T B. Owner Responsibilities:
CITY OF ASPEN 1. The project owner,an agent of the owner,or the design professional in responsible charge acting CITY OF
as the owner's agent,is responsible for employing special-inspection services.The special ASPEN
SPECIAL INSPECTION AND TESTING AGREEMENT inspector/agency shall not be in the employ of the contractor,subcontractor or material supplier. Proscenium wall and curtain approved for removal by
[IBC Sec 1704.1]In case of an owner/contractor,the special inspector\agency shall be employed
This form is required for projects needing special inspection and/or testing per Chapter l7 of the International as specified by the building official. chief building official. Stage height and area do not
Building Code(IBC). C. Design Professional in Responsible Charge Responsibilities:
Project 320EHyman Ave,Aspen,CO 81611 Permit Number. 0015-2015-BOOM Design Professional in Jiecpnnv;b/e Charge definition:An individual who is registered or licensed to practice their require proscenium per 2021 IBC 410.2. Smoke Theseplans muu Ke s et at the
J respective design profession as defined by the statutory requirements of the professional registration laws of the state or P
BEFORE A PERMIT CAN BE ISSUED:The owner,or the design professional in responsible charge,acting as jurisdiction in which the project is to be constructed;who is engaged by the owner to review and coordinate certain building site or inspection
the owner's agent,Shall complete two copies of this agreement and the attached special-inspection and Testing aspects of the project,as determined by the building official,for compatibility with the design of the building or control system present.
Schedule,includingthere tired acknowledgments.A pre-construction conference with the attics involved maybe structure' delays may occur.Construction
q gmen pre-conp 1. Prepare statement of special inspections.The registered design professional in responsible shall conform to these plans.All
required to review the special-inspection requirements and procedures. charge shall prepare a statement of special inspections in accordance with IBC Section 1705 for
APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the projects for submittal by the applicant.The statement of special inspections shall identify the following: changes shall be approved by
which they provide special inspections.Special inspectors shall be approved by the building department prior to a. The materials,systems,components and work required to have special inspection or Ifiliging official.
performing any duties.Special inspectors shall submit their qualifications and are subject to personal interviews for testing by the building official or by the registered design professional responsible for
pre-qualification.Special inspectors shall display approved identification,as stipulated by the building official, each portion of the work.
when performing the function of special inspector. b. The type and extent of each special inspection.
Special inspection and testing Hall meet he minimum a Df he International BuildingeDde Section c. The type and extent of each test. SEPARATE PERMITS ARE
peci pee g s requirements d. For each type of special inspection,identification as to whether it will be continuous
1704.The following conditions are also applicable: special inspection or periodic special inspection. APPLICATION ACCEPTED DATE 2021-04-11 PERMIT NUMBER: 0015-2024-BCOM REQUIRED FOR ELECTRICAL,
A. Special Inspector Responsibilities: D. Contractor Responsibilities: PLUMBING,MECHANICAL,OR
1. Notify the special inspector.The contractor is responsible for notifying the special inspector or FIRE SPRINKLER WORK
1. Signify presence at job site.Special inspectors should notify contractor personnel of their agency regarding individual inspections for items listed on the attached schedule and as noted on 111 M
presence and responsibilities at the job site.If required by the building official,they shall sign in the buildingdepartment approved plans.Adequate notice shall be provided so the special inspector COMMUNITY DEVELOPMENT DEPARTMENT 40004
�t/t
P pr with p aqua provi P P
on the appropriate form posted with the building permit. has time to become familiar with the project. `'�,,41 SMOKE ALARMS AND
2. Observe assigned work.The special inspector shall observe assigned work for conformance with 2. Provide access to approved plans.The contractor is responsible for providing the special BUILDING PERMIT COVERSHEET Y CARBON MONOXIDE
the buildingdepartment approved(stamped)designdrawings,specifications,and applicable inspector access to approved plans. DETECTORS REQUIRED
P of the ( P ) g P PP CITY Of ASP:
workmanship provisions of the IntetTtational Building Code.Architect\engineer-reviewed shop 3. Retain special inspection records.Upon request,the contractor is also responsible for retaining \.. , THROUGHOUT DWELLING
drawings may be used only as an aid to inspection. at the job site,all special inspection records completed by the special inspector. UNIT PER CITY OF ASPEN
E. Inspection of Fabricators: PROPERTY INFORMATION
For continuous special-inspection,the special inspector shall be on site at all times observing the 1. Fabrication of structural assemblies and members.Where fabrication of structural load-bearing — MUNICIPAL CODE 8.15
work requiring special inspection.Periodic inspections,if any,must have prior approval based on members and assemblies is being performed on the premises of a fabricator's shop,IBC Section ADDRESS: 320 E HYMAN AVE UNIT:
a separate written plan reviewed and approved by the building department and the engineer or 1704.2 shall require special inspection of the fabricated items. PARCEL ID: 273707338851 LEGAL DESCRIPTION: CITY AND TOWNSITE OF ASPEN
architect of record. 2. Fabrication and implementation procedures.The special inspector shall verify that the OWNER: CITY OF ASPEN
3. Report nonconforming items.The special inspector shall bring nonconforming items to the fabricator maintains detailed fabrication and quality control procedures that provide a basis for PERMIT CONTRACTOR: ASPEN CONSTRUCTORS INC
immediate attention of the contractor and note all such items in the daily report.If any item is not inspection control of the workmanship and the fabricator's ability to conform to approved
resolved in a timely manner or is about to be incorporated in the work,the special inspector shall construction documents and reference standards.The special inspector shall review the procedures — It should be known that this review shall
peens pee
immediately notify the building department by telephone or in person,notify the engineer or for completeness and adrelative to code requirements for fabricator's scopeof work. not relieve the applicant of their
p adequacy equiremen
architect,and post a discrepancy notice. F. Approved Fabricator Responsibilities: DESCMPTION OF WORK Structural steel modifications and new electrical circuits to accommodate new Wheeler Opera House theater responsibility to comply with the
4. Provide timely reports.The special inspector shall complete written inspection reports for each 1. Fabrication exempt inspections.Special inspections are not required where work is done on the rigging hoists requirements of the City of Aspen
inspection visit and provide the reports on a timely basis determined by the building official.The premise of a fabricator registered and approved to perform such work without special inspection. Municipal Code.Pursuant to
special inspector or inspection agency shall furnish these reports directly to the building official, If work is done on site that requires special inspection,special inspection will be required. Sec.26.104.050,04.050,any permit Ora roves
engineer or architect of record,and others as designated.[IBC Sec.1704.1.2]These reports should 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written y pp pcedua control manuals p
l
be organized on a daily format and may be submitted weekly at the option of the building official. procedural and quality and die auditing of fabricationpractices byissued in error or otherwise not in
These reports should include: ppre periodic g an
approved special inspection agency. USE OF BUILDING Commercial FIRE SPRINKLER REQUIRED? Yes conformity with the requirements of this
a. Description of daily inspections and tests made with applicable locations, 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator shall submit _ Title,shall be void.Similarly,any permit
b. Listing of nonconforming items, certificate of compliance to the building official stating that the work was performed in accordance or approval issued in reliance upon or
c. Report on how nonconforming items were resolved or unresolved as applicable, with the approved construction documents. CLASS OF WORE Commercial FIRE SPRINKLER TYPE NFPA 13
d. Itemized changes authorized by the architect,engineer,and building official if as a result of,a materially false
not included in nonconforming items - - - statement or representation made in
5. Provide Final Inspection Report.The special inspector shall submit a written final report REQUIRED SPECIAL MO-Strength B011ing;Structural the process of obtaining the permit or
documenting required special inspections and correction of my discrepancies noted in the BUILDING TYPE(IRC) INSPECTIONS Steel Welding development approval shall,likewise,
inspections prior to the final building inspection.
