Loading...
HomeMy WebLinkAboutFile Documents.80 Overlook Dr.0020-2023-BRES (5) Bryan May Architecture+Interiors 501 Rio Grande Place, Suite 109 Aspen, CO 81611 Re: 80 Overlook—Entran II Scope The Entran system will be drained and abandoned.Tubing will remain in place, and a new system will be determined at the start of construction once the general contractor and a licensed mechanical engineer are able to explore existing conditions and make a recommendation for replacement. The system may be replaced with a new boiler and an additional layer of Warmboard-R sheathing or similar over the existing subfloor. Warmboard-R specifications are attached to this letter. lcilk \00)01, warmboard.com // 800.556.0595 SPECIFICATION WARMBOARD - R SPECIFICATION Product Description Warm board-R is a hydronic radiant panel manufactured from oriented strand board (OSB)with a conductive aluminum top skin bonded to the entire top surface. ttl6l;t Each panel includes a series of conductive aluminum channels %/ip fill on the top surface composed of straight and turn patterns to ' accommodate the installation of pex tubing. All panels can be installed over existing concrete or subfloor. / I Specifications Project Details Dimensions 13/16"thick,2"x 4' Job/Customer Weight 3.2 lb/sf.(includes panel,tubing,water) Engineer Panel Types Straight,Turn Tubing size 1/2" Contractor Surface Material .025"thick 1060 aluminum alloy Submitted By Submittal Date Order Number Order Date Spec.Reference Panel Quantities Turn Straight -,� _ iiii RS SF _ 7 - R! ,, 'Ilk r t, ,,, . , ,,, , ____ _ ___ ,, .F -...� \ _`,, P • 1122 WARMBOARD - R PANEL Installation Guide lii* warmboard TABLE OF CONTENTS 1.800.556.0595 2 for assistance Preparation and Installation Flooring Applications Resources ► Panel Description Page 3 ► Hardwood Overview Page 15 ► Flooring R-values Page 35 ► Installation Highlights Page 4 ► Hardwood Acclimation Page 16 ► Hardwood Manufacturers Page 36 ► Approved Tubing List Page 5 ► Installing Solid Plank Page 17 ► Water Temperature Chart Page 37 ► Necessary Tools Page 6 ► Installing Engineered, Laminate, Page 19 and Bamboo ► Selecting a Router Page 7 ► Installing Tile Page 21 ► Installing over Subfloor Page 8 ► Installing Carpet Page 31 ► Installing over Slab Page 9 ► Installing Cork Page 32 ► Custom Routing Page 11 ► Installing Vinyl Page 33 ► Tubing Installation Page 12 ► Installing Linoleum Page 34 ► Manifold Cabinet Page 14 AReview this guide and our supplied plan set l ' (and floor plan dimensions)before work begins. WARMBOARD-R PANEL DESCRIPTION Warmboard-R is a hydronic radiant panel made from oriented strand board (OSB)with a conductive .025" Dr TURN PANEL thick 1070 aluminum alloy skin bonded to the entire top surface. Each panel type is stamped with a series of aluminum channels on the top surface to hold 1/2" PEX or PEX-AL-PEX tubing. Warmboard-R consists of two panel types which weigh approximately 25 pounds, are 13/16"thick and measure 23 7/8"x 48". In a completed assembly, Warmboard-R weighs 3.21bs per square foot, I which includes the panel, tubing and water. I g„ Tangential Groove Warmboard-R is typically installed over concrete or STRAIGHT PANEL subfloor,though is also used in walls and ceilings. RS Non-aluminum filler panels are also available. Warmboard-R panels are but one component in a complete radiant system.System design should be done in accordance with Radiant Professionals Alliance(RPA)guidelines,manufacturers' recommendations for ancillary components, and is the responsibility of the system designer. INSTALLATION HIGHLIGHTS 1.8f assistance 00or .556.0595 4 1 Count your panels when they arrive on site 7 Custom routes require a router with a minimum and confirm the shipment is correct. If there are 1.75 horsepower(2.25hp is recommended). any questions or inconsistencies with your plan DO NOT attempt a custom route without the set, call us immediately. proper template guide (pg. 7). 2 The existing subfloor should be reasonably 8 When Warmboard is installed over a crawl space smooth and flat prior to the installation of or existing subfloor, a minimum of R-19 insulation Warmboard-R. Inspect for squeaks and refasten is required beneath the panels to prevent to joists if necessary. downward heat loss. 3 Warmboard-R and the subfloor MUST be dry 9 Review the installation manual before installing prior to installation. Warmboard-R CANNOT finish floors. be exposed to rain before or after installation. 10 The surface temperature of finished floors is not 4 Gap 1/8" between panels on the 4' side and always to exceed 852F.This rule applies to the entire use the alignment pins when fastening to ensure radiant industry, and is endorsed by the Radiant the tubing paths between panels line up. Professionals Alliance (RPA) and International Association of Plumbing and Mechanical Officials 5 ONLY use tubing approved by Warmboard, Inc. (IAPMO). (pg. 5). DO NOT use silicone or other types of adhesives in the tubing channel. 6 Tubing layouts for Warmboard-R can be quite flexible. Make field revisions as needed but DO NOT exceed 275 linear feet per loop. EBy reading these highlights before proceeding, you will save you time,money and hassle. Warmboard products are required to be installed and managed by experienced and licensed trade professionals pursuant to current local laws. Failure to use proper installers will void any product warranty. A\ CAUTION:Warmboard-R panels CANNOT be exposed to water or excess moisture.Exposure will void any product warranty. WARMBOARD-R APPROVED TUBING LIST 5 PEX Aluminum PEX tubing, 1/2" ID Warmboard Comfort System ► Warmboard PEX:PEX-AL-PEX Although Warmboard approves these tubing products for panel projects, they are NOT supported ► Bluefin: PEX-AL-PEX for use with the Warmboard Comfort System. ► Mr. Pex: PEX-AL-PEX ONLY use the supplied Warmboard PEX-AL-PEX, which has been specified and tested by Warmboard ► Watts: PEX-AL-PEX for use with the WCS. If equipment failure does occur on a WCS project without the specified tubing, Warmboard has the PEX tubing, 1/2" ID option to deny any warranty claim related to the system hydronics. ► HeatLink FL PEX-a ► Mr. Pex ► Rehau Raupex Oxygen Barrier ► Uponor helioPEX X2 ► Uponor/Wirsbo hePEX ► ViegaPEX Barrier /\ ONLY use tubing listed here.Other products may ll 1 create ticking noises during operation as the EVOH barrier rubs against the channel. Warmboard tubing and manifolds are included with the Warmboard Comfort System and do not need to be purchased separately. If only using Warmboard panels,tubing and manifolds can also be purchased from us separately at very competitive prices. NECESSARY TOOLS 1.800.556.0595 for assistance 6 Installation Kit Content Other Tools and Materials (supplied with each order) Install Kit ► Circular saw,carbide blade ► Warmboard panel/tubing plans ► Router,minimum 1.75 horsepower, 2.25hp recommended(pg.7) ► 3 Custom routing templates(wood) .