Loading...
HomeMy WebLinkAboutFile Documents.555 E Durant Ave.0103-2024-BRES ADDRESS:555 E Durant Ave. #4H PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT , O BUILDING PERMIT CONTACT SHEET CITY OF ASPEN FOR PLAN REVIEW QUESTIONS • • - Of• • ' II- V'-i • Name John Patrick Phone E-mail FOR INSPECTION QUESTIONS • • • '. • • • Name John Patrick Phone • •• E-mail OWNER il Name • ' - • • - T T .' Phone • , .• 4 • i Cell Phone - - • • Mailing Homewood Rd. city Los Angeles State CA ZIP90049 E-mail Address Ironanvalle@gmail.com 11 JValle@vallemakoff.com OWNER'S AUTHORIZED AGENT - I- , '-i Name Osage Inc. Phone Cell Phone mailing 913 Red Mountain Dr. City Springs StateCO ZIP81601 E-mail osage.ex@gmail.com Address APPLICATION BEST CONTACT _ - _ Name John Patrick Phone Cell Phone Mailing 913 Red Mountain Dr. City Springs StateCO ZIP81601 Address E-mail osage.ex@gmail.com Address ARCHITECT OR DESIGNER CF RECORD Name N/A Phone Cell Phone Mailing Address City State ZIP E-mail Address CIVIL ENGINEER Cr'RECORD Name N/A Phone Cell Phone Mailing Address City State ZIP E-mail Address STRUCTUAL ENGINEER Or RECORD Name N/A Phone Cell Phone Mailing Address City State ZIP E-mail Address GENERAL CONTRACTOR Name Osage Inc. Phone Cell Phone • Mailing 913 Red Mountain Dr. GtyGlenwood Springs StateCO ZIP 81601 E-mail Address osage.ex@gmail.com I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. Additionally,I understand that I am responsible for ensuring that all sub-permits associated with my project are submitted to the City in compliance with the approved aster plan set.I understand that the City does not review sub-permits for compliance with the master plan set Contractor E C EWE D Signature Date �� ❑ Ch u are a tested owner builder(single-family homes only).You must take a test and complete the'ownerr/ i i i 4 ale E32 . (C USE ONLY)Owner builder approved by: Date: Affidavit on file ( CITY OF ASPEN March2024427 RIO GRANDE PL I ASPEN, Cr ; ,lyT ADDRESS:555 E Durant Ave. #4H PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT �`044 HOMEOWNER ASSOCIATION COMPLIANCE FORM C,r,OFASPEN All applications for a building permit within the City of Aspen are required to include a certification of compliance with applicable covenants and homeowner association policies. The certification must be signed by the property owner or attorney representing the property owner. The following certification shall accompany the application for a permit. ADDRESS UNIT E Durant Ave. UNRM4H LiD. 273718249043 I,the property owner, certify as follows: (pick one) li0 This property is not subject to a homeowners association or other form of private covenant. J 0 This property is subject to a homeowners association or private covenant and the improvements l proposed in this building permit do not require approval by the homeowners association or covenant beneficiary. 0 This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit have been approved by the homeowners association or covenant beneficiary. i I understand the City of Aspen does not interpret, enforce,or manage the applicability, meaning, or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. Owner Signature ZAde 'Cf e <—J—Zv2 Z/ Owner Printed Name OR Owner's Attorney Signature Date Owner's Attorney Printed Name RFCEIVE CITY OF ASPEN March2024 427 RIO GRANDE PL I ASPEN, CO-: 1642/y iz NI ASPEN BUILDING DEPARTMENT ADDRESS:555 E Durant Ave. #4H PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ,,041 1.1►. VALUATION AFFIDAVIT 4101 r CifY( ASPEN AFFIDAVIT POLICY All applications for a building permit within the City of Aspen are required to include a certification of compliance with building permit valuation requirements. The certification must be signed by the property owner or authorized representative. The following certification shall accompany the application for a permit. I,the property owner or authorized agent, understand and certify as follows: City of Aspen Ordinance No. 1, Series of 2023 adopts the 2021 International Building Code (IBC)with certain amendments. These codes define building valuation as follows: R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems, including materials and labor. 109.3 Building permit valuations.The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official,the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. City policy indicates that permit valuation includes materials and labor for the structure and mechanical, electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and counter tops are included in the permit valuation total. Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development mitigation fees, trash removal, and cleaning are not included. I certify that the permit valuation entered on the permit application for this property complies with the above valuation requirements. I understand� that this document is a public document. Owner Signature: c /4/L /['�� Date: Owner Printed Name: or, Authorized Agent Signature: Date: Authorized Agent Printed Name: RECEIVE D I CITY OF ASPEN March2024 427 RIO GRANDE PL I ASPEN, CO3$.1$I'lpt ASPEN BUILDING DEPARTMENT ADDRESS: 5SS f Durant Ave adlf PERMIT NUMRER ____ COMMUNITY DEVELOPMENT dil) ASBESTOS VERIFICATION AND CHECKLIST car l».s.rM ASBESTOS INFORMATION Asbestos is a mown human carcinogen and is an airborne harard Once airborne,asbestos fibers can stay suspended in the air k►r day", weeks,or even monitn before settling out of the air The Rbers can essay become airborne again from a minor disturbance like turning on an air conditioner Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos harards that could eipose people to asbestos in the future,long after the renovation activity occurred The airborne asbestos Myer r on►rntretion•resulting from disturbances may result in a significant exposure to the current and future occupants of the home T .1WM'bon'on materials is commonly misunderstood.In fact,in 1991 the U S. Fifth Circuit Court of appeals vacated much of the totalled "Asbestos Ban and Phaseout Rule"and remanded it to the EPA Thus,much of the original 1989 EPA ban on the U S manufacturing,importation, processing,or distribution in commerce of many asbestos containing product categories was set aside and DID NOT TAKE EFFECT Therefore,All demolition,remodel or renovation protects must determine if disturbed material above the trigger levels contains asbestos ASBESTOS CHECKUST QYesUINo Residential: Will you be removing more than 32 sq ft, 50 linear feet(e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel-examples are drywall, linoleum, ceiling tiles, roofing materials, etc.? ❑Yes InNo Commerdal: Will you be removing more than 160 sq ft, 50 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel-examples are drywall, linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.? If the answer Is YES to any of the above, you will need an asbestos test before you can receive a building and/ or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a CO state demolition license is required. A state certified asbestos inspector must do this test and the test report must be submitted with the building permit application. If the building has asbestos, a state certified asbestos abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building Department stating that all the asbestos has been removed and that the air is clean. This letter must be received BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state. co.us/ap/asbestos/Index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current state certification.) If you are demolishing the building, you must submit a demolition permit app with the CDPHE In addition to the Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE: A copy of this demolition permit app must be submitted with the initial building permit application. When the CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our permit. I hereby certify that the above information is true and complete. Owner Phone Ronan Phone#310-422-7608 Applicant (print name)John Patrick Phone 1f970-309-8239 Applicant Signature 4V Date o�f as Please contact the Bung Department at buildingsupport@aspen.gov at any time if you have qur JelIVED asbestos, interpreting your test results, or other matters. �' �Y/ ( CITY OF ASPEN 6A-hz024 427 RIO GRANDE PL I ASPEN, CO431621424 ASPEN BUILDING DEPARTMENT 1 PERMIT NUMBER: ADDRESS: COMMUNITY DEVELOPMENT DEPARTMENT ,�j� ► ZONING COMPLIANCE VERIFICATION POLICY CITY OFASPEN 4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/ elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items unique to the project. 5-The report shall include a written description or drawing notes of the benchmarks or control points used to establish property boundaries, setbacks, building location, building height,and grades for each measurement. 6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in the approved building permit set. 7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptance of Report:The Zoning Officer shall review the report(s) and either confirm the project conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited to additional survey work or a site visit. All drawings of the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field conditions or amendments to the building permit may be required. A determination of non-compliance shall result in the issuance of a correction notice and possible work stoppage.Applicants are encouraged to verify zoning compliance as early as reasonably practical in the construction process to minimize disruption to the construction schedule. Acknowledgment: I (contractor name) N,/� Poetristl< understand this policy. I agree that this project will comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this project complies with all applicable zoning limitations. Contractor Signature: 6004V---- Date: off/ lap(' RECEIVE 1. OR/29/202 CITY OF ASPEN March2024 427 RIO GRANDE PL I ASPEN, CO 8161.1 10