Loading...
HomeMy WebLinkAboutFile Documents.315 E Hyman Ave.0011-2023-BCOM (26) RECEIVE 09/21/2023 ASPEN TO: Nick Thompson DATE: 9/20/2023 BUILDING DEPARTMENT FROM: Rebecca Stone PROJECT Gravity Haus Aspen NAME: SUBJECT: Building Department Comment PROJECT#: 123034.00 Responses CC: Gravity Haus:Grady Huff,Alicia FILE#: Deters;OZ Architecture:Chris Vandall,Suzanne Stawiarski BUILDING CODE COMMENTS ARCHITECTURAL #1 - Ordinance C402.2 There is no Ordin e C402.2 OZ Resp e: Specification note has been removed. #2—Patio Seating Revise patio dining seating area to show the width of aisles and aisle accessways with dimensions. Dimension 19"for chairs to stay out of the aisle and aisle accessway. Also ensure that accessible seating does not encroach into the aisle or e accessways-this means that you should take the 30"x48" clear space, subtract the amo of knee and toe space that fits under your table and as allowed by ICC/A117.1-2009, and whatev left cannot be in the aisle or aisle accessway. Aisle width min: 42" for greater than 50 seats. Aisle cessway width min: 12" + 1/2" of width for each additional 1 foot beyond 12' of length. (201 C 1029.9.1 and 1029.12.1.1). Also revise to show accessible seating. OZ Response: Th io seating has been removed. Ownership will not service area with food. Drawing A0.4.1A has b updated. #3—Patio seating clearances Tables and chairs may not overlap d maneuvering clearance. OZ Response: The patio seatin as been removed. Ownership will not service area with food. Drawing A0.4.1A has been updated. #4— Restaurant (2) seating plan Provide seating plan for restaurant 2 an estaurant 2 outdoor seating (again, where is this outdoor seating?) OZ Response: Sheet A0.4.1A has en updated to show seating plan. Outdoor seating is located outside the operable glass wal abels have been changed to match. #5 — Glazing The overall U-factors listed are what matter(entire assembly, including frame), this shows over-all factors of less than 0.77 which will work for glazed entrance doors. However, simply stating that these numbers were determined in accordance with NFRC-100 is insufficient. Provide a simulation or test by 9/20/2023 Page 1 of 2 las an NRFC accredited lab in accordance w. FRC-100. You will also need to select a specific model Please reread the City fenestration poli . 3. Provide a simulation or test by an NFRC—accredited lab in accordance with NFRC-100 prior to rmit approval. To document the chain of custody, an affidavit or other evidence from the manufact r confirming compliance with the simulation or test is required prior to field. OZ Response: Computer S. ulation Report has been provided by Kawneer for the 350T storefront door specified. Values meet th aspen code requirements. #6—Thermal Barrier Comment not addressed COA original co r -nt: Spray foam insulation requires a thermal barrier if exposed per 2015 IBC 2603.4 OZ re •. se: A detail was added to show 1/2" gyp. thermal barrier. New detail 17/A4.1. COA response: No ► ail 17 on sheet A4.1. OZ response: Detail was ad. i. It is located on sheet 17/A4.1 Details (Ramp at wall). It is located above detail 1 (New stair Sectio on the right-hand side of the page. 9/20/2023 Page 2 of 2