ARCHITECTURAL
A0.1 COVER PAGE
• Sheet Index has been revised to more accurately reflect the sheet numbers and titles.
• In the summary of work, the extent of kitchen renovations have been reduced.
A0.2 SHEET INDEX
• Sheet Index has been revised to more accurately reflect the sheet numbers and titles.
A0.3 SPECIFICATIONS
• None
A0.4.1 CODE PLAN
• Both egress plans have been revised.
• Building code notes have been revised to correct calculations.
• Plumbing fixture calculations have been added.
A0.4.1A CODE PLAN
• New sheet added to set so satisfy city comments for restaurant occupancy loads
A0.4.2 CODE PLAN
• A note has been added noting the new detention tank.
A0.4.3 FIRE SEPARATION
• None
A0.4.4 ACCESSIBILITY PLAN
• Accessible routes have been updated to include passage through new doors.
A0.4.5 ACCESSIBILITY PLAN
• A note has been added noting the new detention tank.
A0.4.6 ACCESSIBILITY DETAILS
• None
A0.4.7 ACCESSIBILITY DETAILS
• Controls and hand shower have been edited to comply with ICCA117.1-2009 section 608.4.3.
• Detail 5 has been updated to include accurate dimensions for ADA compliant benches.RErEIvED
08/25/2023
8/22/2023 3003 LARIMER ST (303)861-5704
Page 1 of 10 DENVER,CO 80205 OZARCH.SPEN
BUILDING DEPARTMENT
A0.6.1-4 UL ASSEMBLIES
• Assemblies have been labeled to correspond with assemblies on A0.7.1. &A0.7.2
A.07.1 WALL, FLOOR, & ROOF ASSEMBLIES
• New shaftwall details, 17 and 16 have been added.
• Fireproofing details 17 and 16 have been relocated to next page.
A.07.2 FIREPROOFING
• New sheet has been added to the set with fireproofing details.
A0.8.1 DOOR SCHEDULE
• Door schedule has been updated to include additional doors, door hardware, notes, and additional
specifications.
• Egress door notes have been added along with hardware.
• Interior door threshold detail has been provided.
• Tables C303.1.3(1) and C303.1.3(3) have been added.
• Hardware sets removed
A0.8.2 GLAZING SCHEDULES
• Additional notes added for BD comments.
A0.11.0 CREMP PLAN
• Snowmelt coverage has been removed from planters and added to the ramp. Total snowmelt SF has
been calculated and noted.
A0.22 FLOOR AREAS
• Sheet added for BD comments
A0.23 Tier 1 & 2 PLANS
• Sheet added for BD comments
A1.1.0.1 SITE PLAN
• None
AE1.1.1 BASEMENT EXISTING PLAN
• None
AD1.1.1 BASEMENT DEMO PLAN
• None
A1.1.1 ENLARGED BASEMENT RENO PLANS
• A note has been added noting the new detention tank
AE1.1.2 LOWER LEVEL EXISTING PLAN
• Existing Mechanical Shaft
REC WED
08/25/2023
8/22/2023 ASPEN
Page 2 of 10
BUILDING DEPARTMENT
AD1.1.2 LOWER LEVEL DEMOLITION PLAN
• One of the mechanical shaft walls needs to be demoed for new shaft dividing wall
• Doors have been removed at the Back Bar, Kitchen and Plating.
• Walls have been shifted to accommodate new gates.
A1.1.2.1 LOWER LEVEL RENO PLAN
• Locker room 205-3 has been revised around existing structure, to keep existing door(E)2-5 and
remove Steam Room.
• New doors 200e and new gates G201b, G200a, and G200b have been added.
• Shaft wall add into shaft to separate exhausts from ducts
• Mechanical chases for fireplaces have been removed.
• Ski lockers 200-1 has been reconfigured around existing column (boot dryer zone became smaller,
no large plan changes)
A1.1.2.2 LOWER LEVEL RENO PLAN
• All of locker room 205-3 has been revised
A1.1.2.3 LOWER LEVEL RENO PLAN
• Ski lockers 200-1 has been reconfigured around existing column (boot dryer zone became smaller,
no large plan changes).
• New doors 200e and new gates G201b, G200a, and G200b have been added.
• Retail has been reconfigured to allow for new exterior door in corridor (ADA access from elevator to
kitchen/restrooms)
AE.1.1.3 UPPER LEVEL EXISTING PLAN
• None
AD.1.1.3 UPPER LEVEL DEMO PLAN
• Door in corridor is changed to remain.
A1.1.3.1 UPPER LEVEL RENO PLAN
• Door in corridor is changed to remain.
• Fireplace shaft removed.
A1.1.3.2 UPPER LEVEL RENO PLAN
• None
AE.1.1.4 ROOF EXISTING PLAN
• None
A1.1.4.1 ROOF RENO PLAN
• None
A1.1.4.2 ROOF DRAINAGE PLAN
• None
A1.2.1 BASEMENT RCP
• A note has been added noting the new detention tank.
