HomeMy WebLinkAboutFile Documents.433 E Hyman Ave.0041-2024-BCOM (2) 0 ,, City of Aspen Building Permit Application Checklist
for Commercial and Multifamily Projects (2021 IBC)
CITY OF ASPEN
PROJECT ADDRESS 433 E Hyman DATE 8/21/24
Note:This checklist is specific to Building Department requirements for various building permit application types.For Zoning, Engineering,Parks,
Utilities,and WELS requirements visit their pages at http://www.aspen.gov.
Building permit application submissions must include ALL the Submittal Requirements on this checklist or they will not be accepted. Refer to the
Commercial and Multifamily Building Submittal Guide for more information about each requirement. Submittal guides,required forms and other
resources can be found in the Building Department Document and Resource Library.
Submit all documents and drawings in PDF format via the Salesforce portal.Follow File Preparation Standards for all files submitted.
REQUIRED 8 %" X 11" DOCUMENTS
Submittal New Addition Alteration/ Alteration Demo Repair
Requirements Construction Remodel (Interior only) (Complete)
Permit
Application
Packet* Y
Asbestos test and
clearance reports Y, test results
required
at submittal
State Asbestos
Demolition
Approval Notice
Fireplace
Registration Form
&Manufacturer's N/A
installation
instructions
Energy Code
Compliance
(REScheck, Y
COMcheck, or
prescriptive path)
U-Factor
Fenestration
Docs
REMP documents
Line Grade
Verification Form
Signed Special
Inspection and
Testing N/A
Agreement MA_
'
Updated 5/23/23 Page 1 of 6 1 0/1 0/2 0 2 4
ASPEN
BUILDING DEPARTMENT
Submittal New Addition Alteration/ Alteration Demo Repair
Requirements Construction Remodel (Interior only) (Complete)
Verification of Y-stamped letter
Structural from architect or
Integrity
structural engine
Structural
Calculations
Soils Report
Mechanical Docs
N/A
Photos
Y
Unit/Building
relationship Indicate adjacent
uses
Benchmarking
Agreement N/A
11111
Energy
Assessment N/A
Report
(residential only)
CMP**
Y
Residential ECU
Calculator**
N/A
Water/sewer 11
Service
Disconnect
Applications
*Permit Application Packet must be filled out entirely or your submission will not be accepted.
**CMP and ECU Calculator are common Engineering requirements; contact Engineering to discuss.
RECEIVED
Updated 5/23/23 Page 2 of 6 10/10/2 0 2 4
ASPEN
BUILDING DEPARTMENT
REQUIRED 24"x36" PLANS
Note: Sheets must be in the following order. Existing plans required for all additions &alterations.
Submittal New Addition Alteration/ Alteration Demo Repair
Requirements Construction Remodel (Interior only) (Complete)
Cover Sheet
Y
Survey
Area Sheet
Y
Work Area/Demo p.
Plans
Fenestration Area
Drawings
Site Plan
CREMP/RREMP
Plan
Floor Plans:
Existing &
Proposed
Reflected Ceiling
Plans
Lighting Plan w/
spec sheet(s)
Occupancy/
Means of Egress
Plans
Separation/Fire
Resistance Plans Y
Fire Resistant Y. Include the
Assembly Listed
Installation detail I email
Details to you.
Accessibility
Plans &Details
it lr='vi f'fi 1►ilk
Updated 5/23/23 Page 3 of 6 10/10/2 0 2 4
ASPEN
BUILDING DEPARTMENT
Submittal New Addition Alteration/ Alteration Demo Repair
Requirements Construction Remodel (Interior only) (Complete)
Roof Plan •
Elevations/
Height
Sections
Y
Details
Y
Fireplace Details
N/A
Schedules Lighting, door
Excavation/
Earth Retention
Plans
Civil Plans
*discuss directly
with Engineering
Electrical Plans
Y
Kitchen Plans
N/A
Mechanical Plans
N/A
Plumbing
Isometrics/ N/A
Flatometric
Structural Plans
N/A
RECEIVED
Updated 5/23/23 Page 4 of 6 1 0/1 0/2 0 2 4
ASPEN
BUILDING DEPARTMENT
ADDITIONAL NOTES and/or REQUIREMENTS
-Soffit/ceiling cove infill: indicate non-combustible or FRT
framing (2021 IBC 803. 13)
-Type of construction is Type VA, revise
-Applicable codes fixes:
--2023 NEC
--2017 ICC A117. 1
--All codes as adopted and amended by City of Aspen
-Include horizontal assembly detail I will email to you
-Indicate no scope in basement
-2021 IECC for interior lighting comcheck
Updated 5/23/23 Page 5 of 6 10/10/2 0 2 4
ASPEN
BUILDING DEPARTMENT
PRE-SUBMISSION BUILDING CHECKLIST REVIEWED AND ACCEPTED:
CITY STAFF NAME: Nick Thompson
DATE: 8/21/24
PERMIT APPLICANT DECLINES TO CONDUCT A PRE-BUILDING PERMIT SUBMISSION MEETING
WITH BUILDING STAFF AND UNDERSTANDS THAT FAILING TO DO SO MAY RESULT IN A
LENGTHIER BUILDING REVIEW PROCESS:
PERMIT APPLICANT NAME:
DATE:
RECEIVED
Updated 5/23/23 Page 6 of 6 1 0/1 0/2 0 2 4
ASPEN
BUILDING DEPARTMENT