Loading...
HomeMy WebLinkAboutFile Documents.315 E Hyman Ave.0011-2023-BCOM (21) August 14, 2023 Bonnie Muhigirwa Chief Building Official Aspen Building Department of Community Development 427 Rio Grande Place Aspen, CO 81611 (P) 970.429.2787 (E) bonnie.muhigirwa@aspen.gov RE: Gravity Haus Aspen (0011-2023-BCOM - 315 E HYMAN AVE) —Accessibility Letter Dear Ms. Muhigirwa: As discussed with Nick Thompson, Plan Examiner, and Denis Murray, Plan Examination Manager, with the City of Aspen Building Department of Community Development on August 1, 2023 and confirmed in email on August 2, 2023, there are two conditions relating to Plan Review Comments that we were requested to address via a letter for your review and consideration. We had two plan review comments regarding the accessibility to bathrooms from the Restaurants (201-1) and (202-1) and to the Kitchen (200-0)from the same restaurant and bar. As discussed with Nick and Denis, these are considered technically infeasible and we proposed alternates as described below. - Accessible access to bathrooms from Restaurants 201-1 and 202-1. This level has four single occupant restrooms, one of which is accessible. It is technically infeasible to convert Restroom 225 to meet ADA Guidelines because it is between a stair and another ADA Restroom with no room for expansion. It is technically infeasible to convert Restrooms 222 and 224 to meet ADA Guidelines because of existing structural bearing walls and stairs needed for egress. There is one wall that is framing and as discussed that is shared with the kitchen which is not getting renovated in this scope of work. It was discussed that there are two existing Accessible Restrooms 321 and 322 on the upper level that are accessible to restaurant patrons through the elevator. - Access to Kitchen 200-0 from the Restaurants 201-1 and 202-1. There is currently no accessible access between Restaurants 201-1 and 202-1 and Kitchen 200.0. It is technically infeasible to provide accessible access on the interior of the building between these spaces due to the existing stairs tightness of space and the length of ramp that would be needed for this change in elevation without expanding the building envelope. It was discussed that the corridor wall adjacent to Retail 200-2 could be moved to allow an exterior door from adjacent to the elevator to the kitchen corridor could be added. Door 200e has been added here with front approach push side and front approach pullside clearances as depicted below. RECEIVED 08/25/2023 8/14/2023 3003 LARIMER ST (303)861-5704 Page 1 of 2 DENVER,CO 80205 OZARCHASp EN BUILDING DEPARTMENT 18min I ` I ass `r E y • (a) front approach null side (b) front approach, push side Sincerely, Rebecca Stone, AIA, LEED AP BD+C Principal OZ Architecture Copies to: Denis Murray, Nick Thompson, Sydney Fallon-City of Aspen Grady Huff, Alicia Deters-Gravity Haus Chris Vandall, Suzanne Stawiarski-OZ Architecture RED'E EVE D 08/25/2023 8/14/2023 ASPEN Page 2 of 2 BUILDING DEPARTMENT