RECEIVED
08/25/2023
8/22/2023 ASPEN
Page 3 of 10
BUILDING DEPARTMENT
A1.2.2 LOWER LEVEL RCP
• All locker room 205-3 has been revised.
• Retail 200-2 has been revised.
• Back Bar 201-2 has been revised.
• Fixture types in the restaurant have been swapped to new light fixtures.
A1.2.3 UPPER LEVEL RCP
• Wall mounted light fixtures have been removed from workpods.
• A single ceiling mounted light fixture location has shifted.
A2.1 EXTERIOR ELEVATIONS
• Exterior material finishes have been removed from schedule/scope.
A2.2 EXTERIOR ELEVATIONS
• None
A2.3 EXTERIOR ELEVATIONS
• Exterior material finishes have been removed from schedule/scope.
• Exterior signage/panel has been removed from scope.
A2.4 EXTERIOR ELEVATIONS
• None
A2.5 EXTERIOR ELEVATIONS
• Exterior door has been updated to existing to remain.
A2.6 EXTERIOR ELEVATIONS
• Exterior door has been updated to existing to remain.
A2.7 EXTERIOR ELEVATIONS
• None
A2.8 EXTERIOR ELEVATIONS
• Exterior door has been updated to existing to remain.
A2.9 BUILDING SECTIONS
• New head height dimensions added.
• Exterior door has been updated to existing to remain.
• Lid removed.
• New shaft wall added.
• Proper scale now indicated.
A2.10 BUILDING SECTIONS
• Proper scale now indicated.
• Annotation added about insulation under ramp.
A2.11 BUILDING SECTIONS
• Proper scale now indicated.
• Annotation added about insulation under ramp. RECEIVED
08/25/2023
8/22/2023
Page 4 of to ASPEN
N
BUILDING DEPARTMENT
A4.1 DETAILS
• Annotation added about insulation under ramp.
A4.2 DETAILS
• Several details have been removed and edited.
A4.3 DETAILS
• Several details have been removed and edited.
A4.4 DETAILS
• Several details have been removed.
• New shower glass panel detail has been added.
INTERIOR DESIGN
ID0.1 COVER
• Summary of work has been updated.
ID0.10.1 FINISH SCHEDULE
• Many materials have been removed from scope and or substituted.
ID0.10.2 FINISH SCHEDULE
• Many materials, plumbing fixtures or accessories, and appliances have been removed from scope
and or substituted.
ID1.1.1 BASEMENT RENO PLAN
• None
ID1.1.2 LOWER LEVEL RENO PLAN
• All locker room 205-3 has been revised.
• New doors and new gates have been added.
• Ski lockers 200-1 has been reconfigured around existing column.
ID1.1.3 UPPER LEVEL RENO PLAN
• None
ID1.2.1 BASEMENT RCP
• None
ID1.2.2 LOWER LEVEL RCP
• All locker room 205-3 has been revised.
• Retail 200-2 and adjacent hall has been revised.
• Back Bar 201-2 has been revised.
• Acoustic tiles and ceiling trim has been added to restaurant spaces.
ID1.2.3 UPPER LEVEL RCP
• Wall mounted light fixtures have been removed from workpods.
• A single ceiling mounted light fixture location has shifted. RECEIVED
08/25/2023
8/22/2023 ASPEN
Page 5 of 10
BUILDING DEPARTMENT
ID1.3.1 BASEMENT FINISH PLAN
• None
ID1.3.2 LOWER LEVEL FINISH PLAN
• All locker room 205-3 has been revised.
• Ski lockers 200-1 has been reconfigured around existing column.
• Finishes have been changed in all of Restaurant 201-1, Restaurant 202-1, Back Bar 201-2, Hall 220,
Unisex RR 222, Unisex RR 224, Unisex RR 225, and Unisex RR 226.
ID1.3.3 UPPER LEVEL FINISH PLAN
• Finished in Hall 320 have been revised.
ID1.4.2 LOWER LEVEL FURNITURE PLAN
• None
ID1.4.3 UPPER LEVEL FURNITURE PLAN
• None
ID3.1 INTERIOR ELEVATIONS
• All elevations 1-6 have been revised to reflect new design and now include new finishes.
ID3.2 INTERIOR ELEVATIONS
• All elevations 1-8 have been revised to reflect new design and now include new finishes.
ID3.3 INTERIOR ELEVATIONS
• All elevations 1-5 have been revised to reflect new design and now include new finishes.
ID3.4 INTERIOR ELEVATIONS
• All elevations 1-16 have been revised to reflect new design and now include new finishes.
ID3.5 INTERIOR ELEVATIONS
• All elevations 1-10 have been revised to reflect new design and now include new finishes.
ID3.6 INTERIOR ELEVATIONS
• All elevations 1-14 have been revised to reflect new design and now include new finishes.
ID3.7 INTERIOR ELEVATIONS
• Elevations 1-6, 8, and 10 have been revised to reflect new design and now include new finishes.