be void.Any person having received a
RECEIVED RECEIVED CONSTRUCTION TYPE IM ENERGY CODE COMPLIANCE void or voidable permit or approval
shall not be relieved from having to
04/11/2024 04/11/2024 WORK CHANGES BUILDING comply with all applicable terms and
DocuSign Envelope ID:D3935337-331E-4ACGA55E-F66BEOCC74A9 OCCUPANCY GROUP(IBC) A-1 Na conditions of this Title and the City shall
FOOTPRINT?
130 south Galena Street Aspen.CO81611-,975 I F:970.920.5000 I 1:970.920.5197 I a it yofaspa nu om ASPEN Do south Galena StreetAspen.CO 8,411-,o75IP:970.920.5000 I F:970.920.5197 I ci t sofasra n.com ASPEN not be estopped from fully enforcing
BUILDINGDEPARTMENT BUILDINGDEPARTMENT same.
COO(EDITIONS 20211BC TOTAL SPA SOFT.
F
•
OTHER CODE EDITIONSTOTAL SNOWMELT SOFT. PPECIAL INSPECTION REQUIRED:
G. Building Department Responsibilities: . -
1. Approve special-inspection program.The building department shall approve all special -Structural steel welding:Field&Shop
inspectors and special-inspection requirements. HISTORIC PROPERTY? Yes TOTAL POOL SOOT. -High strength bolting
2. Enforce special inspection.Work requiring special inspection and the building inspector shall
monitor the performance of special inspectors.His/Her approval,in addition to that of the special
inspector,must be obtained prior to placement of concrete,covering of structural steel,or other span/i 1704.Inspectorsp I required per that copy IyC
similar materials. FIRE SPRINKLER EXISTING? Yes section to verify of
3. Review inspection reports.The building official should review special-inspection progress and — agreement for inspection program to be on
final reports. the job site poor to performing any
4. Perform fmal inspection.The building official should perform the final inspection and approval
for a project[IBC Sec.109.3.1]after the final special-inspection report has been reviewed and inspections.A copy of all Special Inspector
approved field reports to be on the job site for
inspectors'review if requested.Failure to
comply may result In denial of Inspection.
Project Address:320 E Hyman Ave,Aspen,CO 81611 Permit Number: 0015-2015-BOOM
ACKNOWLEDGMENTS
I have read and agree to comply with the conditions of this agreement.
cTLlThornpson,Inc. Baton. `� Ryan Barbone 2/8/2024 mamonefaN,anpson.mm
Special Inspection Signature Printed Name Date Email
Agency**.
CityOwner*
of Aspen i� Pony Name
vateoza Email
Martin/Martin Nicole E.Lane,PE 02/09/2024 nlane@martinmartin.com
Design Professional in Signature Printed Name Date Email
Responsible Charge** d
Aspen Censtrucrors Mike Bassi 2...e- z I "rere"R'enrmmevm cam
Contractor Signatud Printed Name Date Email
Approved Signature Printed Name Date Email
Fabricator*** [—Vat._
a a.a er:
Peak Metals l'0.u'CIfdLAS' Dan Capehart 2/8/2024 den@peakmetaisco.com
Inspected Signature r_ Printed Name Date Email
Fabricator*** egg
City of Aspen Building Al� El
Nick Thompson 6/21/24 nick.thompson@aspen.gov _1 i
Department: Signature Printed Name Date Email
06/21/2024
•See a list of who may sign as the owner en page 2. Nepnn,u..
GUMPLANCe
••The Design Pmf ioml in Raiaeae Ne Charge is not required to sign if they perform the duties as described m item C above FOR Cat
•••Either the Approved Fabricator m respected Fabricator must sign.If all work is performed in the shop of an Approved Siren.,the Special nickt
Inspection Agency signa0te is not required(no Feld work).