Loading...
HomeMy WebLinkAboutFile Documents.315 E Hyman Ave.0011-2023-BCOM (24) Change Narrative TO: Nick Thompson DATE: 8/18/2023 FROM: Rebecca Stone PROJECT Gravity Haus Aspen NAME: SUBJECT: Change Narrative PROJECT#: 123034.00 CC: Gravity Haus:Grady Huff,Alicia FILE#: Deters;OZ Architecture:Chris Vandall,Suzanne Stawiarski ARCHITECTURAL A0.1 COVER PAGE • Sheet Index has been revised to more accurately reflect the sheet numbers and titles. • In the summary of work, the extent of kitchen renovations have been reduced. A0.2 SHEET INDEX • Sheet Index has been revised to more accurately reflect the sheet numbers and titles. A0.3 SPECIFICATIONS • None A0.4.1 CODE PLAN • Both egress plans have been revised. • Building code notes have been revised to correct calculations. • Plumbing fixture calculations have been added. A0.4.1A CODE PLAN • New sheet added to set so satisfy city comments for restaurant occupancy loads A0.4.2 CODE PLAN • A note has been added noting the new detention tank. A0.4.3 FIRE SEPARATION • None A0.4.4 ACCESSIBILITY PLAN • Accessible routes have been updated to include passage through new doors. A0.4.5 ACCESSIBILITY PLAN • A note has been added noting the new detention tank. A0.4.6 ACCESSIBILITY DETAILS • None A0.4.7 ACCESSIBILITY DETAILS • Controls and hand shower have been edited to comply with ICCA117.1-2009 section 608.4.3. • Detail 5 has been updated to include accurate dimensions for ADA compliant benches.RErEIvED 08/25/2023 8/22/2023 3003 LARIMER ST (303)861-5704 Page 1 of 10 DENVER,CO 80205 OZARCH.SPEN BUILDING DEPARTMENT A0.6.1-4 UL ASSEMBLIES • Assemblies have been labeled to correspond with assemblies on A0.7.1. &A0.7.2 A.07.1 WALL, FLOOR, & ROOF ASSEMBLIES • New shaftwall details, 17 and 16 have been added. • Fireproofing details 17 and 16 have been relocated to next page. A.07.2 FIREPROOFING • New sheet has been added to the set with fireproofing details. A0.8.1 DOOR SCHEDULE • Door schedule has been updated to include additional doors, door hardware, notes, and additional specifications. • Egress door notes have been added along with hardware. • Interior door threshold detail has been provided. • Tables C303.1.3(1) and C303.1.3(3) have been added. • Hardware sets removed A0.8.2 GLAZING SCHEDULES • Additional notes added for BD comments. A0.11.0 CREMP PLAN • Snowmelt coverage has been removed from planters and added to the ramp. Total snowmelt SF has been calculated and noted. A0.22 FLOOR AREAS • Sheet added for BD comments A0.23 Tier 1 & 2 PLANS • Sheet added for BD comments A1.1.0.1 SITE PLAN • None AE1.1.1 BASEMENT EXISTING PLAN • None AD1.1.1 BASEMENT DEMO PLAN • None A1.1.1 ENLARGED BASEMENT RENO PLANS • A note has been added noting the new detention tank AE1.1.2 LOWER LEVEL EXISTING PLAN • Existing Mechanical Shaft REC WED 08/25/2023 8/22/2023 ASPEN Page 2 of 10 BUILDING DEPARTMENT AD1.1.2 LOWER LEVEL DEMOLITION PLAN • One of the mechanical shaft walls needs to be demoed for new shaft dividing wall • Doors have been removed at the Back Bar, Kitchen and Plating. • Walls have been shifted to accommodate new gates. A1.1.2.1 LOWER LEVEL RENO PLAN • Locker room 205-3 has been revised around existing structure, to keep existing door(E)2-5 and remove Steam Room. • New doors 200e and new gates G201b, G200a, and G200b have been added. • Shaft wall add into shaft to separate exhausts from ducts • Mechanical chases for fireplaces have been removed. • Ski lockers 200-1 has been reconfigured around existing column (boot dryer zone became smaller, no large plan changes) A1.1.2.2 LOWER LEVEL RENO PLAN • All of locker room 205-3 has been revised A1.1.2.3 LOWER LEVEL RENO PLAN • Ski lockers 200-1 has been reconfigured around existing column (boot dryer zone became smaller, no large plan changes). • New doors 200e and new gates G201b, G200a, and G200b have been added. • Retail has been reconfigured to allow for new exterior door in corridor (ADA access from elevator to kitchen/restrooms) AE.1.1.3 UPPER LEVEL EXISTING PLAN • None AD.1.1.3 UPPER LEVEL DEMO PLAN • Door in corridor is changed to remain. A1.1.3.1 UPPER LEVEL RENO PLAN • Door in corridor is changed to remain. • Fireplace shaft removed. A1.1.3.2 UPPER LEVEL RENO PLAN • None AE.1.1.4 ROOF EXISTING