— ► ► Electrician nailing plates 5/8"Router bit 4>- — ► ► 1111 16oz Rubber mallet • 2 Alignment pins ► ► Warmboard approved tubing Router template guide ► Router guide lock nut ► Shop vacuum ► Drill motor with a 3/4"drill bit ► PEX tubing cutter ► Wax pencil or permanent marker ► Tubing un-coiler ► 4"Grinder or Dremel tool WARMBOARD-R SELECTING A ROUTER 7 Provided Equipment The items shown below are shipped with your installation kit and should be used when routing. DO NOT attempt a route without them. This is the correct sub-base with the supplied metal This sub-base does NOT work with our template guide template guides installed. and will not create custom routes. INSTALLING OVER S U BFLOOR 1.80o0.a56.059e 8 Preparation Method 1: Screw Only It is essential that the existing subfloor is both flat and Use a #8 x 11/2" GRK R4 Multi-Purpose screw smooth before the installation of Warmboard. Inspect (or equivalent)with a top 1/2"smooth shank. the subfloor for evenness along the joists and flatness Fasten with a pattern of 3 rows of 4. between the joists. ► No pre-drilling required If necessary, sand the subfloor and install extra blocking below. Inspect for squeaks and refasten ► Self-counter sinking with decking screws as necessary. ► No adhesive needed Cutting and installing Warmboard-R is very straightforward.The panels can be trimmed with a standard skill or table saw and will rip just like Method 2: Nail and Glue ordinary OSB. We recommend cutting with the aluminum side down to help avoid burrs. Use a construction adhesive designed for bonding OSB to plywood (Loctite PL Wood Adhesive or equivalent). Follow all directions specified by the adhesive manufacturer. For nailing, use a ring shank or a screw nail. To determine the appropriate length of the nail to use, evaluate existing thickness of subfloor and add Warmboard-R 13/16". Fasten nails with a pattern of 3 rows of 4. Fastener Subfloor Warmboard-R and the subfloor MUST be ( ' completely dry,with a moisture reading between 8-12%before,during and after installation. DO NOT expose Warmboard-R to rain before or after installation. It is crucial to use the alignment pins to line up the channels from panel to panel. Cut panels with the aluminum side down. WARMBOARD-R INSTALLING OVER SLAB 9 Benefits Testing for Moisture Method 1: Fasten Directly Installing Warmboard-R over a concrete slab can Apply either a liquid vapor barrier or a 6- or 10-mil There are several methods by which to test the retrofit a basement, home remodel or new home moisture content of a newly poured slab, the simplest polyethylene vapor retarder overlapping two feet with a state of the art radiant floor heating system. (2') at the seams. Continue with Warmboard-R being the"Plastic Sheet Method" (ASTM D 4263-83). A broad range of finish floor options are available, To do this, place an 18"x 18" clear plastic sheet on panel installation using split drive anchors,Tapcon including hardwood, tile, carpet,vinyl and linoleum. the slab and tape down on all sides. DO NOT allow concrete fasteners or powder-actuated fasteners. the sheet to come in contact with direct sunlight or We recommend a maximum of 9 fasteners for each excessive heat. After 16 hours, if any condensation is panel. Concrete Slab Requirements found on the underside of the plastic, or if the slab The existing slab MUST be level and flat. A newly surface is darkened, the concrete is too wet for a Method 2: Using Insulation poured slab needs to be well-cured for a minimum of coating application. 30 days, and a moisture test should be conducted to Install a 6- or 10-mil polyethylene vapor retarder ensure the slab is properly cured prior to installation NOTE: It is possible for this method to yield a false directly to the slab, overlapping two feet(2')at the of Warmboard-R. result in cooler conditions when the concrete may seams. Next, install a 1/2" Homasote Comfort Base retain moisture and fail to condense on the plastic. or Homasote 440 SoundBarrier over the entire slab Like any wood product, if Warmboard-R panels are (adding a R-value of 1.2). Gap all Homasote panels exposed to standing water or moisture intrusion, To ensure a reliable result, make sure that the surface 3/16"from all adjoining panels and 3/8"from walls. the wood will swell and rot. DO NOT use temperatures and ambient conditions during the test Use fasteners (21 per panel)to attach the entire Warmboard-R if these environmental conditions are very similar to those present after the Warmboard assembly to the slab. Find the instructions for these are possible during or after construction. panels are installed. products at homasote.com If not performing a moisture test,we recommend giving a newly poured slab 90 days to cure fully. Once certain of the moisture level of the slab, we recommend one of two installation methods. The slab MUST have sufficient drainage from rain •• l and snow at all times.Failure to provide sufficient drainage will void any product warranty. Warmboard-R MUST be mechanically fastened, not just floated or glued.Failure to mechanically fasten the product will void any product warranty. 1.800.556.0595 0 for assistance Fastening to Concrete ► Method 1:Split Drive Anchors(Recommended) • Use a 31b.sledge hammer to force the Concrete drilling should be done with the Split Drive Anchor through the pre-drilled Warmboard panels in place (pre-drilling the concrete panel and into the concrete is not recommended). Use a heavy duty roto hammer drill and a high-quality masonry drill bit.The hole should be 1/2"deeper than the required specification. 