688 Spruce Change Order#2
To KORU CONSTRUCTION, CITY OF ASPEN
FROM CCY—MAURA TRUMBLE
DATE 06.06.2022
J O B 688 SPRUCE ST
RE PERMIT CHANGE ORDER#02 (ASI-02)
ASI-02 (DELTA 2)—VARIOUS PROJECT REVISIONS: LANDSCAPE, ARCH, MEP, STRUCTURAL
This Change Order#02 is concerned with updates to the landscape design, minor architectural
specification and design changes throughout the project, structural updates and MEP updates capturing
owner changes.
REVISED DRAWINGS:
SHEET# DESCRIPTION OF CHANGE
LANDSCAPE DOCUMENTS
LO-00 •Assigned ASI 02 issue date
• Clarified Sheet Index to indicate where to find location of series drawings not included in
landscape sheet set. Series drawings indicated as Not Included at this Time will not be
provided as not necessary
• Indicated sheets included in ASI 02
• Indicated sheets included in ASI 01.
LO-03 • Site Material legend adjustment-added the gravel paving
• Planting material legend adjustment- hatch pattern and symbol adjustment
• Proposed trees total caliper inch adjustment per updated planting plan
LO-04 • Planting schedule adjustment-quantity and size adjustment
L3-01 • New Site features added:
• Bocce court, fire terrace, and retaining wall
•Wood deck extension and gravel pad
• Mulch path connection between new features
•Additional guest parking and retaining wall
• Dog run fence and gate
• Garden fence post size adjustment
L7-02 • Gravel paving detail added
L7-06 • Garden fence post size adjustment
L7-07 • Dog run fence and gate added
L7-08 • Fire Feature installation detail added
L7-09 •Wood deck height and length adjustment
L7-10 • Bocce court plan and section detail added
L8-01 • Site planting plan adjustment
• Screening trees added to north, west and south of the property
• Turf and native revegetation area adjustment to align with new site features
L10-01 • Hydrozone Plan adjustment
IR-1 •WELS calculation adjustment
IR-2 • Irrigation plan adjustment
ARCHITECTURAL DOCUMENTS
G-002 - Revised deck area total (remains below allowable, fully exempt)
G-006 - Revised deck area total (remains below allowable, fully exempt)
A-100 - Revised landscape background and notes to reference new landscape drawings
-Added gravel area for sculpture at end of deck
RECEIVED
06/20/2022
COTTLE CARR YAW 228 Midland Ave Box 529 Basalt CO 81621 970 927 4925 www.ccyarchitects.com
ASPEN
BUILDING DEPARTMENT
- Revised snowmelt footprint to reflect current design, revised RREMP worksheet
included in submission.
-Added guest parking and retaining wall per new landscape design.
A-110 - Revised snowmelt footprint at terrace
-Added steel trellis for shade sail
-Added pizza oven at outdoor kitchen
- Extended deck slightly and added gravel pad for sculpture
A-111 - Revised snowmelt at autocourt and walkway
- Closet 110 divided into two small closets accessed from office and hallway.
- Separate trash area added at garage
- Door 108A revised to 5-panel slider
A-120 - Revised door swing on door 008B, door 007A changed to pocket door
- Removed small window in wine room
-Added steel trellis for shade sail
-Added pizza oven at outdoor kitchen
A-121 - Revised door swings on doors 015B and 015A, changed doors 013A and 018A to
pocket doors
A-122 -Added wall and door 101E to create enclosed trash area in garage
- Door 108A revised to 5 panel slider due to window manufacturer's constraints
- Revised outdoor room floor finish to open joint stone paver system over sloped
waterproof membrane
A-123 - Revised terrace off Master Bedroom to open joint stone paver system over sloped
waterproof membrane
- Closet 110 divided into two small closets accessed from office and hallway.
- Revised Master Bath 114 to wood flooring
A-130 -Added steel trellis for shade sail, added electric patio heaters at trellis. Updated spec
included in submission
- Revised electric heater spec at outdoor room.
- Revised Master Bedroom and Dressing Room to GWB ceiling finish (previously wood)
-Added trash enclosure in garage
A-201 -Added steel trellis for shade sail
A-500 - Revised F2 to reflect change to stone pavers at slab-on-grade terrace locations
- Revised F4 to reflect change to open joint stone paver on pedestal system
-Added F2A to clarify required insulation at exterior terraces with snowmelt and stone
pavers
- Eliminated ceiling assembly C2— no longer used
STRUCTURAL DOCUMENTS
S-120 - Updates to concrete for architectural updates
- Concrete pilaster and footing added to support structure above
S-121 - Plan annotations added for clarity
- Concrete wall increased to 14"thickness
S-122 - Screen wall added
- Fireplace added
-Joist penetrations
-Wind Girts added
- Garage slab slope adjustment
S-123 - Patio updated for guardrail
S-124 - Screen wall added
- Fireplace added
- Eave framing updated
- Diaphragm blocking added
- Flat roof steel sizes changed to accommodate decreased ceiling depth
S-125 - Framing added for clarity
- Eave framing updated
RECEIVED
06/20/2022
COTTLE CARR YAW 228 Midland Ave Box 529 Basalt CO 81621 970 927 4925 www.ccyarchitects.com
ASPEN
BUILDING DEPARTMENT
S-300 - Screen wall details updated for clarity
S-400-408 - Details updated or added for clarity
S-500 - Schedules updated for changing framing conditions
S-502 - Hanger schedule updated for changing framing conditions
MECHANICAL DOCUMENTS
Added HVAC zone for the spa vault
Modified SA and RA ducting to the Living Room
Modified SA ducting to the Kitchen
Revised EA strategy for Bunk Bath
• Added hydronic manifold locations
• Added thermostats and ventilation controllers to respective spaces
• Revised snowmelt zones and areas
• Added a dedicated boiler for spa and snowmelt heating
Re-routed boiler flue and combustion air ducting
Revised Mechanical Room EA strategy
Revised AHU-1 &AHU-2 selections and airflows
Revised Master Bedroom GRD sizes and locations
Revised equipment schedules
Revised piping diagram to reflect separate boiler systems
Updated control sequences
ELECTRICAL DOCUMENTS
• Revised equipment schedules and load calculations to match Mechanical changes
• Adjusted electrical equipment locations and sizes for updated backgrounds and electrical gear
submittals
Tesla Powerwalls reoriented to allow for ventilation space between units
Receptacle adjustments for background changes
Added additional EV Charger and future EV charger provisions
Added spa and spa vault equipment and details
Added distribution panel DP-1 for additional breaker space
PV design switched to microinverter design to meet space constraints
• Updated#of allowable Powerwalls to match busbar sizing
• Updated per code review notes
• Switch to aluminum conductors from copper conductors