acoustically acceptable air-speed will be proivded. - --------------,---lisio, ----------------------------------- 10 Remove existing VAV in attic near projection booth.Connect new supply duct from VAV-24 to existing 14"round supply duct to Projection -------------------- -------------------------------------- O - O Booth.Existing 18x14 retum duct from projection booth to attic space to remain. - - DRAWING: 11 All new supply and return ductwork and plenums to be lined with 1"acoustical liner.Dimensions shown are the required free area. Attic Mechanical Plan — ISSUE: DATE: 12 New DDC integrated temperature sensor in the attic space.See Control Sequence for integration with MDP-4 and low temp alarms. Approximate location attic truss 100%Design Development 05.13.15 . "T7" per 1981 structurals.. Permit Set 85.,,'S 0Remove all existing cast iron heating coils in the existing supply ducts and associated hot water piping. I./ Construction Do cuments 08.12.15 C0pl Pen Renex Commend 09.02.15 C 14 Remove HV-7 and all associated equipment that will not be re-used.Do not abandon equipment in place. Asln< 0925.15 (11) CD 7 0 0 7.3 1 i3 / 8'2 ` J JOB Na 24109 • SHEET NO. . O Attic Mechanical Plan i i� **CURRENT** M2.5 Scale: 1/4" = 1'-0" 7P.7 M2.5