HomeMy WebLinkAboutFile Documents.315 E Hyman Ave.0011-2023-BCOM (42) Field Plan Set Must Be Printed In Color 11►�
,4, 4/00
44i10 READ THIS OR FAIL YOUR INSPECTION! ',I00
SI1i Furred&Dropped Ceilings,Soffits,and Walls Ir
CITY OFF ASPEN B. Owner Responsibilities: 20015 IBC 803.13 CITY OF
1. The project owner,an agent of the owner,or the design professional in responsible charge acting This applies to the attachment of finishes or furring to any ASPEN
SPECIAL INSPECTION AND TESTING AGREEMENT as the owner's agent,is responsible for employing special-inspection services.The special assemblies that are required to be either fire-rated or
inspector/agency shall not be in the employ of the contractor,subcontractor or material supplier. G. Building DO rimeB Respomlb8ltlese non-combustible and is separate from the fire-rated
This form is required for projects needing special inspection and/or testing per Chapter 17 of the International [IBC Sec 1704.1]In case of an owner/contractor,the special inspector\agency shall be employed assembly requirement.
I. Approve special-inspection program.The building department approve l snail all special
Building Code(IBC). as specified by the building official. pCOI
315 East Hyman Street,Aspen CO 81611 0011-2023-BCOM C. Design Professional in Responsible Charge Responsibilities: inspectors and special-inspection requirements. ��
:. Enforcer I)Inspection.work l inspection and the inspector Walls,Ceilings&Soffits:If furred 1%inches or Theseplans muse De Ice tat the
Project Address: Permit Number: Design Professional in Responsible Charge definition:An individual who is registered or licensed to practice their speck) pee'on. requiring specie pe g inspec g p
g j p g fin? prat monitor the performance of special inspectors.His/Her approval,in addition to that of the special
BEFORE A PERMIT CAN BE ISSUED:The owner,or the des? professional in res hie charge,actin respective design profession as defined by the statutory requirements of the professional registration laws of the state or 4 Fill do one of the following: building site or inspection
design pro puns? gas inspector,mug be obtained prior to placement of concrete,covering of structural steel,or other
the owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing jurisdiction in which the project is to be constructed;who hengaged by the owner to review and coordinate certain similar materials. 4.Fill spaces with ClassAmateriaL delaysoccur.Construction
Schedule,including the required acknowledgments.Apre-construction conference with the parties involved maybe aspens of the project,as determined by the building official,for compatibility with the design of the building or Y may
structure. 3. Review inspection reports.The budding official should review special-inspunon progress and S.Fill spaces with inorganic or non-combustible material. shall conform to these plans.All
required to review the special-inspection requirements and procedures. 1. Prepare statement of special inspections.The registered design professional in responsible final reports. 6.Fire block 8 feet in all directions.
APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the projects for charge shall prepare a statement of special inspections in accordance with IBC Section 1705 for 4. Perform final inspection.The building official should perform the final inspection and approval changes shall be approved by
which theyde special inspections.Special inspectors shall be approved b the building department to submittal by the applicant.The statement of special inspections shall identify the following: for a project[IBC Sec.I o4.3.q seer the final special-inspection repot.has been reviewed and In official.
provi p sp peci p pprov y g pa ttmen prior approvd Walls:If set out(furred)greater than 1'/.inches, 9
performing any duties.Special inspectors shall submit their qualifications and are subject to personal interviews for a. The materials,systems,components and work required to have special inspection or
pre-qualification.Special inspectors shall display approved identification,as stipulated by the building official, testing by the building official or by the registered design professional responsible for do one of the following:
when performing the function of special inspector. each portion of the work. 4.Use a Class A finish material(such as drywall).
b. The type and extent of each special inspection. 5.Use non-combustible framing. SEPARATE PERMITS ARE
Special inspection and testing shall meet the minimum requirements of the International Building Code Section c Thetypeand extent of each test.
1704.The followingconditions arc also applicable: 6.Protect both sides with fire sprinklers. REQUIRED FOR ELECTRICAL,
PP d. For each type of special inspection,identification as to whether it will be continuous 315 East Hyman Ave,Aspen,CO e1811 0011-2023-BCOM
ins inspection a I inspection.
Propel Address: Permit Number: PLUMBING,MECHANICAL,OR
A. Special Inspector Responsibilities: specialp periodic special;rasp Ceilings&Soffits:If dropped(furred)greater
D. Contractor Responsibilities: FIRE SPRINKLER WORK
I. Signify presence at job site.Special inspectors should notify contractor personnel of their 1. Notifythe special inspector.The contractor is responsible for not? the special inspector or ACIQ4 RENTS than 1 a/s Inches:
pee' spec p notifying p pe
presence and responsibilities at the job site.If required by the building official,they shall sign in din individual inspections for items listed on the attached schedule and as noted on 1 have a to c ly with the condition of this agreement. Framing members,hangers,and other assembly
on then.appropriate formposted with the buildingt. the
buidinar gin p g SMOKE ALARMS AND
PP P Pei th building depamnemt approved plans.Adequate notice shall be provided so the special inspector (�, Q)/�C,Z3 members must be non-combustible.You may not CARBON MONOXIDE
2. Observe assigned work.The special inspector shall observe assigned work for conformance with has time to become familiar with the project. �/ /`coy
g pe p gnuse wood.
the 2. Provide access t0 approved lens.The contractor is responsible for providing then special DETECTORS REQUIRED
workmanship
ntapproved(stomped)design drawings,Code.
