Loading...
HomeMy WebLinkAboutFile Documents.1315 Sage Ct.0082-2021-BRES (35) 2015 IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM CITY OF ASPEN VERSION 11.3 UPDATED MARCH 18, 2021, PROJECT ADDRESS: 1315 SAGE COURT Parcel ID#: 273501303002 Permit Number: CONTACT INFORMATION : Owner: Name: KAREN+MATT JOHNSON City: FORT WORTH Address: 1317 THOMAS PLACE State: TEXAS Email: MATT@LANG-PARTNERS.COM Zip Code: 76107 Phone: Cell Phone: Owner's Representative: Name: ZONE 4 ARCHITECTS,LLC City: ASPEN Address: 432A EAST HYMAN AVE State: COLORADO Email: TIM@ZONE4ARCHITECTS.COM Zip Code: 81611 Phone: 970.429.8470 Cell Phone: A. RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM Sheets showing snowmelt, pool,spa,and solar/GSHP information: A107, M2-2 Do you have snowmelt or a spa that has been exempted by the buiding official? @ Yes(enter sqft below on the exempt row) 0 No Hydro Snowmelt Electric Snowmelt Pool Spa Existing 2853.75 sqft To be Demoed Existing to Remain 2853.75 sqft 0.00 sqft 0.00 sqft 0.00 sqft New(non-exempt) 1622.75 sqft New(exempt) 64.00 sqft Total New 1622.75 sqft 0.00 sqft 0.00 sqft 64.00 sqft J Total on site 4476.50 sqft 0.00 sqft 0.00 sqft 64.00 sqft Total Snowmelt on site 4476.50 sqft Boiler Efficiency_ 75.0% I 100% 75.0% 75.0% Mitigation Payment_ $73,564.67 $ - $ - Total Payment for Mitigation: $ 73,564.67 B. ON-SITE RENEWABLE CREDITS Supplemental System _ REMP Credit Use PV Worksheet Photovoltaic System $Use Thermal Worksheet Hot Water Panels $Use GSHP Cert Ground Source Heat Pump_ $ - Other Approved System_ $ - Total Mitigation Credits: $ - Onsite Renewable Offsets: How many Kilo Watts of PV(solar electric)would I need? 10.72 or How many square feet of SHW(solar hot water)would I need? 327.46 R-REMP Payment: $ 73,564.67 Amount Previously Paid on This Permit: TOTAL R-REMP PAYMENT: $ 73,564.67 Refund(includes minus$750): $C. PREPARED BY: Date: 05.06.2021 Print Name: ZONE 4 ARCHITECTS,LLC CIO COLLEEN LOUGHLIN Signature: Phone&EMail: COLLEEN@ZONE4ARCHITECTS.COM 970.429.8470 RE REVIEWED: Date: CE�VE 06/04/2021 ASPEN BUILDING DEPARTMENT