Loading...
HomeMy WebLinkAboutFile Documents.433 E Hyman Ave.0041-2024-BCOM (2) 0 ,, City of Aspen Building Permit Application Checklist for Commercial and Multifamily Projects (2021 IBC) CITY OF ASPEN PROJECT ADDRESS 433 E Hyman DATE 8/21/24 Note:This checklist is specific to Building Department requirements for various building permit application types.For Zoning, Engineering,Parks, Utilities,and WELS requirements visit their pages at http://www.aspen.gov. Building permit application submissions must include ALL the Submittal Requirements on this checklist or they will not be accepted. Refer to the Commercial and Multifamily Building Submittal Guide for more information about each requirement. Submittal guides,required forms and other resources can be found in the Building Department Document and Resource Library. Submit all documents and drawings in PDF format via the Salesforce portal.Follow File Preparation Standards for all files submitted. REQUIRED 8 %" X 11" DOCUMENTS Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Permit Application Packet* Y Asbestos test and clearance reports Y, test results required at submittal State Asbestos Demolition Approval Notice Fireplace Registration Form &Manufacturer's N/A installation instructions Energy Code Compliance (REScheck, Y COMcheck, or prescriptive path) U-Factor Fenestration Docs REMP documents Line Grade Verification Form Signed Special Inspection and Testing N/A Agreement MA_ ' Updated 5/23/23 Page 1 of 6 1 0/1 0/2 0 2 4 ASPEN BUILDING DEPARTMENT Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Verification of Y-stamped letter Structural from architect or Integrity structural engine Structural Calculations Soils Report Mechanical Docs N/A Photos Y Unit/Building relationship Indicate adjacent uses Benchmarking Agreement N/A 11111 Energy Assessment N/A Report (residential only) CMP** Y Residential ECU Calculator** N/A Water/sewer 11 Service Disconnect Applications *Permit Application Packet must be filled out entirely or your submission will not be accepted. **CMP and ECU Calculator are common Engineering requirements; contact Engineering to discuss. RECEIVED Updated 5/23/23 Page 2 of 6 10/10/2 0 2 4 ASPEN BUILDING DEPARTMENT REQUIRED 24"x36" PLANS Note: Sheets must be in the following order. Existing plans required for all additions &alterations. Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Cover Sheet Y Survey Area Sheet Y Work Area/Demo p. Plans Fenestration Area Drawings Site Plan CREMP/RREMP Plan Floor Plans: Existing & Proposed Reflected Ceiling Plans Lighting Plan w/ spec sheet(s) Occupancy/ Means of Egress Plans Separation/Fire Resistance Plans Y Fire Resistant Y. Include the Assembly Listed Installation detail I email Details to you. Accessibility Plans &Details it lr='vi f'fi 1►ilk Updated 5/23/23 Page 3 of 6 10/10/2 0 2 4 ASPEN BUILDING DEPARTMENT Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Roof Plan • Elevations/ Height Sections Y Details Y Fireplace Details N/A Schedules Lighting, door Excavation/ Earth Retention Plans Civil Plans *discuss directly with Engineering Electrical Plans Y Kitchen Plans N/A Mechanical Plans N/A Plumbing Isometrics/ N/A Flatometric Structural Plans N/A RECEIVED Updated 5/23/23 Page 4 of 6 1 0/1 0/2 0 2 4 ASPEN BUILDING DEPARTMENT ADDITIONAL NOTES and/or REQUIREMENTS -Soffit/ceiling cove infill: indicate non-combustible or FRT framing (2021 IBC 803. 13) -Type of construction is Type VA, revise -Applicable codes fixes: --2023 NEC --2017 ICC A117. 1 --All codes as adopted and amended by City of Aspen -Include horizontal assembly detail I will email to you -Indicate no scope in basement -2021 IECC for interior lighting comcheck Updated 5/23/23 Page 5 of 6 10/10/2 0 2 4 ASPEN BUILDING DEPARTMENT PRE-SUBMISSION BUILDING CHECKLIST REVIEWED AND ACCEPTED: CITY STAFF NAME: Nick Thompson DATE: 8/21/24 PERMIT APPLICANT DECLINES TO CONDUCT A PRE-BUILDING PERMIT SUBMISSION MEETING WITH BUILDING STAFF AND UNDERSTANDS THAT FAILING TO DO SO MAY RESULT IN A LENGTHIER BUILDING REVIEW PROCESS: PERMIT APPLICANT NAME: DATE: RECEIVED Updated 5/23/23 Page 6 of 6 1 0/1 0/2 0 2 4 ASPEN BUILDING DEPARTMENT