011E111111111 Once drilled, draw the drill bit in and out a few times to loosen excess material. Use a shop vacuum to 21/2"x 1/4"flat head Split Drive Anchor: remove the debris. Use 1/4"high-quality masonry bit Choose one of the following methods to fasten the Warmboard panels to the concrete. Use a pattern of ► Method 2:Tapcons 3 rows of 3. Simply install the Tapcon through the pre-drilled hole and into the concrete 0111=1111001MMISW 21/2"x 1/4"flat head Tapcon concrete screw: Use 3/16"high-quality masonry bit ► Method 3 Powder-actuated fasteners Warmboard-R Select an actuated tool,and charge,designed for fastening 11/8"plywood to concrete.Choose a Fastener fastener that will grab a minimum of 1"of concrete 6-mil Vapor Barrier Concrete Slab 0.138"Hilti X-C P8 Powder-actuated fastener: 1° IF Use Hilti DX 2 semi-automatic,powder-actuated tool Flat head Split Drive Anchors will save you many hours of labor,but may be difficult to find in retail or approved equivalent locations.Call 888.498.5747 or visit confast.com. Fasteners MUST exceed a length of 21/4"if using Homasote between the slab and Warmboard-R WARMBOARD-R CUSTOM ROUTING 11 Check List ► _ Review all the tubing layout plans ‘.,.. '' ► Use a permanent marker and the provided wood / "' ai templates to mark all areas on the Warmboard panel that will require custom routing ► Prepare router with router bit,template guide and 141' k °` • ` template guide lock nut =" V ` N. ' A Procedurelifr o ► • Place the routing template over the appropriate area t+ and fasten into position with 3 screws.Be sure the / OPPIrr screws do not interfere with the path of the router ► Ensure that the router bit and template guide areAlle properly installed,then proceed with the route pow, "I" ► When complete,remove the template guide and use —411, a 4"grinder,Dremel or deburring tool to smooth the ,:• area for the tubing installation 1 ► Use a shop vac to clear debris from the channel i ► Place a piece of tubing into the new groove to • confirm it sits level and flush with the top of the Warmboard panel I 4 c 4 -• The router base needs room to operate and may be difficult to use near a wall-plan accordingly. Visit warmboard.com/videos for instruction. TUBING INSTALLATION 1.800.556.0595 1 2 for assistance Step 1: Clean the Panels Step 3: Return Lines to Manifolds B urand int nburr. Clearing the panels and tubing channels of debris will To return the PEX tubing back to the manifolds, (see note below) ensure the tubing sits flush and level.This is essential there are a few different options which will work. Warmboard-R to a well functioning radiant system. Subfloor ► Method 1 ► Use a broom,shop vacuum or leaf blower to clear Use the existing channels in the panels to return To Manifold the debris from the panel and tubing channels the tubing to the manifold ► Use a 1/2"conduit to break loose stuck-on material ► Method 2 Create custom routes in the panel and return the tubing back to the manifold / Step 2: Mark the Tubing Paths ► Method 3 v ► Follow the Tubing Layout plan set and mark Create a bury point and feed the tubing back to the the tubing paths on your panels with a manifold by going through the subfloor(illustration) Insulate between permanent marker Joists ► Method 4 ► Clearly mark turns,bury points,custom routes, Use the"panel cut back"to create a tubing channel and manifold locations above the slab for the tubing to return to the ► Mark locations of all plumbing waste lines manifold.Fill with Portland cement to create a Subfloor/Slab level surface(illustration) 13/16"Nailing Surface ► Mark each loopto avoid anyfuture confusion 1/2"PEX Tubing Portland Cement or Fix-It-All Warmboard-R Ar Use a Sharpie or wax pencil to mark panels. Use a 3/4"drill bit to create a 3/4"x 11/2"bury point which will help prevent the tube from kinking. Visit warmboard.com/videos for instruction. WARMBOARD-R 13 Step 4: Custom Routes Step 6: Install Manifold(s) Step 7: Tubing Repair Follow the instructions on page 11. ► Follow all installation details and specifications Every tubing manufacturer makes a repair coupler to documented by the manufacturer.Manifolds are repair a punctured section of tubing. Repairing tubing usually placed in closets or between interior wall damage is an easy fix and should require less than Step 5: Install Tubing stud bays with an access door 30 minutes to complete. ► Avoid installing tubing at temperatures below 50°F ► Clearly mark all supply and return loops. ► Pop the tube out of the tubing channel as the tubing becomes rigid and difficult to bend Document rooms and zones on the manifolds to ► ONLY use tubing from our Approved Tubing List avoid future confusion ► Cut out the damaged area and insert the coupler (pg.5) ► Pressure test all loops to the mechanical code ► Chisel a groove into the panel to accommodate the ► Use a 16oz.rubber mallet to secure the tubing in the requirement of 100 PSI for 15 minutes.After this, size of the coupler channel(be sure the tubing sits level and flush with the PSI will drop 5-10%(this is normal) the top of the panel) ► After the 15 minutes,lower the air pressure to ► DO NOT use silicone/adhesive in the channels 60 PSI and maintain during the construction process. After this,the PSI will drop 5-10%(this is normal) ► Tape over the ends of the tubing to prevent debris from clogging the lines ► A tubing uncoiler will help avoid twists and kinks Minimum Framing Dimensions when installing the tubing.It is an excellent investment and highly recommended for large jobs • ---, Loops Width x Height -w, S. ► Use nail plates to secure tubing as needed and 2 Loop Manifold 14"x 36"clear ' • remove before finish floors are installed 3 Loop Manifold 16"x 36"clear 4 Loop Manifold 17"x 36"clear 5 Loop Manifold 20"x 36"clear 6 Loop Manifold 22"x 36"clear 7 Loop Manifold 24"x 36"clear -- . 8 Loop Manifold 26"x 36"clear The tubing MUST be level and flush with the surface of Warmboard. .. 'r i Consider Ram Board(or equivalent)to help protect the tubing in high traffic areas. MAN I FOLD CABINET 1.800.556.0595 14 for assistance Wall Stud Wall Stud Stud Bay Drywall 1/2"Plywood v ' Flow Meters/ Backing Balance Valves Air Vent ' Access Panel . PM 1 ; a'� i • ■ �� Loop Shutoff I\I (I I 1.1 ii '■IILril ^I I Shutoff av: ■ ■ ■ ■ iv _ 4 �i li_ Ir L____ ____•m (%, a. 1•1 I■ ICI 1•1 1•1 •1 w 41 ., WI ,p i ' , i . i ai sulic SIDE VIEW FRONT VIEW WARMBOARD-R HARDWOOD FLOORING 15 Hardwood Recommendations A Word about Engineered Flooring --- , - Solid, sawn, hardwood planks have been an integral Numerous engineered flooring products have been • part of residential architecture for over 400 years. developed in recent years. With each product comes Since 1998, over 40 million square feet has been variations in material, assembly method, dimensional successfully installed over Warmboard.The long stability and overall quality. Warmboard is unable to documented history of hardwood combined with test every iteration of these products and therefore our decades of experience tells us that traditional cannot express an informed opinion on how 3/4" solid plank flooring is the gold standard and variations in humidity may impact their dimensional accordingly,that is our strong recommendation. stability. We leave it to the consumer to do their own All wood products expand and contract with changes due diligence to determine any particular engineered in humidity. Solid plank wood is naturally monolithic product's suitability for their project. and expands and contracts most evenly. When these !