Loading...
HomeMy WebLinkAboutFile Documents.688 Spruce St.0046-2022-BCHO CCYARCHITECTS 688 Spruce Change Order#2 To KORU CONSTRUCTION, CITY OF ASPEN FROM CCY—MAURA TRUMBLE DATE 06.06.2022 J O B 688 SPRUCE ST RE PERMIT CHANGE ORDER#02 (ASI-02) ASI-02 (DELTA 2)—VARIOUS PROJECT REVISIONS: LANDSCAPE, ARCH, MEP, STRUCTURAL This Change Order#02 is concerned with updates to the landscape design, minor architectural specification and design changes throughout the project, structural updates and MEP updates capturing owner changes. REVISED DRAWINGS: SHEET# DESCRIPTION OF CHANGE LANDSCAPE DOCUMENTS LO-00 •Assigned ASI 02 issue date • Clarified Sheet Index to indicate where to find location of series drawings not included in landscape sheet set. Series drawings indicated as Not Included at this Time will not be provided as not necessary • Indicated sheets included in ASI 02 • Indicated sheets included in ASI 01. LO-03 • Site Material legend adjustment-added the gravel paving • Planting material legend adjustment- hatch pattern and symbol adjustment • Proposed trees total caliper inch adjustment per updated planting plan LO-04 • Planting schedule adjustment-quantity and size adjustment L3-01 • New Site features added: • Bocce court, fire terrace, and retaining wall •Wood deck extension and gravel pad • Mulch path connection between new features •Additional guest parking and retaining wall • Dog run fence and gate • Garden fence post size adjustment L7-02 • Gravel paving detail added L7-06 • Garden fence post size adjustment L7-07 • Dog run fence and gate added L7-08 • Fire Feature installation detail added L7-09 •Wood deck height and length adjustment L7-10 • Bocce court plan and section detail added L8-01 • Site planting plan adjustment • Screening trees added to north, west and south of the property • Turf and native revegetation area adjustment to align with new site features L10-01 • Hydrozone Plan adjustment IR-1 •WELS calculation adjustment IR-2 • Irrigation plan adjustment ARCHITECTURAL DOCUMENTS G-002 - Revised deck area total (remains below allowable, fully exempt) G-006 - Revised deck area total (remains below allowable, fully exempt) A-100 - Revised landscape background and notes to reference new landscape drawings -Added gravel area for sculpture at end of deck COTTLE CARR YAW 228 Midland Ave Box 529 Basalt CO 81621 970 927 4925 www.ccyV 09/22/2022 FORCOMGE M'11ARCE j imp - Revised snowmelt footprint to reflect current design, revised RREMP worksheet included in submission. -Added guest parking and retaining wall per new landscape design. A-110 - Revised snowmelt footprint at terrace -Added steel trellis for shade sail -Added pizza oven at outdoor kitchen - Extended deck slightly and added gravel pad for sculpture A-111 - Revised snowmelt at autocourt and walkway - Closet 110 divided into two small closets accessed from office and hallway. - Separate trash area added at garage - Door 108A revised to 5-panel slider A-120 - Revised door swing on door 008B, door 007A changed to pocket door - Removed small window in wine room -Added steel trellis for shade sail -Added pizza oven at outdoor kitchen A-121 - Revised door swings on doors 015B and 015A, changed doors 013A and 018A to pocket doors A-122 -Added wall and door 101E to create enclosed trash area in garage - Door 108A revised to 5 panel slider due to window manufacturer's constraints - Revised outdoor room floor finish to open joint stone paver system over sloped waterproof membrane A-123 - Revised terrace off Master Bedroom to open joint stone paver system over sloped waterproof membrane - Closet 110 divided into two small closets accessed from office and hallway. - Revised Master Bath 114 to wood flooring A-130 -Added steel trellis for shade sail, added electric patio heaters at trellis. Updated spec included in submission - Revised electric heater spec at outdoor room. - Revised Master Bedroom and Dressing Room to GWB ceiling finish (previously wood) -Added trash enclosure in garage A-201 -Added steel trellis for shade sail A-500 - Revised F2 to reflect change to stone pavers at slab-on-grade terrace locations - Revised F4 to reflect change to open joint stone paver on pedestal system -Added F2A to clarify required insulation at exterior terraces with snowmelt and stone pavers - Eliminated ceiling assembly C2— no longer used STRUCTURAL DOCUMENTS S-120 - Updates to concrete for architectural updates - Concrete pilaster and footing added to support structure above S-121 - Plan annotations added for clarity - Concrete wall increased to 14"thickness S-122 - Screen wall added - Fireplace added -Joist penetrations -Wind Girts added - Garage slab slope adjustment S-123 - Patio updated for guardrail S-124 - Screen wall added - Fireplace added - Eave framing updated - Diaphragm blocking added - Flat roof steel sizes changed to accommodate decreased ceiling depth S-125 - Framing added for clarity - Eave framing updated COTTLE CARR YAW 228 Midland Ave Box 529 Basalt CO 81621 970 927 4925 www.ccy 174 09/22/2022 1 FORCOMGE M'11ARCE 1imp S-300 - Screen wall details updated for clarity S-400-408 - Details updated or added for clarity S-500 - Schedules updated for changing framing conditions S-502 - Hanger schedule updated for changing framing conditions MECHANICAL DOCUMENTS Added HVAC zone for the spa vault Modified SA and RA ducting to the Living Room Modified SA ducting to the Kitchen Revised EA strategy for Bunk Bath • Added hydronic manifold locations • Added thermostats and ventilation controllers to respective spaces • Revised snowmelt zones and areas • Added a dedicated boiler for spa and snowmelt heating Re-routed boiler flue and combustion air ducting Revised Mechanical Room EA strategy Revised AHU-1 &AHU-2 selections and airflows Revised Master Bedroom GRD sizes and locations Revised equipment schedules Revised piping diagram to reflect separate boiler systems Updated control sequences ELECTRICAL DOCUMENTS • Revised equipment schedules and load calculations to match Mechanical changes • Adjusted electrical equipment locations and sizes for updated backgrounds and electrical gear submittals Tesla Powerwalls reoriented to allow for ventilation space between units Receptacle adjustments for background changes Added additional EV Charger and future EV charger provisions Added spa and spa vault equipment and details Added distribution panel DP-1 for additional breaker space PV design switched to microinverter design to meet space constraints • Updated#of allowable Powerwalls to match busbar sizing • Updated per code review notes • Switch to aluminum conductors from copper conductors CIVIL DOCUMENTS C8 -A new parking area and a bocce court have been added to the site C15 -The new parking area has added to the impervious area leading to the pond, so drainage calculations were re-done C18 -Re-grading has been done for the new parking area and the bocce court COTTLE CARR YAW 228 Midland Ave Box 529 Basalt CO 81621 970 927 4925 www.ccyV 09/22/2022 1 PORMCOMM AWE 1imp