Architect.specifications,andapplicable pP P P P g P n Type III and V construction only,you may use fire Q
Special Inspection Primed Name Date Email YP Y Y Y
workmanship provisions of the International Building Code.Arehitectlenginroe reviewed shop inspector access to approved plans. THROUGHOUT DWELLING
drawings maybe Used onlyas an aid to inspection. 3. Retain special inspection records.Upon request,the contractor is also responsible for retaining, AB r•'• /,/�-h��1�/ retardant treated wood or non-combustible framing.
gp iztCe"'---_-4/ _ UNIT PER CITY OF ASPEN
at hejob sae,auspeeiaunspectionrecords completed by he special inspector. GravityHauSAspen Grad Huff 08/17/23 giddy@gravityhaus.eom
For continuous special-inspection,the special inspector shall be on site at all limes observing the E. Inspection of Fabricators Y Ma/ 'I MUNICIPAL CODE 8.15
work requiring special inspection.Periodic inspections,if any,must have prior approval based on 1. Fabrication of structural assemblies and members.Where fabrication of structural load-bearing Owner. Signature Printed Name Date Email ► A ....
separate written plan reviewed and approved by the building depamnent and the engineer or members and assemblies is being performed on the premises of a fabricator's shop,IBC Section OZ Architecture aams�-� Rebecca Stone 8/8/2023 bstmmQozmclacom
architect of record. 1704.2 shall require special inspection of the fabricated items. Design Professional in Sigmnve• -- Primed Name Date Email J III
—
3. Report nonconforming items.The special inspector shall bring nonconforming items to the 2. Fabrication and implementation procedures.The special inspector shall verify that the Responsible Charge•• -�—
immediate attention of the contractor and note all such items in the daily report.If any item is not fabricator maintains detailed fabrication and quality control procedures that provide a basis for GF Woods Q.Pw-F. = GregWoods 8/8/2023 r It should be known that this review shall
resolved in a timely manner or is about to be incorporated in the work,the special inspector shall inspection control of the workmanship and the fabricator's ability to conform to approved greg@gfwoods.com
immediately notify the building department by telephone or in person,notify the engineer or construction documents and reference standards.The special inspector shall review the procedures Contractor Signature Printed Name Date Email not relieve the applicant of their
architect'and post a discrepancy notice. for completeness and adequacy relative to code requirements for fabricator's scope of work. Myers&Company area _ Dennis Clemons 8/09/2023 delermmarniresseMo.asm 20" gr91111.11111 a Requirements for responsibility to comply with the
4. Provide timely reports.The special inspector shall complete written inspection reports for each F. Approved Fabricator Responsibilities: '-- Type of Construction: VA requirements of the City of Aspen
inspection visit and provide the reports on a timely basis determined by the building official.The 1. Fabrication exempt inspections.Special inspections are not required where work is done on the Approved Signature Printed Name Date Email PrimaryStructural Frame: 1 hr
inspector or insshall furnish thesereports directlyto the buildingofficial, P p P pFabricator...
Municipal Code.Pursuant to
specialpee inspection agencypremise ofa fabricator registered and approved to perform such work without special inspection. (columns,beams,girders,etc) Sec.26.104.050,any permit or approval
engineer or architect of record,and others as designated.[IBC Sec.1704.1.2]These reports should If work is done on site that requires special inspection,special inspection will be required. 1
be organized on a daily format and may be submitted weekly at the option of the building official. 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written Exterior Bearing Walls: hr issued in error e otherwise not s f
pcedur pprova p Impacted Signiors Printed Date Entail Interior Bearing Walls: 1 fir
s
These reportasli5Id include: dmalo d quality SrImay manuals periodic of s byconformity ll be void.
Similarly,
any petit
procedural q pe con perio g o praten Fabricator...
a. Descriptiomofdailyiaspectiomsandteststnadewithapplicablelocatioms, aspecial ms inspection erne Floors/Ceilings:i fir Title,shall be void.Similar) , permit approvep agency. y p
b. Listing of nonconforming items, 3. Completion of fabrication.Upon completion of fabrication,the d fabricator shall submit City t Build? Nick Thompson 9/13/23 Roof: 1 fir
c. Report en hew nonconforming items were resolved or unresolved as applicable, P P Papproved ry o Aspen or approval issued in reliance upon or
Po 8 PP certificateof compliance to the building official stating that the work was performed imawordance Department: Signature Primed Name Date Email Unless noted otherwise for occupancy separation or fire materiallyasa result of,afalse
d. Itemized changes authorized by the architect,engineer,and building official if with the approved construction documents.
not included in nonconforming items 'Serafpafwhomayep,Nthenu manppp: separation distance. statement or representation made in
5. Provide Final Inspection Report. specialThe inspector shall submit a written final report 'rite Dap,Pro(ba.Imerspro,mk Chaos a am require to saw d they parent.ire dunes a&AthW„i1.mCshow the process of obtainingthe permit or
documenting ds special inspections correction discrepancies Frierho ApprmadFabnatoralvrp0aO iraterm,nepl.Pall work,.pMormdin the shop oem rerovedFabriramr,the Speeul
g required pecia pee y p L.prroneAenncragoeureiratrepedtaaGoldOa FIRE RATED HATS REQUIRED development approval shall,likewise,
inspections prior to the final building inspection. Where floor/ceiling or roof/ceiling be void.Any person having received a
RECEIVED assemblies are required to have a void or voidable permit or approval
RECEIVED RECEIVED fire-resistive rating,recessed fixtures shall
be shall not be relieved from having to
08/25/2023 installed such that the required fie
resistance will not be reduced(IBC 714.4.2) comply with all applicable terms and
08/25/2023 08/25/2023 conditions of this Title and the City shall
130 Soutl.Galena Street Aspen CO 8161-975 I P.970.920.5000I 2,970.920.5197 I new le spen.r°,n ASPEN not be•stopped from fully enforcing
BUILDING DEPARTMENT too South De lens.Street Aspen CO816111,51P.970.920.5000IF,970.920.5197I,Ryas.pen.rom ASPEN
ASPEN same.
BUILDINGDEPARTMENT BUILDINGDEPARTMENT CEILING RADIATION DAMPERS REQUIRE
Ducts and air transfer openings penetrating the ceiling D ALL OUTDOOR L
fire rated ceiling assembly must be protected with a listed MUST COMPLY WITH
ceiling radiation damper.This includes bathroom exhaust
fans.(IBC 717.6.2) THE CITY OF ASPEN LIGHTING CODE
SECTION 26.575.150
FIRE DAMPERS REQUIRED
Ducts and air transfer openings in fire rrr"""""" �p�{
resistive floor/ceiling or roof/ceiling [eV/1 6 Ll
assemblies shall be protected with approved bobn
APPLICATION ACCEPTED DATE: 2023-04-10 PERMIT NUMBER: 0011-I023-BCOM fire dampers installed in accordance with
USE OF BUILDING Commercial FIRE SPRINKLER REQUIRED? Yea their listing(IBC 717.5.2&717.5.4) 09/14/2023
ZONING
COMMUNITY DEVELOPMENT DEPARTMENT 9 C1ASS OF WORK Commercial FIRE SPRINKLER TYPE NEPA13
i0 — ---BUILDING PERMIT COVERSHEET External Energy Use Approved
HIDING TYPE(IRO
REQUIRED SPECIAL
O1YOFABPBI INSPECTIONS ❑ RREMP x❑ CREMP
PROPERTY INFORMATION cDxSmucnonTYPE VA ENERGY CODE COMPaAeCE COMOterkuA Alternative No operation of coffee shop or existing PERMIT#: 0011-2023-BOOM DATE: 9/25/23
ADDRESS 315E HYMAN AVE 100 UNIT:
PARCEL ID: 315EAST7100 LEGAL DESCRIPTION: WHEELER SQUARE FOOTPRINT?