` dimensional changes do occur, cupping, crowning A Word about Flooring Thickness and gapping at the edges may result.These changes are inherent to all wood flooring, regardless of the Many mistakenly believe that a radiant floor cannot heating method.To minimize such dimensional have 3/4"thick floor coverings.This thinking is based changes, especially as humidity varies throughout on a theory that the resulting higher R-value prevents the seasons,we also recommend quartersawn the system from adequately heating the space. and/or rift cut planks due to their stability. This may be true for low conductivity radiant panels, but not Warmboard.Apart from the fact that thicker To further limit dimensional movement, ensure hardwood,all things being equal, is better quality, the hardwood has the proper moisture content at its increased R-value causes more even heat across the time of installation (pg. 16).A good hardwood your floor with the result that your feet will not be installer will know the ideal range for your geographic able to tell where tubing is and isn't. With thinner region (moisture content should be at the low end of material,the temperature variation across the tubing this range).A moisture meter is required to determine is increased causing what is known in the radiant when that moisture percentage is achieved. industry as"striping"which makes your floor less comfortable.And comfort is the primary reason for Warmboard's existence, which is why we recommend using 3/4" hardwood over our panels. Whether using plank,engineered or laminate wood flooring,there have been thousands of successful installations over Warmboard. HARDWOOD ACCLIMATION 1.800.556.0595 1 v fortassistance Hardwood Flooring Acclimation Prior to flooring installation, the moisture content of Warmboard-R should be 12%or less.The moisture Before the hardwood is on site, ensure the interior content of the finish hardwood should be between plastering is complete (and dry),and that the radiant 6-9%,though this will vary by climate zone. Be sure • system has been operating for a couple weeks to discuss this with your flooring installer. OIL . . . in order to reduce any excess moisture from the Warmboard panels. In some locales,you may It will be difficult to get a moisture reading from need to operate the air conditioner simultaneously Warmboard due to its aluminum surface, so we with Warmboard to lower the indoor humidity. a moisture meter with insulated contact pins and The hardwood should experience consistent, hammer probe.The Delmhorst J4 and J2000 models ,-- - low humidity once on site. (delmhorst.com) are good options, and can be .� upgraded with pins and hammer probe. Consider any moisture or humidity intrusion that may take place in the future, such as a crawl space digliiii ...:. beneath the Warmboard panels which could be dry Operating the System in the summer and experience water intrusion in the winter.This could cause large humidity swings and Circulate warm water under the newly installed excess movement of the hardwood flooring. floor for a few days before gradually bringing the water temperature up to the designed set point. Once the interior space is properly conditioned to For example, start with 100°F,then increase to the desired relative humidity, bring in the wood 120°F. Finalize the set point according to the needs planks and sticker them - pulling the planks out of of the structure. their boxes and setting them up so air can circulate around them (photo). Ideally,the heating system should use "Indoor Reset" or another type of reset control strategy. "Reset" is a system for automatically resetting boiler temperatures (up or down),to better meet changing heatloads. This is an excellent strategy for hardwood floors. AIt is ESSENTIAL to acclimate wood flooring prior to installation.Acclimation time can vary by season,but two weeks is recommended. Keep low moisture levels in the hardwood to ensure long term stability.Maintain an indoor ambient temperature between 60-80°F(15-26°C), and keep the humidity between 30-50%. WARMBOARD-R INSTALLING SOLID PLANK 17 3 Installation Methods Method 1: Nail Directly • 4 ► Method 1 Installing hardwood perpendicular to the tubing Nail hardwood directly pattern is the best method as it allows you to see the tubing and avoid damaging it.Tongue nail at a 45° �, ► Method 2 angle at 6"on centers and use 2"flooring nails. Nail and glue hardwood directly • ► Method 3 Occasionally, plank flooring may need to run the same direction as the tubing, and nailing the plank \ \ Glue hardwood directly(no fasteners) could cause tubing damage. Should this occur, DO NOT nail - either glue with an approved adhesive • Approved Adhesives or face nail the plank. While the planks can be successfully nailed down parallel to the tubing ► Bona R850T, R851, R859 pattern, this method may require extra labor. ► Bostik's BEST, BST,Climb,EFA+,GreenForce, Strategic planning with the layout can avoid face HDAC, ProCure, Pro-MSP,Ultra-Set SingleStep 2, nailing and gluing in many locations. Vapor-Lock ► Mapei Ultrabond Eco 975,980 ► Sikabond T-35 and T-55 ► Stauf Adhesives PUK-455 Wide Plank Adhesive, PUM-950 Power Mastic ► Titebond 771,811,821 ► Wakol MS 230, MS 232,MS 260,MS 262,MS 290, MS 292,MS 245/246,PU 224, PU 385 It is essential to lower the moisture content of ( , your hardwood prior to installation(pg.15) Warranty letters from these companies are available upon request. Warmboard's aluminum surface acts as a vapor barrier-no additional vapor retarder is required. Wood flooring can be installed directly over the Warmboard panels. When installing hardwood parallel to the tubing, rip the first plank at an appropriate width to create Visit warmboard.com/videos to watch our a nailing pattern which will avoid the tubing at all hardwood installation video. T&G locations. 1.800.556.0595 1 Q for assistance Q Method 2: Nail & Glue Directly Method 3: Glue Directly gl Aside from the glue itself,you do not need to install Aside from the glue itself,you do not need to install additional material between the Warmboard panel additional material between the Warmboard panel and the hardwood. and the hardwood. / f 11141\44*Ip Installing hardwood perpendicular to the tubing pattern is the best method as it allows you to see ` the tubing and avoid damaging it.Tongue nail at a / ��! 