PLAN • None A1.1.4.1 ROOF RENO PLAN • None A1.1.4.2 ROOF DRAINAGE PLAN • None A1.2.1 BASEMENT RCP • A note has been added noting the new detention tank. RECEIVED 08/25/2023 8/22/2023 ASPEN Page 3 of 10 BUILDING DEPARTMENT A1.2.2 LOWER LEVEL RCP • All locker room 205-3 has been revised. • Retail 200-2 has been revised. • Back Bar 201-2 has been revised. • Fixture types in the restaurant have been swapped to new light fixtures. A1.2.3 UPPER LEVEL RCP • Wall mounted light fixtures have been removed from workpods. • A single ceiling mounted light fixture location has shifted. A2.1 EXTERIOR ELEVATIONS • Exterior material finishes have been removed from schedule/scope. A2.2 EXTERIOR ELEVATIONS • None A2.3 EXTERIOR ELEVATIONS • Exterior material finishes have been removed from schedule/scope. • Exterior signage/panel has been removed from scope. A2.4 EXTERIOR ELEVATIONS • None A2.5 EXTERIOR ELEVATIONS • Exterior door has been updated to existing to remain. A2.6 EXTERIOR ELEVATIONS • Exterior door has been updated to existing to remain. A2.7 EXTERIOR ELEVATIONS • None A2.8 EXTERIOR ELEVATIONS • Exterior door has been updated to existing to remain. A2.9 BUILDING SECTIONS • New head height dimensions added. • Exterior door has been updated to existing to remain. • Lid removed. • New shaft wall added. • Proper scale now indicated. A2.10 BUILDING SECTIONS • Proper scale now indicated. • Annotation added about insulation under ramp. A2.11 BUILDING SECTIONS • Proper scale now indicated. • Annotation added about insulation under ramp. RECEIVED 08/25/2023 8/22/2023 Page 4 of to ASPEN N BUILDING DEPARTMENT A4.1 DETAILS • Annotation added about insulation under ramp. A4.2 DETAILS • Several details have been removed and edited. A4.3 DETAILS • Several details have been removed and edited. A4.4 DETAILS • Several details have been removed. • New shower glass panel detail has been added. INTERIOR DESIGN ID0.1 COVER • Summary of work has been updated. ID0.10.1 FINISH SCHEDULE • Many materials have been removed from scope and or substituted. ID0.10.2 FINISH SCHEDULE • Many materials, plumbing fixtures or accessories, and appliances have been removed from scope and or substituted. ID1.1.1 BASEMENT RENO PLAN • None ID1.1.2 LOWER LEVEL RENO PLAN • All locker room 205-3 has been revised. • New doors and new gates have been added. • Ski lockers 200-1 has been reconfigured around existing column. ID1.1.3 UPPER LEVEL RENO PLAN • None ID1.2.1 BASEMENT RCP • None ID1.2.2 LOWER LEVEL RCP • All locker room 205-3 has been revised. • Retail 200-2 and adjacent hall has been revised. • Back Bar 201-2 has been revised. • Acoustic tiles and ceiling trim has been added to restaurant spaces. ID1.2.3 UPPER LEVEL RCP • Wall mounted light fixtures have been removed from workpods. • A single ceiling mounted light fixture location has shifted. RECEIVED 08/25/2023 8/22/2023 ASPEN Page 5 of 10 BUILDING DEPARTMENT ID1.3.1 BASEMENT FINISH PLAN • None ID1.3.2 LOWER LEVEL FINISH PLAN • All locker room 205-3 has been revised. • Ski lockers 200-1 has been reconfigured around existing column. • Finishes have been changed in all of Restaurant 201-1, Restaurant 202-1, Back Bar 201-2, Hall 220, Unisex RR 222, Unisex RR 224, Unisex RR 225, and Unisex RR 226. ID1.3.3 UPPER LEVEL FINISH PLAN • Finished in Hall 320 have been revised. ID1.4.2 LOWER LEVEL FURNITURE PLAN • None ID1.4.3 UPPER LEVEL FURNITURE PLAN • None ID3.1 INTERIOR ELEVATIONS • All elevations 1-6 have been revised to reflect new design and now include new finishes. ID3.2 INTERIOR ELEVATIONS • All elevations 1-8 have been revised to reflect new design and now include new finishes. ID3.3 INTERIOR ELEVATIONS • All elevations 1-5 have been revised to reflect new design and now include new finishes. ID3.4 INTERIOR ELEVATIONS • All elevations 1-16 have been revised to reflect new design and now include new finishes. ID3.5 INTERIOR ELEVATIONS • All elevations 1-10 have been revised to reflect new design and now include new finishes. ID3.6 INTERIOR ELEVATIONS • All elevations 1-14 have been revised to reflect new design and now include new finishes. ID3.7 INTERIOR ELEVATIONS • Elevations 1-6, 8, and 10 have been revised to reflect new design and now include new finishes. ID3.8 INTERIOR