HomeMy WebLinkAboutFile Documents.1315 Sage Ct.0082-2021-BRES (22) 2015 IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM
CITY OF ASPEN VERSION 11,3 UPDATED DEC EMBER ,13, 2017
PROJECT ADDRESS: 1315 SAGE COURT
Parcel ID#: 273501303002 Permit Number:
CONTACT INFORMATION :
Owner:
Name: KAREN+MATT JOHNSON City: FORT WORTH
Address: 1317 THOMAS PLACE State: TEXAS
Email: MATT@LANG-PARTNERS.COM Zip Code: 76107
Phone: Cell Phone:
Owner's Representative:
Name: ZONE 4 ARCHITECTS,LLC City: ASPEN
Address: 432A EAST HYMAN AVE State: COLORADO
Email: TIM@ZONE4ARCHITECTS.COM Zip Code: 81611
Phone: 970.429.8470 Cell Phone:
A. RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM
Sheets showing snowmelt, pool,spa,and solar/GSHP information: A107, M2-2
Do you have snowmelt or a spa that has been exempted by the buiding official? @ Yes(enter sqft below on the exempt row) 0 No
Hydro Snowmelt Electric Snowmelt Pool Spa
Existing 2581.00 sqft
To be Demoed 0.00 sqft
Existing to Remain 2581.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
New(non-exempt) 1588.75 sqft
New(exempt) 64.00 sqft
Total New 1588.75 sqft 0.00 sqft 0.00 sqft 64.00 sqft J
Total on site 4169.75 sqft 0.00 sqft 0.00 sqft 64.00 sqft
Total Snowmelt on site 4169.75 sqft
Boiler Efficiency 95.0% I 100% 95.0% 95.0%
Mitigation Payment_ _ $56,860.53 $ - $ -
Total Payment for Mitigation: $ 56,860.53
B. ON-SITE RENEWABLE CREDITS
Supplemental System _ REMP Credit
Use PV Worksheet Photovoltaic System $ 87,065.92
Use Thermal Worksheet Hot Water Panels $Use GSHP Cert Ground Source Heat Pump $ -
Other Approved System $ -
Total Mitigation Credits: $ 87,065.92
Onsite Renewable Offsets: How many Kilo Watts of PV(solar electric)would I need? 8.28
or How many square feet of SHW(solar hot water)would I need? 253.11
R-REMP Payment: $ -
Amount Previously Paid on This Permit:
TOTAL R-REMP PAYMENT: $ -
Refund(includes minus$750): $C. PREPARED BY: Date: 9/20/2021
Print Name: Colleen Loughlin
Signature:
Phone&EMail: 970.429.8470 colleen@zone4architects.com RECEIVEDREVIEWED: Date:
11/30/2021
ASPEN
BUILDING DEPARTMENT
PV WORKSHEET
CITY OF ASPEN VERSION 11..E UPDATED DECEMBER 13, 2017
PROJECT ADDRESS: 1315 Sage Court,Aspen
Parcel ID#: 273501303002 Permit Number:
Collector Solar
Aspect,Degrees Collector Tilt, Orientatio
from True South Degrees From Adjustme DC side capacity Inverter capacity kW for kW Mitigation
Horizontal Factor (kW) (kW) credit Credit
Collector Group 1 10 6 38.5 99.80'0 2.55 2.55 2.55 2.54 kW
Collector Group 2 55 11 38.5 91.90'/0 4.675 4.675 4.675 4.30 kW
Collector Group 3 35 4 37 96.40',. 1.7 1.7 1.7 1.64 kW
Collector Group 4 55 14 34 92.70'0 5.95 5.95 5.95 5.52 kW
Collector Group 5 55 12 14 90.00''0 5.1 5.1 5.1 4.59 kW
Collector Group 6 87.00'.. 0 0.00 kW
Collector Group 7 87.00', 0 0.00 kW
Collector Group 8 87.00'0 �� ,`�� 0 0.00 kW
Collector Group 9 87.00°0 0 0.00 kW
Collector Group 10 87.00% 0 0.00 kW
Collector Group 11 87.00% 0 0.00 kW
Collector Group 12 I 87.00% 0 0.00 kW
Collector Group 13 87.00% 0 0.00 kW
Collector Group 14 87.00% 0 0.00 kW
Collector Group 15 I 87.00% 0 0.00 kW
Collector Group 16 87.00% I 0.00 kW
Collector Group 17 87.00% I 0.00 kW
Collector Group 18 I87.00% 0 0.00 kW
Collector Group 19 87.00% 0 0.00 kW
Collector Group 20 87.00% I0 0.00 kW
Total: 18.59 kW
$Mitigation Credit: $ 127,596.61
Instructions:
1) Determine how many collector groups you have.Groups are used to differentiate between collectors
(panels)with different tilts,aspects,sizing,or inverters. If all your collectors are installed similarily,you
might have just one group.
2) Enter the aspect and tilt for each group.The solar orientation adjustment factor is automatically
calculated.
3) DC side capacity is the total labled panel output kW in a group.
4) Inverter capacity is the recommended input power in kW of your inverter(s).
5) You will be given credit for the lesser of the labeled panel output or the inverter.
6) The kW for credit is multiplied by the solar orientation adjustment factor to get kW mitigation credit.
7) The kW mitigation credit is totalled and multiplied by$6865.32/kW to get the$Mitigation Credit
8) The mitigation credit will be automatically entered into your RREMP or CREMP form.If your project has both RREMP and
CREMP,it will automatically divide the credits up,with priority given to mitigating the CREMP payment.
Your inverter
PREPARED BY: Date: 9/13/2021 capacities are the
same as your DC
Print Name: Greg Pe rson,Sunse se,Inc.
capacities, which is
Signature: 1 .7 'c incorrect. This should
Phone&EMail: 970.963.1420;greg@sunsensesolar.com be the max continuous
REVIEWED: Date: power output of the
microinverter x
number of panels per
group. Revise the PV
worksheet
accordingly.
RECEIVED
11/30/2021
ASPEN
BUILDING DEPARTMENT