HomeMy WebLinkAboutFile Documents.420 E Durant Ave.0045-2023-BCOM (8) Field Plan Set Must Be Printed In Color �I
APPLICATION ACCEPTED DATE: 2023-08-15 PERMIT NUMBER: 0045-2023-8COM % /',I
1
COMMUNITY DEVELOPMENT DEPARTMENT u4Fj j►1 CITY OF
�ilIt&
BUILDING PERMIT COVERSHEET TT ASPEN
CITY OF ASPEN
PROPERTY INFORMATION
These plans musta ept at the
ADDRESS: 420 E DURANT AVE UNIT:
building site or inspection
PARCEL ID: 273718221851 LEGAL DESCRIPTION: CITY ANDTOWNSITEOFASPEN
OWNER: CITY
OF ASPEN delays may occur.Construction
OW OF
PERMIT CONTRACTOR: shall conform to these plans.All
changes shall be approved by
aliliking official.
DESCRIPTION OF WORK Installation of an overhead electric bus charging boom arm.This includes installation of upgraded utilities and
accessory power cabinets.Replacement and repair of the curb,gutter,and rain garden.
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
USE OF BUILDING Other FIRE SPRINKLER REQUIRED? PLUMBING,MECHANICAL,OR
FIRE SPRINKLER WORK
CLASS OF WORK Commercial FIRE SPRINKLER TYPE
SMOKE ALARMS AND
CARBON MONOXIDE
BUILDING TYPE IIRC) REQUIRED SPECIAL DETECTORS REQUIRED
INSPECTIONS
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
CONSTRUCTION TYPE ENERGY CODE COMPLIANCE
MUNICIPAL CODE 8.15
OCCUPANCY GROUP BBC) Yes
CHANGES BUILDING Yes
FOOTPRINT?
CODE EDITIONS 2021 AC TOTAL SPA SQ.FT. I It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
OTHER CODE EDITIONS TOTAL SNOWMELT SQ.FT.
requirements of the City of Aspen
Municipal Code.Pursuant to
HISTORIC PROPERTY? No TOTAL POOLSQ.FT. Sec.26.104.050,any permit or approval
issued in error or otherwise not in
conformity with the requirements of this
FIRE SPRINKLER EXISTING? Title,shall be void.Similarly,any permit
or approval issued in reliance upon or
as a result of,a materially false
statement or representation made in
the process of obtaining the permit or
development approval shall,likewise,
be void.Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
RECEPTION#.696449,R.$23.00,0.$0.00
OOC CODE:RESOLUTION
Pg 1 of 3,0B/03/2023 at 01:31:10 PM
RESOLUTION#07 Ingrid K.Grueter,Pitkin County,CO Section I:Approval
(SERIES OF 2023) That HPC hereby approves Planned Development Minor Amendment,Minor Development,and Nothing in this approval shall exempt the development order from subsequent reviews and approvals
Commercial Design Review for 420 East Durant Avenue with the following condition: required by this approval of the general rules,regulations and ordinances or the City of Aspen
A RESOLUTION OF THE ASPEN HISTORIC PRESERVATION COMMISSION(HPC) A sample of the cladding material on the charger arms representing the proposed finish will be provided that such reviews and approvals are not inconsistent with this approval.
GRANTING PLANNED DEVELOPMENT MINOR AMENDMENT,MINOR reviewed and approved by HPC staff and monitor prior to purchase of the equipment to ensure that
DEVELOPMENT,AND COMMERCIAL DESIGN REVIEW FOR THE PROPERTY the finish is non-reflective.
LOCATED AT 420 EAST DURANT AVENUE,LOTS K THRU S,BLOCK 90,CITY The approval granted hereby shall be subject to all rights of referendum and judicial review;the
AND TOWNSITE OF ASPEN,COLORADO Section 2:Material Representations period of time permitted by law for the exercise of such rights shall not begin to run until the date of
All material representations and commitments made by the Applicant pursuant to the publication of the notice of final development approval as required under Section 26.304.070(A).
PARCEL ID:2737-182-21-851 development proposal approvals as herein awarded,whether in public hearing or documentation The rights of referendum shall be limited as set forth in the Colorado Constitution and the Aspen
presented before the Community Development Department, the Historic Preservation Home Rule Charter.
WHEREAS,the applicant,The City of Aspen,427 Rio Grande Place,represented by Kyla Commission,or the Aspen City Council are hereby incorporated in such plan development
Smits, Project Manager 1,City of Aspen Engineering Department,has requested HPC approval approvals and the same shall be complied with as if fully set forth herein,unless amended by APPROVED BY THE COMMSSION at its regular meeting on the 12'^day of July,2023.
for Planned Development Minor Amendment,Minor Development,and Commercial Design other specific conditions or an authorized authority.