45°angle using 2"flooring nails at 6" on center. Occasionally, plank flooring may run the same direction as the tubing, and nailing the plank could cause tubing damage. Should this occur, DO NOT nail - the glue will successfully bond the plank to the Warmboard panel. ONLY use approved adhesives listed in the guide 16, (pg.17,19).Failure to use approved adhesives will void any product warranty. WARMBOARD-R ENGINEERED, LAMINATE 19 AND BAMBOO 4 Installation Methods Approved Adhesives Method 1: Floating Floor ► Method 1 ► Bona R850T, R851, R859 This is a great option because the floorboards are Floating Floor locked together at the joints of each board and not ► Bostik's BEST, BST,Climb,EFA+,GreenForce, nailed or adhered to the subfloor.This approach ► Method 2 HDAC, ProCure, Pro-MSP,Ultra-Set SingleStep 2, allows the whole floor to move as a single unit if a Nail planks directly Vapor-Lock dimensional change within the floor takes place. ► Method 3 ► Mapei Ultrabond Eco 975,980 Nail and glue planks directly We highly recommend installing acoustic padding ► Sikabond T-35 and T-55 between Warmboard and the planks.A good ► Method 4 option is the Roberts'AirGuard Premium 3-in-1 Glue the planks directly(no fasteners) ► Stauf Adhesives PUK-455 Wide Plank Adhesive, Underlayment with Microban (homedepot.com) PUM-950 Power Mastic ► Titebond 771,811,821 ► Wakol MS 230, MS 232,MS 260,MS 262,MS 290, MS 292,MS 245/246,PU 224, PU 385 Warranty letters from these companies are available upon request. It is essential to lower the moisture content of l ' your hardwood prior to installation(pg.16) rWarmboard's aluminum surface acts as a vapor barrier-no additional vapor retarder is required. Wood flooring can be installed directly over the Warmboard panels. If considering bamboo,visit plyboo.com. They offer a full warranty with Warmboard. 1.800.556.0595 010 for assistance Method 2: Nail Directly Method 3: Nail and Glue Directly Method 4: Glue Directly You do not need to install additional material Aside from the glue itself,you do not need to install Aside from the glue itself,you do not need any between the Warmboard panel and the hardwood. additional material between the Warmboard panel additional material between the Warmboard panel and the hardwood. and the hardwood. Installing hardwood perpendicular to the tubing pattern is the best method as it allows you to see Installing hardwood perpendicular to the tubing the tubing and avoid damaging it.Tongue nail at a pattern is the best method as it allows you to see 452 angle using 2"flooring nails at 6" on center. the tubing and avoid damaging it.Tongue nail at a 45° angle using 2"flooring nails at 6" on center. Occasionally, plank flooring may need to run the same direction as the tubing, and nailing the plank Occasionally, plank flooring may run the same could cause tubing damage. Should this occur, direction as the tubing, and nailing the plank could DO NOT nail - either glue with an approved adhesive cause tubing damage. Should this occur, DO NOT or face nail the plank. While the planks can be nail - the glue will successfully bond the plank to successfully nailed down parallel to the tubing the Warmboard panel. pattern, this method may require extra labor. Strategic planning with the layout can avoid face nailing and gluing in many locations. When installing hardwood parallel to the tubing, rip the first plank at an appropriate width to create a nailing pattern which will avoid the tubing at all T&G locations. ONLY use approved adhesives listed in the guide (pg.17,19).Failure to use approved adhesives will void any product warranty. WARMBOARD-R INSTALLING TILE 21 Tile or stone set to Warmboard-R is subject to all of TCNA Ratings & Description Recommended Assemblies the tile setting requirements of any ordinary unheated ► TCNA rating:Residential(homes) ► Method 1 Page 22 wooden subfloor. Tile survived 3 cycles of testing with no damage Backer board TCNA rating: Extra Heavy ► TCNA rating:Light Commercial(offices,etc.) Testing and Approvals Tile survived 6 cycles of testing with no damage ► Method 2 Page 24 We recommend using one of seven tile assemblies Mud bed, Mapei when installing tile or stone over Warmboard. ► TCNA rating:Moderate(hospitals,etc.) TCNA rating: Extra Heavy Three of these methods have been warrantied and Tile survived 10 cycles of testing with no damage approved byproduct manufacturers,and five have ► Method 3 Page 25 pP ► TCNA rating:Heavy(shopping malls,etc.) Self-Leveling Underlayment,Mapei been rigorously tested by the Tile Council of America Tile survived 12 cycles of testing with no damage TCNA rating: Extra Heavy (TCNA).These tests provide an expert third party endorsement for best practices when installing tile ► TCNA rating:Extra Heavy(airports,etc.) ► Method 4 Page 26 and stone over Warmboard radiant panels. Tile survived 14 cycles of testing with no damage Uncoupling Membrane, Blanke TCNA rating: Light Commercial Robinson Floor Test(ASTM C627) results are available upon request. ► Method 5 Page 27 Uncoupling Membrane, Mapei NOTE: Warmboard-R has not been tested by the TCNA rating: Light Commercial TCNA. However, due to the near identical properties of the panel, we are convinced that Warmboard-R ► Method 6 Page 28 would perform equally under the testing conditions. Uncoupling Membrane 1,Schluter Our experience in the field supports this. Approved:Schluter ► Method 7 Page 29 Uncoupling Membrane 2,Schluter Approved:Schluter ► Method 8 Page 30 Ensure your chosen products and methods meet Uncoupling Mat,RedGard the standards set by the TCNA,ANSI and ICC. Approved:Custom Building Products Follow the manufacturer's recommendations when using their products. Warmboard Inc.is not an agent for manufacturers listed herein,and gives no implied warranty for any of these products or manufacturers on these assemblies. BACKER BOARD 1.800.556.0595 22 for assistance Backer boards have a low mass and are relatively Warmboard panel inexpensive to install.They can be 1/4" or 1/2"thick and provide a base for tiled areas which will match up Flexbond° Custom Building Products well with adjacent finish flooring.There are a variety of Cementitious Backer Units (CBUs) available. Wonderboard°Lite Custom Building Products ► Apply thinset to the surface of Warmboard using a square-notched trowel(this layer will function as a FLexbond® y Custom Building Products butter coating) Tile or Stone Flooring ► Immediately,before the thinset dries,fasten the Backer board using Backer board screws(pg.23) ► Use Backer board tape on all seams then apply the thinset ► Finish with tile or stone A warranty letter from Custom Building Products I I %11111., for this application is available upon request. -_ 1 Surface temperatures of the finish flooring should ( ' not exceed 85°F. This specific assembly was TCNA tested. Substituting comparable brands is acceptable. r Backer board MUST run perpendicular to the Warmboard panels.Be sure to stagger the seams and take special care when fastening to avoid tubing damage. WARMBOARD-R BACKER BOARD STENCIL 23 Using a clear polyethylene sheet(3- or 4-mil),take a 4. 