CHANGES BUILDING restaurant during construction.OCCUPANCY GROUP(IBC) A-2:B:M Yu
OWNER: 315 EAST HYMAN AVENUE HOLDINGS LLC FDOTPmNrr SNOWMELT: 707 NEW,1887 TO REMAIN it-,i
��jj8i s[`}}Yjjl!`�jP�'rp���PERMIT CONTRACTOR: GF WOODS CONSTRUCTION INC — — POOL: N/A ILA V V V LE„COO(EDITIONS 20151EBC TOTAL SPA SO,FT. N/A JJJESPA: 09/21/2023
OEscrirnlON OF WORK RENOVATION OF EXISTING BUILDING AS DESCRIBED BELOW: OTHER CODE EDITIONS TOTAL SNOWMELT SOFT. 2,594 REMP SHEET: Ao.11 FORCOMUMPLINICa
MINIMUM BOILER AFUE: 75% nickt
BASEMENT HISTORIC PROPERTY? No TOTAL POOL SCUT. OFFSET: N/A
-REMOVE ALL EXISTING MECHANICAL EQUIPMENT AND REPLACE WITH NEW
FIRE SPRINKLER EKISnNG? Yes REVIEWED BY: NT
LOWER LEVEL SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REG'S.
Al snowmelt systems shall meet the following:
-RENOVATE EXISTING KITCHEN REPLACING EQUIPMENT 1 FOR 1 AS REQUIRED -Any portions in the Right of Way must be on a separate zone.A ROW
permit and Permanent Encroachment License are required. FIRE
-ADD NEW PLATING AREA TO WEST OF EXISTING KDCHEN. -R10 insulation shall be installed under the area to be snow melted or RS
insulation shall be installed under and at the slab edges.(Ordinance 11
-ADD NEW RETAIL SPACE Series 2011)
To verify fenestration U-factors the following is -Automaticcontrolsinstalledforsystemshutofwhenpavement SPRINKLERS
-MAKER LONG-TERM LOCKER STORAGE f temperature is above 50°F and no precipitation is falling.(2009 IECC
-NEW FITNESS AREA Sec.-Automatic
&5 manual
c
REQUIRED PRIOR TO GLAZING INSPECTION: Sec.40.8&50an.4.5) Vnla installed for system shut off when outdoor REQUIRED
-NEW LOCKER AREA WITH ecsreaOMS,DAY LOCKERS,DRY SAUNA temperature is above 40°F.(2009 IECC Sec.403.8&503.2.4.5)
CITY OF ASPEN 12022 427 RIO GRANDE PL I ASPEN,CO -Inspection by testing hydrostatically at 1''A times max system design
-NEW RESTAURANT AND BAR SPACE. pressure,but not lesst an 100psi,for 15minutes. Sec.
New Exterior Doors: 208"
UPPER LEVEL A simulation by an NFRC—accredited lab in accordance with
-EXISTING COFFEE SHOP IN WESTERN WING TO REMAIN AS IS SPECIAL INSPECTION REQUIRED:
-EXISTING NFRC-100 has been approved. Verification labels must be
-Structural steel welding:Field&Shop
-REWORK RAMP TO MEET ACCESSIBILITY CODE FOR ACCESSIBLE ROUTE affixed to the door units by an accredited independent -High strength bolting
inspection agency or a certificate, affidavit or other evidence -Items listed on Structural sheet SO
ROOF from the manufacturer confirming compliance with the Special inspection is required per 2015 IBC
-ADD NEW ROOF TOP EQUIPMENT AND DUCTS TO PROVIDE REQUIRED HEAT AND VENTILATION FOR THE section 1704.Inspector to verify that copy of
SPACES. NFRC-100 simulation or testing must be provided for agreement for inspection program to be on
-NEW ROOF AND INSULATION approval prior to inspection. the job site prior to performing any
inspections.A copy of all Special Inspector
field reports to be on the job site for
inspectors'review if requested.Failure to
comply may result in denial of inspection.
&e Section Section
COMcheck Software Version 4.1.5.5 COMcheck Software Version 4.1.5.5 ewewi
41 Footing/foundation Impectlien Myra. Comments/Assumptions a Plumbing ...erection Conn*, Comments/Assumptions If Numbing rouglpin Inspection Complies? Comments/Assumptions
if .113 is Req3D
Mechanical Compliance Certificate r1;64fil Inspection Checklist
Ca04.5.1.to pipe length and volume ,Does Not water trom a heated-water supply l,Does Not
Eflergy COCIet 2015 IECC protection„„em„ove auto„atir ,,,,,,,,,,m,
controls install.. 111_6P Pipe back to the heated-water source
through a cold-water suppiv pj pe 0.,ObSery aMe
ONot Appltable ONot Applicable demand recirculation water system. E,R0t.OP'icah.RequifeMentS,100.040 Were addreSSed direCtly in the COMCDeCk Mflware
Project Information TeXt In the.COMMents/ASSUMptiOne COIUMn IS provid.by the user in the COMMeck Requirements screen.For emh C404.5. Heated water sunpply r ;g conforms ElComplies ExceptIon:Requirement does.aPPO. Pumps within Mis system have
controls that start the puma uPon
Energy Code: 2015.IECC req.....the USer CertifieS Mat a Cade reqUireMent Will be met and how Mat is documented.or that an exception Additional Comments/Assumptions: C404.5.1.to pipe length a d vo um ODoes NM receiving a signal from the action of a
IS Wing claimed.Where complianCe IS Itemlred In a separate table,a reference tO that table Is provided. C404.53 requirements.Refer tO section details...,...,,,,,,e tner Ofa Mrture Or appliance and
Project Title: GraVgy HaUS
1.1' limits Me temperature Of the water
Aspen.COlonado ameba ORM Applicable entering the cold-water piaing to
Omuta Zone: swen a.m. camp..." Gmmentabtroumptlene
ProAct type Maranon Sr arat.133 C404.5.-fleeted water supply ng confer.OComplies excmatlorn Requirement does not apptY.