Review for the property located at 420 East Durant Avenue,Lots K thru S Block 90,;City and
Townsite of Aspen,Colorado;and Section 3:Existing Litigation
This Resolution shall not affect any existing litigation and shall not operate as an abatement of Approved as to Form: Approved as to Content:
WHEREAS,Section 26.415.070 of the Municipal Code states that"no building or structure any action or proceeding now pending under or by virtue of the ordinances repealed or amended
shall be erected,constructed,enlarged,altered,repaired,relocated or improved involving a as herein provided,and the same shall be conducted and concluded under such prior ordinances.
designated historic property or district until plans or sufficient information have been submitted ^-y. /—
to the Community Development Director and approved in accordance with the procedures Section 4:Severabitity � -�'4r'u^'�-? --AIf an section,subsection,sentence,clause, hrase,or rtion of this Resolution is for an reason Katharine Jo n,Assistant City Attorney Roger foyer,Acling
established for their review;"and held invalid or unconstitutional in a court of competent jurisdiction, such portion shall be
WHEREAS,for approval of Planned Development Amendments,the application shall meet the deemed a separate,distinct and independent provision and shall not affect the validity of the ATTEST:
requirements of Aspen Municipal Code Section 26.445.110, Planned Development Minor remaining portions thereof.
Amendment to a Detailed Review approval;and
Section 5:Vested Rights _ aL
WHEREAS,for Minor Development Review,the HPC must review the application,a staff The development approvals granted herein shall constitute a site-specific development plan vested tIt,,
analysis report and the evidence presented at a hearing to determine the project's conformance for a period of three(3)years from the date of issuance of a development order.However,any AY
with the City of Aspen Historic Preservation Design Guidelines per Section 26.415.070.0 of the failure to abide by any of the terms and conditions attendant to this approval shall result in the Nicole Henning,City—Cle1/4
rk
Municipal Code and other applicable Code Sections. The HPC may approve,disapprove, forfeiture of said vested property rights.Unless otherwise exempted or extended,failure to properly ✓
approve with conditions or continue the application to obtain additional information necessary to record all plats and agreements required to be recorded,as specified herein,within 180 days of the
make a decision to approve or deny;and effective date of the development order shall also result in the forfeiture of said vested property
rights and shall render the development order void within the meaning of Section 26.104.050(Void
WHEREAS, for approval of Commercial Design Review, the application shall meet the permits).Zoning that is not part of the approved site-specific development plan shall not result in the •
requirements of Aspen Municipal Code Section 26.412.040,Standards applicable to all projects creation of a vested property right.
requiring Commercial Design Review;and
No later than fourteen(14)days following final approval of all requisite reviews necessary to obtain
WHEREAS, Community Development Department staff reviewed the application for a development order as set forth in this Ordinance,the City Clerk shall cause to be published in a FitakViliEWIEDI
compliance with applicable review standards and recommended approval with conditions;and newspaper of general circulation within the jurisdictional boundaries of the City of Aspen,a notice
advising the general public of the approval of a site specific development plan and creation of a 09/08/2023 J
WHEREAS,HPC reviewed the project on July 12,2023.HPC considered the application,the vested property right pursuant to this Title.Such notice shall be substantially in the following form:
FORCeI
staff memo and public comment,and found the proposal consistent with the review standards lu s tJt fUNlCE
s tinh
and granted approval as proposed by a vote of five to zero(5—0). Notice is hereby given to the general public of the approval of a site specific development plan,and
the creation of a vested property right,valid for a period of three(3)years,pursuant to the Land Use
NOW,THEREFORE,BE IT RESOLVED: C.,rle of the City of Aspen and Title 24,Article 68,Colorado Revised Statutes,pertaining to the /'► [[[���} i� ggg���
following described property:420 East Durant Avenue. RECEIVED �f Y 1 1
RECEIVED RECEIVEDu � U
HPC Resolution#07,Series of 2023 HPC Resolution#07,Series of 2023 luis
Page 1 of1n/11/2 02 3 Page 2 of(8/11/2023 HPC Resolution#07,Series of 2023 p
Page 3.P9/11/2023 08/16/2023
ASPEN ASPEN
BUILDING DEPARTMENT BUILDING DEPARTMENT ASPEN ZONING
BUILDING DEPARTMENT