41" - --;> �,, -,' permanent marker to quickly create a stencil of the ,-,7-,.,_--_, w -� tubing pattern. Now, use this stencil as a guide over ,� the Backer board to install the fasteners and avoidit - `\ tubing damage. ► Cut the polyethylene to the size of Backer board (cut all 3'x 5'stencils at once to save time).DO NOT - °' . cut directly over the Warmboard or the tubing Ole 2 - ► Place the cut sheets over the Warmboard panel and - �'' 1 tape down the corners.With a permanent marker, \ . clearly mark the top and bottom of the stencil, then trace the tubing pattern.Remove the stencil and lay flat next to your work areas =-- ' ► Trowel a coat of Thin-set over the Warmboard panel 1 and set the Backer board ► Align the stencil and tape down over the Backer board.Pre-drill all safe fastening locations, ...i L ,. i then remove stencil and fasten as normal ________________ \Iti_.\, , _ _ / \ Take care to avoid tubing damage. MUD BED, MAPEI 1.800.556.0595 24 for assistance A mortar bed is the traditional method of addressing Warmboard Panel the expansion, contraction and deflection properties 4-mil Polyethylene Sheeting of wooden subfloors while providing a thick, continuous and stable surface for tile adhesion. Diamond Wire Mesh Lath However,they are expensive and add significant mass to a system.The thickness often causes the elevation 4 to 1TM Mud Bed Mix y Mapei of tile areas to misalign with adjacent carpeted or UltraFlexTM 2 hardwood areas. Mapei ► Install a layer of 4-or 6-mil polyethylene to serve as Tile or Stone Flooring a cleavage membrane ► Fasten down a diamond wire mesh lath over the membrane using crown staples ► Finish with a minimum 3/4"mortar bed (Mapei®4-to-1 Mud Bed Mix or equal). ► After the mortar bed has cured,apply thinset ► Finish with tile or stone TCNA testing results are available upon request. A warranty letter from Mapei for this application is available upon request. Surface temperatures of the finish flooring should l ' not exceed 85°F. This specific assembly was TCNA tested. Substituting comparable brands is acceptable. WARMBOARD-R SELF- LEVELING 25 UNDERLAYMENT, MAPEI This product has a thin profile with the great strength Warmboard panel of a mortar bed. Diamond Wire Mesh Lath ► Clean the panels and apply"Mapei Primer T" (per Mapei instructions) 3/8° Ultraplan Easy Mapei ► Follow with the diamond wire mesh lath and attach with crown staples ULtraFtexTM 2 Mapei ► Mix and apply"Ultraplan°Easy"at a thickness of i Tile or Stone Flooring 3/8"or more ► Apply thinset ► Finish with tile or stone TCNA testing results are availbale upon request. A warranty letter from Mapei for this application is available upon request. % i�i /��5°i J�J�i r i AISurface temperatures of the finish flooring should not exceed 85°F. This assembly was TCNA tested.Substituting comparable brands is NOT recommended. UNCOUPLING MEMBRANE , 1.800.556.0595 �L for assistance v BLANKE Blanke•PERMAT offers amazing crack isolation Warmboard panel protection with superior compression and tensile strength.The Blanke•PERMAT reinforced mesh Granirapid® panel adds major support to wood subfloors, greatly Mapei reducing vertical subfloor movement(deflection). Blanke• PERMAT Blanke ► Clean the panels UltraFlexTm 2 Mapei ► Trowel on the Mapei Granirapid thinset mortar using a V-notched trowel /Tile or Stone Flooring ► Immediately install the Permat ► The next day,follow with thinset using a square- notched trowel 111.441144. ► Finish with tile or stone v TCNA testing results are availbale upon request. ........ A warranty letter from Blanke, Inc. for this application '- iiminsistatl..t?..x.::::::: is available upon request. - L._ 1 (04.....00 I Surface temperatures of the finish flooring should not exceed 85°F. This assembly was TCNA tested.Substituting comparable brands is NOT recommended. WARMBOARD-R UNCOUPLING MEMBRANE , 27 MAPEI Mapeguard UM is a premium-performance, Warmboard panel lightweight,waterproofing and vapor-pressure equalizing membrane that provides crack suppression Granirapid® for ceramic tile and stone installations. Mapei Mapeguard°UM ► Apply the Mapei Granirapid®thinset mortar using a Mapei v-notched trowel Kerabond/KeralasticTM System or UltraflexTM 3 ► Install the Mapeguard UM Mapei Tile or Stone Flooring ► Wait for the mortar below the Mapeguard UM to be completely dry ► Trowel on the Kerabond/Keralastic System (or Ultraflex 3) ► Immediately finish with tile or stone TCNA testing results are availbale upon request. . -wit aripp, Surface temperatures of the finish flooring AI should not exceed 85°F. This assembly was TCNA tested.Substituting brands is NOT recommended. UNCOUPLING MEMBRANE 1.800.556.0595 28 for assistance SCH LUTE R® Schluter®-DITRA°and DITRA-XL" uncoupling Warmboard panel membranes are designed to help prevent cracking in ceramic and stone tile installations. Made of Schluter FAST-SET® waterproof polyethylene,these product installations can be waterproofed with minimal effort. Schluter°-DITRAF'or DITRA-XLM ► Trowel a layer of Schluter FAST-SET°directly over the Warmboard and PEX tubing,filling all empty Schluter ALL SET° tubing channels with the thinset Tile or Stone Flooring ► Before the thinset is cured,install the uncoupling membrane v * ► Once the Schulter FAST-SET'is completely dry, trowel Schluter ALL-SET'modified thinset mortar directly on to the membrane ► Finish with stone or tile before the Schluter ALL-SET' has cured Follow all Schluter installation instructions for these products. An approval letter from Schluter is available upon request. As an alternative approved method,Schluter FAST-SET®can be used both above and below the uncoupling membrane. AFor stone applications over DITRA,structural joist (noMUST be on 16"centers. Surface temperatures of the finish flooring should not exceed 85°F. Substituting brands is NOT recommended. WARMBOARD-R UNCOUPLING MEMBRANE , 29 SCH LUTE R® Warmboard panel Schluter°-DITRA°and DITRA-XL"uncoupling Schluter° Primer U membranes are designed to help prevent cracking in ceramic and stone tile installations. Made of Schluter ALL SETS waterproof polyethylene, these