C404.S.1.10 p.pe length and vOlume CID... C4.1.2 Water diStnhutiOn SyStem that pumps EIC empties e.ceptlen:Notooroottn000tts.+POO:
C103.2 Plans..specifications.and/or ElComplies Requirement will be met Ca04.5.2 requirements.Refer to Section details Intel, water from a heated.water Sopa, l,Does Not
(PUP calculations provide all infomution Doom Not IPLOP 'Prot Observable pipe back to the heated-water source,...,..,,,,,,,,,,...
L.........., Owner/Agent: c., ,,,,ewo,,: "
with which compliance can be
determined for the merhammi R.W. 00. Ottot nankable through a cold.water supply pipe is a ......
demand recirtulatiOn water SySteM. .Rcit ARP...
A:Peel?O'nal1 Studio Lemonade
wheat Ridge.CO
M Mad non St.104 systems and equiprnent and
document where exceptions to Me -.'rit ROPlicable
=leZ 7117"mm o'r,:":„: ""mr'"'"`"'"''''''' Rumps within this system have
contr....start Me PumP°P.^
Denver,CO
Standan are M..-Mad requirements.Refer to sectbn denils.D.,ot.,..„.,,,. reCeiving a signal frOm the aCtiOn Of a
calculations per acceptable I user of a fixture or appliance and
engineering standards and Omit Applicable imits tbe temPenah.ire of Me water
Mechanical Systeme List ha.... eniering the midwater piping to
C103.2 Plans.specifications.and/or °Compiles Requirement Mil be met C404.6.1,Automatic time sMtches installed to [I/Complies RemWment*III be met 10a,
.....,47e047/Ty.a Description lint31` calculations provide all infomution OEMs Not GM.r2 automatically swi.h off the DM.NM 0464.7 Water distribution system that pumps DCornalles gacentlant Requirement does n.egoar.
1 RiP.1.2.341-7.9(SPAS 210el, with which compliance can be IPL3 ater recirculating Mewed.System or heat pivgp water from a heated•wamr moply ONoes mot
Pi.d
pare. OPAL ObServable etermin.for Me service w ONot Observable baCk to the heated.water SOurCe...
Fleet no:1 ea.-Duct Furnace.Gas.DaPeolY.MO Mi. Drat Applicade through a coldwater supply one is a uNot Observable
heating:,stem:.na equipment and I.I.APW'...
proposed Molar.,.80.009,Ec,Required Efficiency;80.00 9,,Ec demand recirculation water system. ON.AcpliCable
document where exceptions to the Pumps that circulate:rater between a aornplies except.:Requirernant dots n.illaPA:
Comm t each•Single Perham DX DM.Comic!,.41 kWh.NoCcoled Condone.Pir EconornIzer standard are claimed.Hot water heater aW storage taM have controls Omses Not rumps within this system have
Proposed EDP...14.00 SEER.Required Moloney:14.00 SEER PAPA Sized per manufaCturer, that limit operation from startup to m))0t ot,,,,y)ye controls that start the pr.tr.
sizing guide. .4 5 minutes after end of heating 5Not,,,,,..,,,‘... receiving a signal from the action of a
Cyde. user Of a fixture or appliance and
I /111..516ingle gen. Addittonal Commentailtssumptions: • limits Me temperature of the water
Purnpathat circulate water between a DCOmplieS gamptlign:Requircentradoes mt apply.
...Hoy I cam r Met Fume..Des.Cape. ..Et. heater a.storage tank have controls Dams Not entering me cold.water PPM.
Proposed Efficiency•00 00%Es.ReoiWed Efficiency:00.00%EC .operation from startup to
ppop,f pa,gin4,.p.,,,,n x,jn,.c,,,.,,,,.“,Bt,p.,..,,,,,,,condone...q,noonor„lee, =Min..afte.r end of heating DN"''''"v". AddltIonal Commeotsfamoniations:
Proposed Efficiency.14 00 SEER.Required Efeclency,14.00 SEER nvn,n. Dia/VOA.. .
Fan System,nspecified Pumps that circulate water between a la.ornplies ...MOM Requirement does not all..
heater and storage tank have controls awes Not
1 RW.8.15ingle Zone, that lira°per..from stanup to
nesting i ea.•Duel Furnace.Gas.Capecily.224 IcStuib ..,..,rn,npfps mg,rnp a,...pap, Drat Observable
PrOpOSed EffiCiOn,.80 PA E.0.epUreel Efficiency:00.00%Ec .. Elliot Applicable
Cooling,each-Single Pachace DX Dolt Caries,el FEW,R.Incoakd condenser.sir cr economizer Pumps that cinuiete nate.between a OComplies Nocopeoot Requirement does not ea.,
Propos.Meier,.14 OD SER.Required Efflele,11.00 EER•12.0 ISER heater a.storage tank have controls Dams Not
ran swim,:Ontiem4M mate.operation from startup to ,--,...,
2 Water Healer I, er 5 minutes OW end of heating `-'.........
cYc.e. Elliot Applicable
Gas Mrs.Water neater.Caned,:119 gallons.Input Ratirtg:00010401 wt Circule.Pume Water distribution system that pumps Ocomplies Exception:Requirement does not aPOO.
Proposed Efficiency 82.00 ..kited efficiency:WOO%Et water nom a heatedwater PP ,Does NM
PlPe beck to the heat.-water source...
th h a cold-water supplv PiPe is a unot Observable
Meehan.COMpllantO Statikillent demand recirculation water system. ,R0t Mr...
Pumps within this system have
Cornsdience St element 11.propos.mechanical attention pro).represented In this document is consistent with the building
controls that son the pumn KM
eeegre=770rr1==letrleggl=k=r7:.lerSleaenedet=lrArrarr=41C:=teXe rreee reCeiving a signal from ihe action of a
user.a fixture or appliance and
requirements list..the inspection Checklist.
