Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.688 Spruce St.0119-2020-BRES (10)
PROJECT NOTES >Dashed line represents outline of in-floorfin-ceiling radiant zone.See Hydronic E Schedule for tubing diameter,loop lengths,loop count and spacing.No radiant tubing allowed under refrigerators,coolers,freezers or other similar E s o u a c s appliances.No radiant tubing allowed in mechanical or NV spaces.See GROUP a'n c sheet M203 for installation details. Olnstall boiler per manufacturer's recommendations,including:access reginc.com • 970.349.1216 O clearances,vent pipe sizes/materials,system fill water quality,electrical disconnect,etc.Slope vents back to boiler.Route condensate drain to floor Odrain/sink in Mech B Room,and provide condensate neutralization kit. Consulting Engineers Clearly label all equipment with ID tags shown in these plans and provide Mechanical • Structural • Energy Center grille with opening above appropriate access for installation and maintenance,typ. O Symbol represents a typical flush-mounted radiant zone manifold with access p 1 panel.Arrows denote recommended access direction.See sheet M203 for �„ installation details.Coordinate locations and accesspanel detailing with O. al�� � 9 efficiency sustainability simplicity �O S•i' I OArchltect F G H I J 5 Hatched area represents outline of 1n-slab radiant snowmelt zone.See 18 , =_= Hydrome Schedule for tubing diameter,loop lengths,loop count and spacing. 0 please recycle these drawings e See sheet M203 for installation details. _ Transtion Ducts from Drop 6 Where radiant zones have steps in elevation,are isolated by walls within that ®1'2 OF2M , � �,. / Ceiling Into Structure typ O • I zone,and/or consist h different floor finishes,provide dedicated,balanceable "_r,/- a 12'inside clear drop for ductwork for each uni ue section of that zone,t ' t /140.! . �_-_ YI li _ a��IMI ., (a, --il O8 Install Thermstats on interior waafsoucesoealeeIrin - Oclutrohw )[ edwRRR to r. • / /0/© 1/-. —=yam '® MD-2 at RA connection to Au Provide cable actuated balancing damper at each take off from trunk duct or a i,_ ._= - , Ih`• 11 ' • v minimum o11 a from grille.Cable controller to be located behind grille to -�� �® Family Room • W ' �j x1-----------:: �� PPHC-1 on ne cal OA duct.MD-1 upstream re PHC-1. minimize cable run length. M101of t '• ® 8 =/elite _ nical OA duct.PHC-1 downstream of MD-1. 10 Ducts routed in/through structure above. :; �, mil. Bunk 60 *— ' RF 1'�EF-1 I �. -' - 11 Penetration location is coordinated with Structural Engineer. 0 • ll . ' . t ® I e I�Ititi / - I —• �m® 1 _ �� , �\ 12 Ducts routed in drop ceiling cavity above. © �I/ 00 „I�� S7 C iliffl_ 60 CFM ( 1 ) 13 Duct to/from above/below,typ. i -�- s�� �� 40 CFM - HW_t.