product installations can be waterproofed with minimal effort. Schluter° DITRATM or DITRA XLT ► ROLL a Layer of Schluter° PRIMER-U directly over the Schluter ALL-SET® Warmboard and PEX tubing ► Apply a layer of Schluter°ALL-SET®.Before the /Tile or Stone Flooring thinset is cured,install the uncoupling membrane ► Once the Schulter°ALL-SET®is completely dry, trowel Schluter°ALL-SET®modified thinset mortar directly on top of the uncoupling membrane ► Finish with stone or tile before the Schluter° ALL-SET®has cured \Follow all Schluter installation instructions for these products. An approval letter from Schluter is available \ -11111(immIllir upon request.AFor stone applications over DITRA,structural joist (TJI)MUST be on 16"centers. Surface temperatures of the finish flooring should not exceed 85°F. Substituting brands is NOT recommended. UNCOUPLING MAT 1.800.556.0595 30 for assistance REDGARD The RedGard° Uncoupling Mat is a water and vapor- Warmboard panel proof uncoupling membrane that can be used for crack-isolation in most tile, porcelain or natural Granirapid® stone installations.This product absorbs stress Mapei and preserves the surface and integrity of the tile. RedGard®Uncoupling Mat Custom Building Products RedGard Uncoupling Mat's bonding layers have reinforced fleece which locks mortar into the mat, UltraFlexTM 2 Mapei ensuring strong, reliable installations. ► Clean the panels /Tile or Stone Flooring ► Apply the Mapei Granirapid°thinset mortar using a v-notched trowel. ► Immediately install the RedGard Uncoupling Mat ► The next day,follow with thinset using a square- notched trowel ► Finish with tile or stone. An approval letter from Custom Building Products is available upon request. Surface temperatures of the finish flooring l l should not exceed 85°F. Substituting brands is NOT recommended. WARMBOARD-R CARPET 31 Carpet and padding (cushion) is a very common Recommended Padding Other Product Options finish floor that can be installed directly over Warmboard. We recommend a carpet assembly with Company it R-value Product li 'product imk. Thickness R-value a low R-value (2.0-2.5) so the system can use the Leggett&Platt 0.80 Arcadia Slab Foam Rubber 1/4" R-0.31 same water temperatures beneath all finish flooring 1.800.866.9446 0.70 Aurora,Laguna, 3/8" R-0.47 types. Higher values may require creating a two 1pcarpetcushion.corn Coronado, 1/2. R-0.62 temperature system. 1/ 0.60 Solano Waffle Rubber 4 R-0.62 The R-values listed below are approximate based on Sponge Cushion 0.71-0.80 Luxury Step 3/8" R-1.00 carpet thickness. Check with the manufacturer to 1.800.435.4062 0.61-0.70 Full House, 1/2„ R-1.33 obtain accurate values. commercial- Tred-MOR 3700, Fiber/Hair/Jute 1/4" R-0.97 carpetcushion.com Opulence, 3/8" R-1.62 r p 1/2" R-2.15 Carpet thickness Approximate R-value Horizon 100, 1/8" +/-0.6 Cloud 9, Luxury Walk While many brands of carpet padding are available 1/4" +/-1.0 in the marketplace,we DO NOT recommend Prime 0.51-0.60 Berber Supreme, 1/2" +/-1.4 Horizon 80,Royal Urethane, Bonded Urethane or Sunburst products 3/4" +/-1.8 due to their high R-values. Flex,Pinnacle 1 +/-2.2 _ 0.41-0.50 Luxury Walk, Granite IV, ► Before installing the padding,fill all of the empty Tred-MOR 2568, tubing grooves with a floor leveling compound Tred-MOR 2580 (Portland cement)to make the grooves flush and 0.31-0.40 Eclipse, level with the panel surface.Scrap pieces of PEX is Tred-MOR 2500, also a good solution,though they should be fastened Contract Master, into place to prevent movement I Onyx Super 0.21-0.30 Tred-MOR 1562, ► DO NOT install padding and carpet until all the loops Onyx,Badger have been properly pressure tested Surface temperatures of the finish flooring should l ' not exceed 85°F. CORK FLOORING 1.800.556.0595 32 for assistance Cork flooring naturally has a high insulation value. Standard Cork - By choosing a product that is 1/4"to 1/2"thick, _ the R-value will remain low(1.5 or less) causing heat The installation of an underlayment is required _ output and response times to improve. It will also over the Warmboard surface before standard - simplify your mechanical design,allowing your cork cork flooring is installed. We encourage a 3/4"thick floor to operate at the same water temperatures as finish floor assembly, but priority should be given to _. tile, hardwood or carpet. matching floor heights throughout the house.Take care when fastening the underlayment to Warmboard = Established brands include Expanko Cork because the tubing is obscured during this step. `.- (expanko.com),American Cork(amcork.com), We recommend installing a 1/4"APA listed plywood = .r and Natural Cork(naturalcork.com). underlayment with a sanded face. For complete - -! - ",. installation details, refer to the "Engineered Wood ,�.-r� •- sc- ' Construction Guide"at apawood.orq. Complete �"..��-. �>! the installation of the cork by following all the �� =r s..: manufacturer guidelines and specifications. - - ' - ",%% .is Once the underlayment is installed, the cork is -c 'r adhered using a urethane adhesive made for cork r; " applications. Consider Dri Tac 7500 (dritac.com). Cork Laminate Cork laminate products contain an MDF layer When using a plywood or OSB(or equivalent) sandwiched between two layers of cork. It is not underlayment,you MUST fully acclimate the panels necessary to put any barrier between the cork before installation.If the moisture content of the flooring and the Warmboard prior to installation. underlayment is too high,it will shrink from the floor This flooring installs the same as a floating floor and heating and cause an installation failure. requires no adhesive or nailing for proper installation, DO NOT use adhesive with plywood or OSB, providing flexibility for the homeowner if they ever only staples or screws. decide to change the floor covering. Surface temperatures of the finish flooring should not exceed 85°F. Failure to follow these guidelines will void any product warranty. ifFollow all installation instructions provided by your finish flooring manufacturer. WARMBOARD-R VINYL 33 There are several different types of vinyl flooring, Suggested Underlayments and all can be used with Warmboard. ► 1/4"or 1/2"interior plywood or OSB Increasing in popularity is the use of Luxury Vinyl Flooring (LVF)over Warmboard.This product ► 1/4"or 1/2"tile backerboard(bathrooms,kitchens) , emulates the look of natural materials like wood or ` stone, is a very durable and could be a great option il We encourage a 3/4"thick finish floor assembly, but K+ for areas expecting a lot of wear and tear. priority should be