IMM the temperature of ra water
Alex Valdez Partner .rger. i.laichg JUN 19,2023 entering the cold.water piping to 1
Dime•Title Signature Dete
[1!Nigh Impact Mar 11 Mgledium Impact Mar 21 Mow!tripod rner 3/ I l 1 IMO:toped Mar 11 111,4editon Impel frier 21 Mow impact aim 3) I I li.'0 Ai:WO:Aar 11 Elmedarm lnOreci Mer 3: 11.10400PM..COer A I I 1!nigh Impact Mer 11 ElMedium impact Drier 21 'Mow imp.iller 31 i
Project Tele Gm."lia. Peron dete:03/14/23 Prelectime: Gravity Haus Remrt da.:03/14/23 Project Tele: GM.IlaUS Report date:03/14/P3 Project TM: Gnu,mem !tenor...0114123 pmect nue: Gravity meir RepOrt date:03/1.3
O rita filename:F11R0/2.4/42,033.CD Gnu Mus AsPen P.M....M..Crac...... are 1 of 11 Data Menem.roPro3en0s042/533.442 wee Ham aspen Ph trodminwechanmaKomchect.cor Page 2 of 11 Oata filename PPP...1221033.Grew Mem Aspen Ph inAornhoolochankro comcNooN.coN are 3 el 11 Oa.Menem.:7AP50214090331033-00 Grim limo Aspen PP IIWIrrOXPlecnanical Comcnearoct pato a of 11 Dada filename:POProje400039033-005009 Haw Aspen Mr tootornoomooNonicto comottoduttit P.S. SIP LI
Section sec..
Mechanical Dough.Inst... Con01img Comments/Assumptime • blochankal no/OS mpaction Complies, Grnmeneartssumptgom r Mechanical gough-In inspection Complies, mommemoomeamoem final Inspaction Coe•pliast Cornmems/Assumptions r Final inspection Corootlast Conene.s/Assumptinos
6 Req.., 6 Req.10 6 rillt
01031.6 Thermally ineffective panel surfaces of OComplies E.eePtion,equirement does not aPPlY Enclosed Parl,ing garage ventilation OComplies Exception:Neguirent.does note., Ceer'e'SM rrreiTliregLe=gcreesregemer= Heneteieost e"""eer"re'rereerrerre"rere eeerre Furnish.06.manuals fur twat Occmplies Requirement will be n.. Controls are instaiied t.omit me Ocompiim exception:Requirement does not apPiy-
INE03P sensi.heating panels have ODoes Not has automatic contaminant detection 013ces Not systems within 90 days of system ODoes Nor Mention of a rec....pump On..not
intomoo o-R-3.5. Pressure setpoint reset controls. ,,,,,,,,,,,,,,,,.....See Me mechanic.1 Systems J...veiom. accen.rice. inner.to maintain temomature m a,z,upt mm,ame
ORM Obsegrable storage tank.System return pipe is a
PM
I,Not AptAlcale
Nvac fail systems at design Eton,. mumv.be met.
.2. conM do ncAe.eed allowahle Ppoes uot
sYstem bilD
OM.at design ONot Applicable
' ''''lisf '' "
S'ynSteril bhp.
systems at design
' '''Wirisfe''Mlin'''en'arl":"1;a37 '''''' "
II
1,ConneTt Requirement will be met
r-T,iFz:=7:-
,a;;,,s.rn bhp.atm .at r f a riB,,0,0,,,,,.eg.s. tndctoapec,o,ityotor
C403.2.7 Exhaust Mr energy rem.,on EIComplies ELC.,601%.Re.112111erlt dces no,.1..•
1,4E5,P =Letlrable Ca03.2.71. ,Does Not
O Not observabie
O Not M.N..
Kryclun exhaust systems comply with I:Complies !swept:ea:RequIrernent does na iMPAr
replacement air and conditioned Oooes Not
sumey air iimitawns.and satisfy ,p____,,_
rating requirements and maximum Hz;47=7
e.,...u.Me ollerla.
f4032, liVACr.dlcla:plenums Insulated. ElComplies exception:Requirement doeS nal liPPly•
plenums are installed Does h.
in or under a rap verification maY
ne.to..“.during Fmndation EZ.tt.,.3:7."....
Inspection. o rade Elliot Applicable
0104.2.1 Gas-n.water-Marna equipment I:Complies Requirement will be met.
1.111p inUalled in new builMngs;where a DDoes Not
singular piece°,water.heating
.entire building.Mermal efficiency ElNot gpOicable
or 90 Et.Where multiple pieces of
water-heating equipment serve the
building with combined rating'.
1.000 kSturh.the combined input.
capacity..ighted.average thermal
efficiency,..90 Et.Exclude input
r.ng of equipment In individual
dwelling units a.equipment re 100
latu/h.
Air mitiets a.ttee terminal devices 0Compli. Requirement.be met ,Not MO.a.
• reeeCi=neneteeree=ulated E-m= '-'---'met.
I1Not Observable
Elliot Applicable
Healing and tooling to each gone is OComplies Ile.lirerrient will be met
Controlled by a them-us-tat con.. CDoes Not
MiMmum one humidity cont.device DN0,0*,,e
per installed
humiditicat.n/cenumidification ....Mire.
system.
Wang and coon.to exh zone is DC.M. ....rant rig be rra.
controlled by a Mermostat control. Oboes Not
Minimum one humidity coMr.dev,ce pg.,immetoggin dedicated return pipe or a cold water ON.appiirame
ruPPO Pire.
FX:1 a =='cle'slo'n'anro=n= 9`'L"r= ''''''''''"'-
a pp coy ed ago., DRot Observable
....Mirror
C408.2.3.MVAC equipment has Men tested to OComplies Requirement will be met
ItF1311. eerrere proper Operation. EiDOes Mot
prot Observable
proMpplicable
C400.2.3.MAC...I systems have bmn I:Garages Requirement will be Met.
ttert.to ensure proper oeration. CiDoes Mt
FilOP calibration and adjusttnent Of controls.N.,,,,,.,....... .
3
EVillit-tArvvii n
Fr,09/21/2023 1-1
FORCOOtcOMPIYACE
_. .2.12 Fans have eider,grade MEDI... 0Complies Exception:Single fa.win,motor nameplate norseponerolx have means Mr air balancing. Ortoes Not ,sn,i„..iied ON...a. nickt
°""N't '"°. '+.1'lli' tVgItTrnd=""'"" Hc:Lts, "I'ren*""'"'''''' ON.Observable humidificabonttlehumdification OM.APP...