ELEVATIONS • All wall finishes in elevations 1-5 have been revised to reflect new design. • Millwork has been simplified. ID3.9 INTERIOR ELEVATIONS • All wall finishes in elevations 1-6 have been revised to reflect new design. ID4.1 INTERIOR DETAILS • None RECEIVED 08/25/2023 8/22/2023 Page 6 of 10 ASPEN `SP N BUILDING DEPARTMENT STRUCTURAL S0 STRUCTURAL GENERAL NOTES • Revised Special Inspections—2015, Item 1 B. S1 FOUNDATION PLAN • None S2 MAIN LEVEL FRAMING PLAN • Existing CMU pilaster in Room 205-7 to remain. S3 UPPER LEVEL FRAMING PLAN • Existing CMU pilaster in Room 205-7 to remain. • Added header and lintel for new exterior door adjacent to Elevator 290. S4 ROOF FRAMING PLAN • None S5 SECTIONS • None S6 SECTIONS • None S7 DETENTION TANK • None MECHANICAL AND PLUMBING M0.02 • Clarified the requirement for radiation dampers on exhaust fans. Re Fan Schedule. • Clarified the requirement for smoke detectors on Rooftop Units. Re RTU Schedule. M0.03 • Revised Outside Air Schedule— natural ventilation being provided for Retail space and Ski Locker Rm. • Deleted Fan Coils from project. M0.04 • Deleted fan coil detail. M0.05 • Signed Comcheck. RECEIVED 08/25/2023 8/22/20n Page 7&10 ASPEN BUILDING DEPARTMENT M1.01 • Deleted fan coil and relocated make up air unit from existing Coffee shop. M1.02 • Clarified fire dampers at rated ceiling assemblies. • Deleted fireplace flues. • Revised locker room layout due to Architectural revision. • Deleted fan coil in Retail space and provided electric baseboard. Outside air to be provided via natural ventilation. • Existing kitchen ductwork shown— note due to hard lid ceilings some routing could not be verified. • Provided fire damper on exhaust duct penetrating locker room wall. M1.03 • Clarified fire dampers at rated ceiling assemblies. • Deleted fireplace flues. • Existing kitchen ductwork shown. • Rerouted exhausts at existing abandoned elevator shaft and deleted ventilation air duct. M1.04 • Relocated RTU-8 so the intake is more than 10 ft from the property line. • Deleted fireplace flues. • Relocated toilet exhausts to terminate more than 10 ft from the property line. Note: the dryer exhaust was already beyond the 10 ft requirement. • Showed existing kitchen rooftop equipment. ME1.02 • Provided existing kitchen duct information. • Clarified existing restroom exhaust duct to be removed. ME1.03 • Provided existing kitchen duct information. • Clarified existing MUA is to be relocated vs just removed. ME1.04 • Showed existing kitchen rooftop equipment. P0.01 • Added washer wall box specification. P0.02 • Added a washer wall box piping detail. RECEIVED 08/25/2023 8/22/2023 ASPEN Page 8 of 10 BUILDING DEPARTMENT P1.01 • Deleted gas piping to the fireplaces. • Deleted condensate piping from the fan coil. • Provided cw, hw and waste connections for the level 3 washer wall box. P1.02 • Deleted gas piping to the fireplaces. • Provided cw, hw and waste connections for the level 3 washer wall box. • Revised locker room layout per Architectural revision. P1.03 • Added washer wall box. P1.04 • Revised gas piping for relocated RTU-8. P2.01 • Revised waste and vent isometric for locker room revision. • Added waste and vent isometric for added washer wall box. PE1.04 • Added existing kitchen equipment to the roof plan. ELECTRICAL E0.00 • Load Summary Updated. E0.01 • Panel Schedules C and E Modified. • Equipment Schedule Modified: Electric Baseboard added and Fan Coil Removed. E0.02 • Light Fixture Specifications and COMCheck updated. E1.01 • Retail Area Modified Circuits changed to Panel E. • EEB electric baseboard units added and electric heat FCU removed. • Layout of locker room area, retail and plating modified. • Panel C relocated to comply with NEC clearance requirements. • Air Curtains added. E2.01 • Layout of locker room area, retail and plating modified. • Exit Signage added. • Lighting modified at Back Bar. RECEIVED 08/25/2023 8/22/2023 Page 9 of 10 ASPEN `SP N BUILDING DEPARTMENT E2.02 • Type 'W3' Wall Mounted Light Fixtures removed from project. FOOD SERVICE FS1 • None FS2 • None FS3 • None FS4 • None FS5 • Upper kitchen added to show extent of equipment replacement RED'E EVE D 08/25/2023 8/22/2023 ASPEN Page 10of 10 ASPEN BUILDING DEPARTMENT