HomeMy WebLinkAboutFile Documents.1315 Sage Ct.0024-2023-BCHO City of Aspen Change Order Narrative
Iglehart Construction
Brandon Ford
CO#23-310
Date: 2.12.2023
Additional information related to as-built structural and mechanical.
Structural page S202:
1. As-built floor framing between grids B and H.
2. As-built floor framing between grids J and I Update relevant architectural sheets
Structural page S203: for the condensing unit relocation
change so that I can have zoning
1. Additional flat roof framing information not shown on permit s,confirm this new location is
2. New beam size along grid line F acceptable per them, as long as you
3. Additional floor framing information at grid lines C and 1 not sh meet manufacturer installation
requirements building code won't
Structural page S204: have any issue.
1. Additional roof framing information between grid lines 1 and 4.
Mechanical page M-1-1:
1. Basement as-built routing of ductwork and the swapping of location with boiler and hot water
unit.
Mechanical page M-1-2:
1. Main level as-built of ductwork routing at Existing master, Master suite an. entry.
2. Garage area as-built of ductwork routing and relocation of FC5 into attic ..ove master bath .
Mechanical page M-1-3:
2. The relocation of the five condensing units to the flat roof.
Additional information in relation to utilities routing.
1.The permit set Woody Creek Engineering civil drawing C600 dated 11.22.2021 shows the water
service coming on to the property near the west driveway.The problem is it cuts through an area of
unapproved tree removal.A new Crystal River Civil drawing dated 8.25.2022 shows new water service
starting at main near west driveway and proceeding through driveway to a entry location near the
structure entry.
2.The permit set Woody Creek Engineering civil drawing C600 dated 11.22.2021 shows the sewer
service coming on to the property near the east driveway.The problem is it cuts through an area of
RECEIVED
04/05/2023
ASPEN
BUILDING DEPARTMENT
unapproved tree removal.A new Crystal River Civil drawing dated 8.25.2022 shows a new sewer service
starting at the main near east driveway and proceeding through driveway to an entry location near the
structure side entry.
3.The permit set Woody Creek Engineering civil drawing C600 dated 11.22.2021 did not show any
electrical service routing.The new Crystal River Civil drawing dated 8.25.2022 shows the electrical
service routing from the transformer to the exterior panel location at the structure.
4.The permit set Woody Creek Engineering civil drawing C600 dated 11.22.2021 did not show any
foundation drainage or related drywell.The new Crystal River Civil drawing dated 8.25.2022 shows the
addition of a foundation drainage drywell.