Standard Basic Requirements to Serve
• Service is contingent upon compliance with the rules, regulations, and specifications of
the Aspen Consolidated Sanitation District(ACSD), which are on file at the District office.
• Clear-water drains (roof, foundation-perimeter, garage, exterior surface drains, etc.) may
not connect to the sanitary sewer system.
• Hydromechanical oil and grease separators are required for new and remodeled
Commercial food service facilities connected to the sanitary sewer system.
• Oil and sand separators are required for interior vehicle/apparatus parking garages
where surface/floor drains are connected to the sanitary sewer system.
• Glycol heating and snow melt systems must be designed to prohibit the discharge of
glycol to any portion of the sanitary sewer system. Glycol storage must be isolated from
drains connected to the sanitary sewer system by secondary containment systems at
100% of storage capacity.
• Existing service lines or laterals connected to the ACSD's sanitary sewer system, serving
the subject property and adjacent properties, must be identified, located, and isolated
from soil stabilization processes or other potential damage, or properly disconnected from
the ACSD main line at the point of connection according to ACSD specifications. Soil
nails are not allowed in the public right-of-way or, easements, without prior review and
acceptance by the District.
• A signed Agreement to Terminate Sewer Service must be submitted and approved by the
ACSD prior to approval of Demolition and Excavation, and/or Access and Infrastructure
permits.
• Permanent improvements are prohibited in sewer easements or rights-of-way.
Landscaping plans will require approval by ACSD where soft and hard landscaping may
impact public right-of-way or sewer easements.
• Service stub-outs installed on the sanitary main line, to serve future development
designated for use by the subject property, will be subject to a Stub-out fee to be
determined. The Stub-out fee will be forfeited if the stub-out is subsequently abandoned
in favor of an alternate connection to the main line.
• A Shared Service Line Acknowledgment, fully executed and recorded with the subject
properties' deeds will be required where more than one dwelling or unit is served by a
single service line in the absence of a common owner's association.
• Where additional development would produce flows that would exceed the planned
reserve capacity of the existing system (collection system and or treatment system) a
proportionate development Impact Fee will be assessed to mitigate the downstream
collection system or treatment capacity constraint. Additional proportionate fees will `RECEIVED
ACSD Standard Requirements to Serve-Revised 2024 Page 1 O
p$/19/2024
ASPEN
BUILDING DEPARTMENT
collected over time from all development in the area of concern to fund the improvements
needed.
• Where new main sanitary sewer lines are needed to serve development, a Line
Extension Request and Collection System Agreement are required.
• All applicable ACSD fees for new construction must be paid prior to the issuance of a
building permit. Our account specialist in our office can develop an estimate for this
project once detailed plans have been made available to the district.
• The district may respond with more specific comments and requirements once detailed
building and utility plans are available.
• A final inspection is required of all new construction being served by ACSD. The final
accounting of the related total connection charges occurs at the that time.
Undersigned acknowledges that Basic Standard Requirements have been read and understood.
Each development may be subject to additional requirements, specific to the development, upon
further detailed review, or as permit is amended or changed.
Signature: Date: 8.12.2024
Printed Name: Eric Violette
ACSD Use Only
Approved by: Date:
RECEIVED
ACSD Standard Requirements to Serve-Revised 2024 Page 2 O P$/19/2024
ASPEN
BUILDING DEPARTMENT