ID3.8 INTERIOR ELEVATIONS
• All wall finishes in elevations 1-5 have been revised to reflect new design.
• Millwork has been simplified.
ID3.9 INTERIOR ELEVATIONS
• All wall finishes in elevations 1-6 have been revised to reflect new design.
ID4.1 INTERIOR DETAILS
• None
RECEIVED
08/25/2023
8/22/2023 Page 6 of 10 ASPEN
`SP N
BUILDING DEPARTMENT
STRUCTURAL
S0 STRUCTURAL GENERAL NOTES
• Revised Special Inspections—2015, Item 1 B.
S1 FOUNDATION PLAN
• None
S2 MAIN LEVEL FRAMING PLAN
• Existing CMU pilaster in Room 205-7 to remain.
S3 UPPER LEVEL FRAMING PLAN
• Existing CMU pilaster in Room 205-7 to remain.
• Added header and lintel for new exterior door adjacent to Elevator 290.
S4 ROOF FRAMING PLAN
• None
S5 SECTIONS
• None
S6 SECTIONS
• None
S7 DETENTION TANK
• None
MECHANICAL AND PLUMBING
M0.02
• Clarified the requirement for radiation dampers on exhaust fans. Re Fan Schedule.
• Clarified the requirement for smoke detectors on Rooftop Units. Re RTU Schedule.
M0.03
• Revised Outside Air Schedule— natural ventilation being provided for Retail space and Ski Locker
Rm.
• Deleted Fan Coils from project.
M0.04
• Deleted fan coil detail.
M0.05
• Signed Comcheck.
RECEIVED
08/25/2023
8/22/20n Page 7&10 ASPEN
BUILDING DEPARTMENT
M1.01
• Deleted fan coil and relocated make up air unit from existing Coffee shop.
M1.02
• Clarified fire dampers at rated ceiling assemblies.
• Deleted fireplace flues.
• Revised locker room layout due to Architectural revision.
• Deleted fan coil in Retail space and provided electric baseboard. Outside air to be provided via
natural ventilation.
• Existing kitchen ductwork shown— note due to hard lid ceilings some routing could not be verified.
• Provided fire damper on exhaust duct penetrating locker room wall.
M1.03
• Clarified fire dampers at rated ceiling assemblies.
• Deleted fireplace flues.
• Existing kitchen ductwork shown.
• Rerouted exhausts at existing abandoned elevator shaft and deleted ventilation air duct.
M1.04
• Relocated RTU-8 so the intake is more than 10 ft from the property line.
• Deleted fireplace flues.
• Relocated toilet exhausts to terminate more than 10 ft from the property line. Note: the dryer exhaust
was already beyond the 10 ft requirement.
• Showed existing kitchen rooftop equipment.
ME1.02
• Provided existing kitchen duct information.
• Clarified existing restroom exhaust duct to be removed.
ME1.03
• Provided existing kitchen duct information.
• Clarified existing MUA is to be relocated vs just removed.
ME1.04
• Showed existing kitchen rooftop equipment.
P0.01
• Added washer wall box specification.
P0.02
• Added a washer wall box piping detail.
RECEIVED
08/25/2023
8/22/2023 ASPEN
Page 8 of 10
BUILDING DEPARTMENT
P1.01
• Deleted gas piping to the fireplaces.
• Deleted condensate piping from the fan coil.
• Provided cw, hw and waste connections for the level 3 washer wall box.
P1.02
• Deleted gas piping to the fireplaces.
• Provided cw, hw and waste connections for the level 3 washer wall box.
• Revised locker room layout per Architectural revision.
P1.03
• Added washer wall box.
P1.04
• Revised gas piping for relocated RTU-8.
P2.01
• Revised waste and vent isometric for locker room revision.
• Added waste and vent isometric for added washer wall box.
PE1.04
• Added existing kitchen equipment to the roof plan.
ELECTRICAL
E0.00
• Load Summary Updated.
E0.01
• Panel Schedules C and E Modified.
• Equipment Schedule Modified: Electric Baseboard added and Fan Coil Removed.
E0.02
• Light Fixture Specifications and COMCheck updated.
E1.01
• Retail Area Modified Circuits changed to Panel E.
• EEB electric baseboard units added and electric heat FCU removed.
• Layout of locker room area, retail and plating modified.
• Panel C relocated to comply with NEC clearance requirements.
• Air Curtains added.
E2.01
• Layout of locker room area, retail and plating modified.
• Exit Signage added.
• Lighting modified at Back Bar. RECEIVED
08/25/2023
8/22/2023 Page 9 of 10 ASPEN
`SP N
BUILDING DEPARTMENT
E2.02
• Type 'W3' Wall Mounted Light Fixtures removed from project.
FOOD SERVICE
FS1
• None
FS2
• None
FS3
• None
FS4
• None
FS5
• Upper kitchen added to show extent of equipment replacement