SyStem. C4.3.2.3.Economizers ha.teen tested to OComplies Requirement will be met.
emote WM.,°Manion. Owes Not •
'n• 't' ONot AC'Obt71=Ne °Not Observable .I..i0Onrame
Heating and roofing to eaM zone is C/Cornplies Requirement will M met. IF1321'
Oro OpMicable Refrigerated display cases.walk. OComplies exception:Requirement does net Nagy. controlled by a thermostat contr.. Dopes Not 074t Observade
C403.2.12 Fans have efficiency grade,FED),.= ElComplies Exception:Single tans with motor nameplate horSepanorof w Duch..operating>3 in water 0Complies Exception:Requirement Noss oattPAAr coolers Cir walk.in freezers served by Ogees NM Minimum one humidity control device puot 0,,,,,..„,pe EINat Applicable
i4117r llcasibantO'on7oTeatIOt: gO Nat a na- column requires air leakage testing. OD.,Nm remote compressors and remote ,,,,,,,..
Doe.In a Per instal. C408.2.4 Preliminary comm.Mning report [[Cl PP Requirement will be m.
hu.idificatimranurnidificabon DRotAPPMeMe mgglf completed end tenned by mlistered.Does Not
of maximum total HIM Of. R.....'... Prot°Movable 4 have fen•ponered ONot applicable
rincnnr71 , , ,n,_ design professional or appro.. oNot a:tunable
tn `-...P011cable 04ot Applicable "..7.,.',ea'n'd:47r°.r'7.Ton'Zt°.... Thennostatic commis haw a 5 ra OCompli. RequireMent will be Met
deadband. lames Not agency.
ONot Applicable
403.2.12 Fans n..efficlency grade WE.... OCOmplieS Exception:Single fans win,meter nan.glate hoesepowerof. Duc.ork openting r3 in.water I:Complies Exception:Requra.......POr systems that comply with Ca03.5.2. Furnish.XVIC asbuilt drawings OComplies Requirement will be met.
IME1171: fie
oMf n.TeVgee==natt tr.:ee%HLINNaaa°r00/04210 Nat N ha. column reputes air lea.,testing. PIZIrOoote sO bNoet nsble Addonal Commets/Assumptions: DMNoAt Oblele r dasof te EDNRooMte sO bnoset
max p empe. mntros .setpont OCm. Requemewbeme O
rvable
MP.....
C403.2.13 linenciosed spa cm that are heated OCompiies Exception:Requirement dces not apPlY. Ductwork operating P3 in.water DC0mplies !eget. Peoulremest does no:ePPAr °eerie,'restrictions. Owes Not
114471P use oniy radiant heat. Opoes Not room requires ..air leakme testing. Dimes Not CINot OtttervaMe rill8.2 b.mr,:inr:nd,..,,,,tn,=,..c Bcom„. Requirement will be rat
01.Observable :Mot Observable .....liceble
lAr.pppop.,,e DM.AnDrable C403.2.4.Each zone equipped with setback OComplies Requirement Mil be met
Faw NVAC equipment eMclency.O... °Complies see toe Ammar.Spreps I.Mg... C403.3 air economisers provided where OComplies Requirement Mil.m. tf trar PerMrrrear'n:Orge=nrer=ere'"'Dee'eM IFM1r r4sternsrre rerre Pee ...."'si7:7:::
O 01es Not [142621, required.meet.requirements for ElDoes Mt Not Observable re.2.e.aZegiToe0
w114
v7gingereysrreeje r ree"" "'e'er"'wi"ee e'er.d.gn cape.),coXrei APPAr . Com Observable DM)Applicade MDIni receipt of Certifica.of occum.Y. Duo,0,,pr.,,r"apy,
014.Observable ventilation controls.bIghlimIt shut or.
O rot ApplIcable IS economiser cent r W.and .-Ntot APO.... GOMA autornatiC Controls:Setback to 55, OCompli. Requitement oiii oe mot ONot NotNicattle
C403.2.0.melt detmtlon,ana diagnostics 0Complles Requirement seill be met. provWe a means to reeve excess Meat,and gate Moor;7.My Mar 2.OM.Mai
outside air during operation. +I.hour occupant ove.e.10.hour .Not ob,..v..
Aoldelonel Commoels/Assomptloest
143113A VirangZreacOna:rte'rtsa.atat'" DNaaa Nat C403.3 Alr eCenomiren provid.where OCOralles Al be in. bactu0 prat Applitade
OHM Obaervable 1.262r required.me.the requirements Mr ClOoes Xot
ONMApplIcable design CapaCrty,control signal.
C403.2.0.Fault deteCtiOn a.diagr.tics °Compiles ...mgr....be met ventilation con...hIgletimit Mut..0..t...... installed on supply and OComplies Eaeptlam Requirement Noss..o0N.
Integrated coonomIger cont..and :Mot Applicable
atali:itaTptan:eveatione."'ss .i,,:::.:F.p..,,....
-• of non-circulating ODoes NM
71.113P:nesItergecOn:reliTerf. " po'Ne0.70:s"erv...'
Pliot Observable
O ra Applicable ee' CINot Applica.
Multiple gone VAVSySterns with DDC OCOmPlieS ...Prom.Requirement MeS...M.
C403.2.6.Demand control ventilation provided si,arnp,. Requirement will be m. a Individual gone 2400 Nave static peoes Not co. Mi piping Insulated in accordance with OP/PP/OP Requirement will be met
1"'"e ::velecITIgy2es'eys'iEfe5ell!icire"e 02700N::rable F.Mire set.nt Met cont.,. .,,,ot.,,,,,me See Me mech..Sy s t a on s vs:f se ve,es IFaSP section details and Table M03.2.10. °Does Ma
1prot Anoka.. plot Observe.
t'ionernoer.auto modulating outside O.:APP.... lalet PoslIcable
h DDC °Compiles ereeptiont Requirement does.....
de Centro,Or design alrfl. oMnrf IdInv:Iii:EI:ni,51:07t tear e statiC ODoes Not
.s. ,..See Me Me nmint Systems..nit.
