Loading...
HomeMy WebLinkAboutFile Documents.1315 Sage Ct.0082-2021-BRES (23) 2015 IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM CITY OF ASPEN VERSION 11.3 UPDATED MARCH 18, 2021, PROJECT ADDRESS: 1315 SAGE COURT Parcel ID#: 273501303002 Permit Number: 0082-2021-BRES CONTACT INFORMATION : Owner: Name: KAREN+MATT JOHNSON City: FORT WORTH Address: 1317 THOMAS PLACE State: TEXAS Email: MATT@LANG-PARTNERS.COM Zip Code: 76107 Phone: Cell Phone: Owner's Representative: Name: ZONE 4 ARCHITECTS,LLC City: ASPEN Address: 432A EAST HYMAN AVE State: COLORADO Email: TIM@ZONE4ARCHITECTS.COM Zip Code: 81611 Phone: 970.429.8470 Cell Phone: A. RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM Sheets showing snowmelt, pool,spa,and solar/GSHP information: A107, M2-2 Do you have snowmelt or a spa that has been exempted by the buiding official? @ Yes(enter sqft below on the exempt row) 0 No Hydro Snowmelt Electric Snowmelt Pool Spa Existing 2581.00 sqft To be Demoed Existing to Remain 2581.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft New(non-exempt) 1588.75 sqft New(exempt) 64.00 sqft Total New 1588.75 sqft 0.00 sqft 0.00 sqft 64.00 sqft J Total on site 4169.75 sqft 0.00 sqft 0.00 sqft 64.00 sqft Total Snowmelt on site 4169.75 sqft Boiler Efficiency 95.0% I 100% 75.0% 75.0% Mitigation Payment_ _ $56,860.53 $ - $ - Total Payment for Mitigation: $ 56,860.53 B. ON-SITE RENEWABLE CREDITS Solar removed from project scope dit 3 VDC IIICI II ICII VVVI I\ IICCI I WL VVQIGI 10IIGI0 W - Use GSHP Cert Ground Source Heat Pump $ - _ Other Approved System $ - Total Mitigation Credits: 104,779.33 Onsite Renewable Offsets: How many Kilo Watts of PV(solar electric)would I need? 8.28 or How many square feet of SHW(solar hot water)would I need? 253.11 R-REMP Payment: $ 56,860.53 _ Amount Previously Paid on This Permit: TOTAL R-REMP PAYMENT: $ - Refund(includes minus$750): $C. PREPARED BY: Date: 02.28.22 Print Name: TIM ANDRULAITIS Signature: Phone&EMail: TIM@ONE4ARCHITECTS.COM 970.429.8470 REVIEWED: JH Date: 2/28/22 PV WORKSHEET CITY OF ASPEN VERSION 113 UPDATED MARCH 18,2021 PROJECT ADDRESS: 1315 SAGE CT Parcel ID#: 273501303002 Permit Number: 0082-2021-BRES Collector Solar Aspect, Collector Tilt, Orientation Degress from Degrees From Adjustment DC side capacity Inverter capacity kW for kW itigation True South Horizontal Factor (kW) (kW) credit Credit Collector Group 1I 10 38.5 99.80% 2.55 2.094 2.094 2.09 kW Collector Group 2 55 38.5 91.90% 4.675 3.839 3.839 3.53 kW Collector Group 3 35 37 96.40% 1.7 1.396 1.3•• 1.35 kW Collector Group 4 55 34 92.70% 5.95 4.886 4 486 4.53 kW Collector Group 5 55 14 90.00% 5.1 4.188 4.188 3.77 kW Collector Group 6 87.00% 0 0.00 kW Collector Group 7 87.00% 0 0.00 kW Collector Group 8 87.00% 0 0.00 kW Collector Group 9 "'""' 0 0.00 kW Collector Group 10 Isolar removed from project scope 0 0.00 kW Collector Group 11 0 0.00 kW Collector Group 12 87.00% 0 0.00 kW Collector Group 13 87.00% 0 0.00 kW Collector Group 14 87.00% 0 0.00 kW Collector Group 15 87.00% 0 0.00 kW Collector Group 16 87.00% 0 0.00 kW Collector Group 17 87.00% 0 0.00 kW Collector Group 18 87.00% 0 0.00 kW Collector Group 19 87.00% 0 0.00 kW Collector Group 20 87.00% 0 0.00 kW Total: 15.26 kW $Mitigation Credit: $ 104,779.33 Instructions: 1) Determine how many collector groups you have.Gro •s are used to differentiate between collectors (panels)with different tilts,aspects,sizing,or inve r rs.If all your collectors are installed similarily,you might have just one group. 2) Enter the aspect and tilt for each group.The s• -r orientation adjustment factor is automatically calculated. 3) DC side capacity is the total labled panel •.tput kW in a group. 4) Inverter capacity is the maximum contin •us power output in kW of your inverter(s). 5)You will be given credit for the lesser. the labeled panel output or the inverter. 6)The kW for credit is multiplied by th= solar orientation adjustment factor to get kW mitigation credit. 7)The kW mitigation credit is totalle. and multiplied by$6865.32/kW to get the$Mitigation Credit 8)The mitigation credit will be aut• atically entered into your RREMP or CREMP form.If your project has both RREMP and CREMP,it will automatically.vide the credits up,with priority given to mitigating the CREMP payment. PREPARED BY: Date: 02.28.22 Print Name: gr-•peterson Signaturz. Phone& ail: 970.963.1420 greg@sunsensesolar.com REV WED: JH Date: 2/28/22