given to matching floor heights throughout the house. z, We recommend installing a substrate underlayment between the Warmboard and the vinyl finish floor. We recommend the Stencil Method (pg. 23) to avoid tubing damage. For tile Backer board installation, see page 22. AWhen using a plywood or OSB(or equivalent) underlayment,you MUST fully acclimate the panels before installation.If the moisture content of the underlayment is too high,it will shrink from the floor heating and cause an installation failure. DO NOT use adhesive with plywood or OSB, just staples or screws. Surface temperatures of the finish flooring should not exceed 85°F. Failure to follow these guidelines will void any product warranty. Follow all installation instructions provided by your finish flooring manufacturer. LINOLEUM 1.800.556.0595 3�}foror assistance Always install a substrate underlayment between the Suggested Underlayments Warmboard and the finish linoleum. ► 1/4"or 1/2"interior plywood or OSB ► 1/4"or 1/2"the backerboard(bathrooms,kitchens) We encourage a 3/4"thick finish floor assembly, but , ' priority should be given to ensure matching floor heights throughout the house. We recommend the Stencil Method (pg. 23)to avoid . ' tubing damage. For tile Backer board installation, see page 22. AWhen using a plywood or OSB(or equivalent) underlayment,you MUST fully acclimate the panels before installation.If the moisture content of the underlayment is too high,it will shrink from the floor heating and cause an installation failure. DO NOT use adhesive with plywood or OSB, just staples or screws. Surface temperatures of the finish flooring should not exceed 85°F. Failure to follow these guidelines will void any product warranty. Follow all installation instructions provided tfrby your finish flooring manufacturer. WARMBOARD-R FLOORING R-VALUES 35 Flooring Thickness Typical R-value R-value per inch Underlayment Thickness Typical R-value R-value per inch Softwood 3/4" 0.825 1.10 Plyboo 3/4" 0.825 1.10 Ash 3/4" 0.75 1.00 OSB 3/4" 1.05 1.40 Fir 3/4" 0.90 1.20 Engineered Wood 1/8" 0.20 1.60 Maple 3/4" 0.75 0.75 Flooring Pad Oak 3/4" 0.638 0.85 Carpet Pad/Slab 1/4" 0.32 1.28 Pine 3/4" 0.975 1.30 (rubber)33 lb. 3/8" 0.48 1/2" 0.64 Engineered Bamboo 3/4" 0.72 0.96 Engineered Wood 1/4" 0.25 1.0 Carpet Pad/Waffle 1/4" 0.62 2.48 (rubber)25 lb. 1/2" 1.24 3/8" 0.375 5/8" 0.625 Hair Jute 5/16" 1.25 3.88 1/2. ' 1.94 3/4" 0.750 Carpet 1/4" 0.70 2.80 Prime Urethane 5/16" 1.40 4.30 3 1/2" 2.15 /8" 1.05 1/2" 1.40 Bonded Urethane 5/16" 1.35 4.20 5/8 1.75 1/2" 2.1 3/4" 2.10 Dense Rubber 5/16" 0.25 1.30 Wool Carpet 3/8" 1.575 4.20 Flooring 1/2" 2.10 Recycled Rubber 1/2" 1.10 2.20 Vinyl(sheet) 1/8" 0.20 1.60 Flooring Vinyl,(composite tile) 1/8" 0.20 1.60 Thin-set Mortar 1/8" 0.05 1.00 Linoleum 1/8" 0.20 1.60 MDF/Plastic Laminate y 0.50 1.00 1/4" 0.40 Laminate Floor Pad 4/25" 0.30 1.92 Cork 3/8" 1.125 3.00 Cork/MDF/Laminate 1/2" 1.175 2.35 Brick 11/2" 3.375 2.25 Marble 1/2" 0.40 0.80 Ceramic Tile 1/4" 0.25 1.00 HARDWOOD MANUFACTURERS 1.8f assistance 0o0.556.059536 A list of hardwood manufacturers who endorse their products for use with Warmboard. Other brands of hardwood can also be installed. A list of hardwood manufacturers who endorse their Arrigoni Woods mafi products for use with Warmboard. Other brands can arrigoniwood.com//888.423.6668 mafi.com//647.409.5984 also be installed. Mill&Woods Mirage Floors millandwoods.com//800.283.6038 miragefloors.com //800.463.1303 Boen Hardwood Floors Mountain Lumber boen.com //888.897.0800 mountainlumber.com //800.445.2671 BR-111 Exotic Hardwood Monarch Plank Hardwood br111.com//800.525.2711 monarchplank.com Carlisle Wide Plank Floors Plyboo wideplankflooring.com//800.595.9663 plyboo.com //866.835.9859 Craft Artisan Hardwood Schotten&Hansen craftfloor.com//877.828.1888 schotten-hansen.com Dinesen Signature Hardwoods dinesen.com//+45.7455.2140 signaturehardwoods.com //866.554.4252 The Heartpine Company Southern Wood Floors heartpinecompany.com//434.234.8199 southernwoodfloors.com //888.488.7463 Homerwood Hardwood Vermont Plank Flooring homerwood.com//814.827.3855 vermontplankflooring.com //866.804.9587 Junckers Hardwood Floors Vintage Flooring junckershardwood.com//800.878.9663 vintageflooring.com //877.256.0231 Launstein Floors launstein.com//888.339.4639 Lauzon Hardwood Flooring lauzonflooring.com//800.665.6765 WARMBOARD-R WATER TEMPERATURE CHART 37 0.5 1.0 1.5 2.0 2.5 3.0 85 30 3.5 4.0 80 20 75 10 IL 80 100 120 140 160 180 Average of Supply/Return Water Temperature at Manifold for Good Dynamic Performance This chart assumes an ambient air temperature of 70°F =R-value(thermal resistance) Steady State Performance requires 10%lower supply temperature. Assumes minimum R-19 insulation below the floor. NOTICE:Customer is solely responsible for determining whether the prod- ucts and the information contained in this installation guide are appropriate for Customer's use and are in compliance with applicable laws because the applicable laws related to the installation and use of this product may vary from one location to another and may change with time.Customer represents and warrants that Customer is required to check current local laws,building codes and other local requirements and that all local requirements will be adhered to in connection with the installation of this product. NO EXPRESS WARRANTIES ARE GIVEN EXCEPT FOR ANY APPLICABLE WRITTEN WARRANTIES SPECIFICALLY PROVIDED BY WARMBOARD. ALL IMPLIED WARRANTIES INCLUDING THOSE OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE EXPRESSLY EXCLUD- ED.FAILURE TO INSTALL WARMBOARD PRODUCTS ACCORDING TO MANUFACTURER'S INSTRUCTIONS WILL VOID ALL APPLICABLE WAR- RANTIES.IT IS EXPRESSLY UNDERSTOOD THAT WARMBOARD IS NOT RESPONSIBLE FOR ANY CONSEQUENTIAL OR OTHER DAMAGES THAT MAY ARISE FROM USING WARMBOARD PRODUCTS OR COMPONENTS. Warmboard assumes no obligation or liability for the information contained in this document.The Customer assumes all risks as to the use of this product.Customer's exclusive remedy or any claim(including any claim for negligence,strict liability,or tort,without limitation)shall be limited to the warranty coverage expressly provided in Warmboard's warranty docu- ments.Failure to stringently adhere to any of the recommended procedures of this installation guide and/or any other Warmboard document related to this product shall release Warmboard of all liability with respect to this product or the use thereof. For complete warranty information please cal11.8OO.556.O5951(1%or visit warmboard.com warmboard.com II 800.556.0595 KEEP OUT OF REACH OF CHILDREN