ONOI Obsenab
0.I a t Apstseble
I I[Nigh Impart(Ter 21 LktMedltan impact Met,/ Moe onNt.c,0*n I 1 I IN,tr..,rnor It Mtoeteurn trope.Mot Z ME.....“... I I 1 I..,,.,,,,t 0*u m.....Imp.Mer 21 MOW Ira.Mar 3) I I,1.4)impact Met 11 1 3 flOotoon,ornpect(Mr. Mee N.P.ct 0.al I I 1 I ieat impact rnor It I 2 IMedicen Impact iller 2) MLow Impact Ater 31 I
Project Tale: GravitY Xa“ Perna Mel 03/14/23 PrOject Mir Gr.... Report..03/54/43 Project Me: Gravity Haus Report date:0..3 Project Mde: Gravity Nays Reran date:03/14/23 AO.Mde: Oravlry Maus Preen date 03/14/23
Data filename FOPrOjed.221.033.00 GraV Melia Aspen Ph IlAdmIMMechanIcall Corncheck.cck Page 6 of 11 Data filename MProjectO.22,033.00 Mao Mus Aspen Ph emornintmetNanitot Corocnooloak P.O. 7 of 11 Data Manama MProje409122,033.00 Gray Haus Aspen Ph IIMIrniralechanical Conocheck.ak Page 107 11 Dan filename,Frgr074091221433-00 Gray Mus Aspen Ph inAcirniNgechanical Conmhecksck Pere 090 11 0..0/lename,FrgrOjeCts‘22103.3-00 Gray Daus Aspen Ph InAdrniMMechanical Comcheck.ak Page 10 Of 11
nCOMcheck Software Version COMcheckWebirif‘t(i COMcheck Software Version COMcheckWeb
Inspection
Energy Code:2015 IECC Checklist Interior Lighting Compliance Certificate
Requirements:100.0%were addressed directly in the COMcheck software �'
Text in the"Comments/Assumptions"column is provided by the user in the COMcheck Requirements screen.For each Project Information ,
requirement,the user certifies that a code requirement will be met and how that is documented,or that an exception
is being claimed.Where compliance is itemized In a separate table,a reference to that table is provided. Energy Code: 2015 IECC
Project Title: Gravity Haus-Aspen
Section Project Type: Alteration
# Plan Review Complies? Comments/Assumptions August 14,2023 This alternate method is acceptable as it meets
6 Req.ID the intent of 2015 IBC section 104.11 and is
C103.2 Plans,specifications,and/or OComplies Requirement will be met. Construction Site: Owner/Agent: Designer/Contractor: equivalent in fire and life safety.
(PR4)t calculations provide all Information ODoes Not 315 Hyman Avenue Carlton Fretwell,P.E.
with which compliance can be ['Not Observable Aspen 81611 Front Range Electrical Engineering
determined for the interior lighting
3333and electrical systems and equipment'['Not Applicable Lake S Wadsworth Blvd D210
Bonnie Muhigirwa 1L °9/2fA03
and document where exceptions to Lakewood Colorado 80227 Chief Building Official lIIVVVJJJ
3039850548
the standard are claimed.Information Carlton@FREEngineer.com Aspen Building Department of Community Development
provided should include interior
427 Rio Grande Place
lighting power calculations,wattage of
bulbs and ballasts,transformers and Aspen,CO 81811
control devices. Allowed Interior Lighting Power (P)970.4292787
Additional Comments/Assumptions: A B C D (E)bonnie muhigirwa@asoen gov
Area Category Floor Area Allowed Allowed
(ft2) Watts/ft2 Watts
RE: Gravity Haus Aspen(0011-2023-BCOM-315 E HYMAN AVE)—Security Gates
1-Fitness(Gymnasium) 2365 0.94 2223
2-Reataurant/Bar(Dining:Bar Lounge/Leisure) 5050 1.01 5100
3-Coworking(Office) 2990 0.82 2452 Dear Ms.Muhigirwa:
4-Retail(Retail) 250 1.26 315
Total Allowed Watts= 10090 As discussed with Nick Thompson,Plan Examiner,and Denis Murray,Plan Examination Manager,
Section Proposed Interior Lighting Power with the City of Aspen Building Department of Community Development on August 1,2023 and
# Rough-In Electrical Inspection complies? comments/Assumptions A B c D E confirmed in email on August 2,2023,there is one Plan Review Comment that we were requested to
C Req.ID
C405.2.1 lighting controls installed to uniformly OComplies Requirement will be met, Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) provide an alternate method request letter per 2015 IBC 104.11.
1E11511 reduce the lighting load by at least ODoes Not Fixture Fixture Watt.
50%. ONot Observable We have multiple locations where security gates are utilized to secure building areas while not in
fitness 1 p 1:C2:Ceiling 2365 sc ft 1 operation and when access through the spaces is required for the existingegress requirements.
ONot Applicable LED 1 copy 1:C2: Light:Other: 1 4 25 100 p g p q g q
C405.2.1 Occupancy sensors Installed in OComplies Requirement will be met LED 2 copy 1:C3:7"Downlight:Other: 1 25 14 350 - In Restaurant 201-1,Gate G201a closes off the restaurant space while allowing egress from Hall
(EL161' required spaces. ODoes Not LED 5 copy 1:C5:14"Flush Mount:Other: 1 2 24 48 220 t0 door(E)2-4.
:Not Observable LED 7:D2:4"Downlight Other: 1 4 14 56 - In Restaurant 202-1,Gates G202a and G202b close of the restaurant space while allowing
ONot Applicable LED 14:Tl:2"Cylinder:Other: 1 24 12 288 egress from Hall 220 t0 door(E)2-4.
C405.2.1. Independent lighting controls installed DComplles -Requirement will be met. LED 18 copy 1:W4:Lighted Vanity Mirror:Other: 1 2 5 9 - In Back Bar 201-2,Door 201b has been replaced with a security gate G201 b to allow for ease of
C405.2.2. per approved lighting plans and all ODoes Not Reataurant/Bar(Dining'Bar I ounge/Leisure 5050 so ft 1 access for restaurant staff during hours of operation.
3 manual controls readily accessible and:Not Observable LED 1:C2:Ceiling Light:Other: 1 12 25 300 - Between the kitchen hall and Kitchen 200-1,Door 200a has been replaced with security gate
[EL23)' visible to occupants. ONot Applicable LED 2:C3:7"Downlight:Other: 1 14 14 196 G200a to allow for ease of access for restaurant staff during hours of operation.
