688 Spruce Change Order#1
To KORU CONSTRUCTION, CITY OF ASPEN
FROM CCY—MAURATRUMBLE
DATE 12.13.2021
J O B 688 SPRUCE ST
RE PERMIT CHANGE ORDER#01 (ASI-01)
ASI-01 (DELTA 1)— LANDSCAPE & SPA ITEMS, DOG WASH, MINOR INTERIOR REVISIONS
This Change Order#01 is concerned with the addition of the in-ground spa, exterior material changes in
paving and finish, and the addition of a dog wash area in the garage. This also includes a few minor
interior changes, including an adjustment to a lower level bathroom and closet layout, a window
adjustment in the bunk room, and a simplified drainage plan in the garage.
REVISED DRAWINGS:
SHEET# DESCRIPTION OF CHANGE
LANDSCAPE DOCUMENTS
L0-00 •Assigned ASI 01 issue date.
• Clarified Sheet Index to indicate where to find location of series drawings not included in
landscape sheet set. Series drawings indicated as Not Included at this Time will not be
provided as not necessary.
• Indicated sheets included in ASI 01.
LO-03 • Site material legend adjustment- concrete paving adjust to stone paving
L3-01 • South and north patio paving material and joints adjustment, east patio paving material
adjustment, prefabricated spa adjusted to gunite spa.
L7-01 • Stone paving and spa copping details.
L7-02 • Mortar joint detail.
L7-08 • Wood deck detail.
SP 100 • Overall Spa Plan and Notes
SP 200 • Spa Plan
SP 300 • Spa Piping Plan
SP 400 • Equipment Room Plan
SP 410 • Circulation Equipment Details
SP 500 • Sections and Structural Details
SP 600 • Details
ARCHITECTURAL DOCUMENTS
A-100 - Revised note at new inground-spa
A-110 - Revised notes at spa and fitness deck, re: landscape and spa drawings.
- Revised egress window in bunkroom
- Revised bathroom and closet layout, Bath 3
A-111 - New Dog Wash area in Garage
- Revised and simplified garage drainage
A-120 - Revised egress window in bunkroom
A-121 - Revised bathroom and closet layout, Bath 3
A-122 - New Dog Wash area with low-flow handshower in garage
- Revised and simplified garage drainage
A-130 - Revised bathroom and closet layout, Bath 3
RECEIVED
12/16/2021