-,� o`a� , 8 ' v 12 x4 �•, _ R� rl� , ��I ® Insulate OA duct withaminimum of 2"duct wrap(R-6)to avoid condensation. _ 3 �_lu a • � 40CFM 10• �x jP'■ , -- * m 40 CFM --' ©_- _ - -- - - T ® 12"x4 ,' •ERV 2mProvide 4 of flex duct or acoustical lining at duct connections to grilles GoIdfarb O _ 'p. __ _'___I i. 1 ' 116 Fireplace system by others.Provide exhaust,combustion and make up airV�•��I, S1 / _ .1 1 - i 1 i01RI•© Oas necessa for the s cified e ui ment to meet code and manufacturer�'6 -� 12'x4" 1 ry Pe qp p (.1lpn p^edl•♦s _ EF1_- / �- \ m Mzo3 B1 requirements,typ. ReSIdeI ICe�°°: '' _ �� �:- i <� - 22"xi �' �©� 17 Space reserved for hydronic equpment(pumps,radiant manifolds,valves, p:eity AI*, °°�:°' 6g1. �^ �{� ¢- Q- p - �LII A' I 0 Oeerminite tanks,etc.) �- 1'1I' ��^ -� �//,�I1�I r�I 111I ��/ 18 Terminate all vents a minimum of 36"above ad'acent rode.Maintain __�I -'®' - 1 9,// minimum se oration of 101inear feet behveen all EA vent terminations ggq0♦q. sqggga ,. /� _ _ _ 2 - 20., I s,i iT 7 P,♦ e� ♦em♦♦ O 1 "x4" '--- -- x1A A 7� I • and OA intakes. °q♦Ooy♦q�a!�!, ♦,♦ .: • au Il -- --- y �I-_ICI s ♦°HH♦°O°♦q� / r � 'v 1�►' �! ' � '-EF-4 .•I M203 ♦♦ppgsp♦ggsp�e �e� ` "�y Powde%.�I _� � - � ,pF; 19 Spa design and detailing by others. .,.q.♦,q,..<.,°,., —_ 5 688 Spruce St. ♦♦O♦♦sOsO♦gq♦♦°i♦♦ p 1 tu -,�°� Close�twe tech" '• Electrical Panels.See Electrical Plans, r-� ♦::♦°♦°Ji•®�ii°i:♦♦♦aa ,o:. Transitionduct crossing and up tbrck down to ®:. '� - J -__ III II typ. Aspen, CO .�♦♦♦qJ♦ a°♦°♦o ♦♦ 9 - -- -- row -14"x10^ ii s°♦♦♦qi q°�I�°q♦°q°iJ° •moo, WC-1 "' B •°♦♦`♦♦♦°�♦®♦♦♦'♦ `..... "t P Project Number 3033 °°°°°°°q°°qiq♦°qq° - -- 1-� 16 insidecleardro in ��°°�°♦1a j `^i ERV2i I' •./ )�6s ®,���q♦��� __ L-_- E io`i close[far equipment ♦�♦e• ♦♦s♦♦♦e♦ :: :♦♦�q,®:♦:i5=::°Snowmelt Sensor ear s a Q� - -� ,M203 _ Engineered By Garrett McCaffety PE ;:� �♦ h*�1"� • ••m1I6'x6"22— Reviewed By August Hasz PE sxs' /•- �. • 15EP :"" � x y^�.� 2oocMO200 CFMIlilt m • O �.� 12"x4'• O /fit, ��r/ �,1 - `/ONAIEN • _11111) i,Bath 3 I • 01/07/21 �, illy ill_ II I�� 1� - - • ®-6I CFM- - ■11`, - - - 10 Boiler Vents and Outside I Air duct to above ,G� I 12 x4^ - I I �a � ■ !003' I I - II � O I I' Dryer Vent x 2ti•. I) AHU-1 Return Air i i i RECEIVED ERV-1 ..:9i"`< /-- 1,, �.�• � �' AHU-1 Supply Air 8"inside clear drop for ductwork L-1"F- 1�^� 08/06/2021 _ ___ Issued for Date `-r`II' F Exhaust stack to above ^ ^v ASPEN _it BUILDINGDEPARTMENT 50%DD 07-15-20 ,� 1 `.`/ i�,%�'' 12 �1 � 100%DD 08-21-20 �`A ,�- _ y Guest Master Permit Set 10-16-20 ‘b#4711, •? I CDs 01-07-21 ! 'ay • \I FW I Permit Revision Set 03-09-21 Outside Air Damper(MD-1) '�• •"••' oaf- Y 11 1 60 CFM«M / it 1 1 I, `f' AHU-1 H-1 12"x4" ' rieVrig�41 �I i rl 111 -.. l- i MD-2(RA motorized damper) Lined Rectangular supply and 06/2021� Pre Heat Coil(PHC-1) ' �/✓ exhaust Ductwork to/from ERV • -n w AHU-1 Return Plenum(RA and OA connections) HI N 6"xe' RV-3� Bath 2 , � ���EEEE ��� � denism 16"inside clear drop in "x6171,1 I 10"x4" t" RP-4 go 60 CFM closet for equipment '" 6„xs„ j.12"x4" OMech Room ISO ® M203 I ®160CFM - I N.T.S. P" L 12"x4" _ -•/ 12 - 12 OF GO H Q Lower Level Mech 3/16" = 11-0 lt Lower Level Mech Plan M1O1