Loading...
HomeMy WebLinkAboutFile Documents.320 E Hyman Ave.0015-2024-BCOM (5) MARTIN/MARTIN CONSULTING ENGINEERS March 22, 2024 Perry Kleepies City of Aspen 427 Rio Grande Place Aspen, CO 81611 Re: Wheeler Opera House Rigging— Primary Structure clarifications Martin/Martin, Inc. Project No.: 22.1511.S.01 The following information is intended to aid in the determining of fireproofing requirements for the upcoming work related to updates to the rigging systems within the Wheeler Opera House in Aspen, Colorado. For the proposed structural modifications within the Wheeler Opera House rigging grid,the following is our understanding of the framing systems: • The elements of the Primary Structural Frame being modified are the wood timber trusses along gridlines T5,T6, &T7. o The modification to these trusses involves installing a more robust connection from the steel plate reinforcing to the timber member of the bottom chord. • All additional framing being modified consists of beams designed to support rigging motors, rigging pulleys, and gridiron surfaces. o Based on our understanding of IBC 2021, Section 410.2.2,these elements would not be considered part of the Primary Structural Frame for the purpose of fire-resistance rating. Please contact us for any questions or concerns related to the above information. Sincerely, fragidie Dan Griesenauer, PE Project Engineer, Investigative Engineering ...44,04:10eitz Nicole Lane, PE, SE Principal, Investigative Engineering G:\PROJECrS\22.1511.5.01-Wheeler Opera House Rigging\Formal Issued Docs\2024-03-22 Primary Structure Letter\Primary Structure Clarifications.docx MARTIN/MARTIN,INC. RECEIVED Lakewood,CO Albuquerque,NM Atlanta,GA Avon,CO Bay Area,CA Cheyenne,WY Fort Collins,CO Kansas City,MO martinmartin.com 04/11/2024 ASPEN BUILDING DEPARTMENT