LED 5: :la"Flush Mount:Other: 1 4 2a 96 - Between the kitchen hall and Plating 200-0,Door 200b has been replaced with security gate
C405.2.2. Automatic controls to shut off all Om Li
OC
omplies Requirement will be met. LED 8:L1:Tape Light(per foot):Other: 1 192 4 864 G200b to allow for ease of access for restaurant staff during hours of operation.
1 building lighting installed in all ODoes Not LED 9:Pl:Decorative Pendant:Other: 8 3 225 675
[a22)t buildings. LED 10:P3:Decorative Pendant:Other: 1 6 60 360 As discussed with Nick and Denis,these gates are only to be closed when the restaurant is not
:Not Observable
occupied or in operation. It is onlyto secure the areas and allow for the safe egress of the building.
Applicable LED 11:P4:Decorative Pendant:Other: 1 4 240 960 P P 9
C405.2.3 Daylight zones provided with OComplies Requirement will be met. LED 15:Wl:Wall Sconce:Other: 1 6 6 36 Per 2015 IBC Section 1010.1.9.3,Item 2,these security gate locations are at Group A Occupancies
[EL1612 individual controls that control the ODoes Not LED 16:W2:Wall Sconce:Other: 2 9 7 63 of 300 occupants or less.The locking devices will be clearly distinguishable as locked and a sign
lights Independent of general area LED 20:WI:Step Light:Other: 1 6 4 24 will be placed on or adjacent to the security gates stating"THIS GATE TO REMAIN UNLOCKED
lighting. :Not Observable WHEN THIS SPACE IS OCCUPIED."
ONot Applicable
C405.2.3, Primary sidelighted areas are DComplles Requirement will be met.
C405.2.3. equipped with required lighting ODoes Not
1, controls. Sincerely,
C405.2.3. ['Not Observable
2 DNot Applicable Project Title: Gravity Haus-Aspen Report date:08/14/23
[E1.201' Data filename: Page 1 of 5
C405.2.3, Enclosed spaces with daylight area OComplles '.Exception:Requirement does not apply. Rebecca Stone,AIA,LEED AP BD+C
C405.2.3. under skylights and rooftop monitors Oboes Not Principal
1, are equipped with required lighting ['Not Observable OZ Architecture
C405.2.3. controls.
3 ONot Applicable RECEIVED
[EL211t
08/25/2023
C405.2.4 Separate lighting control devices for OComplies Requirement will be met. en+rz023 3003 LAMER ST (303)221-5704
[EL4l' specific uses installed per approved ODoes Not racer 0)2 DENVEa co e0205
lighting plans. za NI PEN
ONot Observable A B c D E BUILDING DEPARTMENT
ONot Applicable Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
C405.2.4 Additional interior lighting power DComplles 'Requirement will be met Fixture Fixture Watt.
IEL81' llowed for special functions per the Doves Not LED 16:W4:Lighted VanityMirror.Other: 1 4 5 18
approved lighting plans and is .['Not Observable g
automatically controlled and ONotot Applicable
LED 10:P8:Decorative Pendant:Other: 1 5 60 300
separated from general lighting. ppica
C405.3 Exit signs do not exceed 5 watts DCom Iles Requirement will be met. C LED 1 cong(Ofce 29g0 s0.h:
Per PLED 1 copy 1:C2:Ceiling Light:Other: 1 2 25 50
[EL61' face. ODoes Not LED 2 copy 1:C3:7"Downlight Other: 1 18 14 252
[Not Observable LED 5 copy 1:C5:14"Flush Mount:Other: 1 24 10 240
:Not Applicable LED 12:P5:Decorative Pendant:Other 1 3 160 480
Additional Comments/Assumptions: LED 13:P7:Large Pendant:Other: 1 2 100 200
LED 18 copy 1:W4:Lighted Vanity Mirror:Other: 1 2 5 9
Retail(Retail 750 s0 ft 1
LED 2:C3:7"Downlight:Other: 1 3 14 42
LED 14:TO:2"Cylinder Other: 1 4 12 48
Total Proposed Watts= 6065
Interior Lighting PASSES
I1lHIgh Impact Merl) I2I Medium Impact(Ter 2) I3'Low Impact O1er3) I Interior Lighting Compliance
Statement
Compliancegpla statement:The proposed interior lighting alteration project permit
represented in this document is consistent with the r,„,„„..,„
[p(p�'�y.JJData fileia Gravity Haus-Aspen Report date:08/0823pop g g poiLYrtyData filename: Page 4 of 5sy tom have sp n designed,and eetthe 201l5IECC submitted with this permit application.Tchehe kWeb ad idt o or lightingJ114'�'.1Systems have been designed to meet the 2015 IECC requirements in C Mcheck Versio COMche kWeb and to comply with any
applicable mandatory requirements listed in the Inspection ChecklistCarlton Fretwell,P.E. 08-14-231/2023
Name-Title Signature Date FORCODSCEISISIIANCE
nickt
Section
# Final Inspection Complies? Comments/Assumptions
&Req.ID
C303.3, Furnished O&M instructions for DComplles Requirement will be met.
C408.2.5. systems and equipment to the Oboes Not
2 building owner or designated ['Not Observable
(F11713 representative. ONot Applicable
C405.4.1 Interior installed lamp and fixture OComplies See the Interior Lighting fixture schedule for values.
[FI181' lighting power is consistent with what Oboes Not
is shown on the approved lighting ['Not Observable
plans,demonstrating proposed watts
are less than or equal to allowed ONot Applicable
watts.
C408.2.5..Furnished as-built drawings for DComplles Requirement will be met
I electric power systems within 90 days ODoes Not
[FI1613 of system acceptance. ['Not Observable
ONot Applicable
C408.3 Lighting systems have been tested to DComplles Requirement will be met.
IF1331' ensure proper calibration,adjustment,ODoes Not
programming,and operation. ['Not Observable
DNot Applicable
Additional Comments/Assumptions:
I•I.High Impact(Tier 1) 12 JMedi m Impact(Tier 2) I3 I-Low Impact(Tier 3)
Project Title: Gravity Haus-Aspen Report date:08/0823 Project Title: Gravity Haus-Aspen Report date:08/14/23
Data filename: Page 5 of 5 Data filename: Page 2 of 5