Certificate
Project Goldfarb
Energy Code: 2015 IECC
Location: Aspen, Colorado
Construction Type: Single-family
Project Type: New Construction
Conditioned Floor Area: 4,930 ft2
Glazing Area 34%
Climate Zone: 7 (9922 HDD)
Permit Date:
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
688 Spruce St MKNK, LLC CCY Architects Koru, Ltd
Aspen, Colorado 81661 Agent: Ben Genshaft Maura Trumble Brian Pearson
420 E Main St, Suite 210 970-927-4925 970-963-0577
Aspen, CO 81611
Compliance: Passes using UA trade-off
Compliance: 16.9%Better Than Code Maximum UA: 1311 Your UA: 1089
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area Cavity Cont.
Assembly or R-Value R-Value U-Factor UA
Perimeter
F4-Outdoor Room: Flat Ceiling or Scissor Truss 455 49.0 0.0 0.026 12
R2 - Garage Flat: Flat Ceiling or Scissor Truss 385 34.0 15.0 0.022 8
R2 - Central Flat: Flat Ceiling or Scissor Truss 625 34.0 15.0 0.022 14
R1 - Living Wing: Raised or Energy Truss 2,065 34.0 15.0 0.020 41
R1 - Master Wing: Raised or Energy Truss 1,092 34.0 15.0 0.020 22
R1 -Garage: Raised or Energy Truss 776 34.0 15.0 0.020 16
W5: Wood Frame, 16" o.c. 781 20.0 4.0 0.046 20
004B: Glass Door(over 50%glazing) 83 0.270 22
003A: Glass Door(over 50%glazing) 120 0.270 32
010: Metal Frame w/Thermal Break 22 0.280 6
004: Metal Frame w/Thermal Break al
11 0.280 3
7�005: Metal Frame w/Thermal Break 36 0.260 9
006: Metal Frame w/Thermal BreakI)) 11 0.280 3
007: Metal Frame w/Thermal Break 29�21 11 0.280 3
e��
008: Metal Frame w/Thermal Break MX1AINCE 36 0.260 9
009: Metal Frame w/Thermal Break MOZINGO/DAM 11 0.280 3
W6,6B,&7: Wood Frame, 16" o.c. 3,951 13.0 10. r 0' MED
100A: Solid Door(under 50%glazing) 35 . ..i
Project Title: Goldfarb Report d �/Vg2pn21
Data filename: Page 1 of11
ASPEN
BUILDING DEPARTMENT
Gross Area Cavity Cont.
Assembly or R-Value R-Value U-Factor UA
Perimeter
101C: Solid Door(under 50%glazing) 68 0.080 5
Door 1: Solid Door(under 50%glazing) 68 0.080 5
101B: Solid Door(under 50%glazing) 68 0.080 5
112A: Glass Door(over 50%glazing) 28 0.280 8
105A: Glass Door(over 50%glazing) 22 0.430 9
106A: Glass Door(over 50%glazing) 22 0.430 9
108A: Glass Door(over 50%glazing) 253 0.270 68
108B: Glass Door(over 50%glazing) 58 0.280 16
101A: Glass Door(over 50%glazing) 22 0.280 6
101D: Glass Door(over 50%glazing) 56 0.280 16
102A: Glass Door(over 50%glazing) 20 0.280 6
200A: Glass Door(over 50%glazing) 56 0.280 16
101: Metal Frame w/Thermal Break 23 0.280 6
102: Metal Frame w/Thermal Break 23 0.280 6
103: Metal Frame w/Thermal Break 23 0.280 6
104: Metal Frame w/Thermal Break 23 0.280 6
105: Metal Frame w/Thermal Break 31 0.280 9
106: Metal Frame w/Thermal Break 9 0.290 3
107: Metal Frame w/Thermal Break 9 0.290 3
109: Metal Frame w/Thermal Break 9 0.290 3
108: Metal Frame w/Thermal Break 9 0.290 3
110: Metal Frame w/Thermal Break 4 0.300 1
111: Metal Frame w/Thermal Break 4 0.340 1
114: Metal Frame w/Thermal Break 14 0.280 4
115: Metal Frame w/Thermal Break 14 0.280 4
116a: Metal Frame w/Thermal Break 35 0.280 10
116b: Metal Frame w/Thermal Break 12 0.280 4
117: Metal Frame w/Thermal Break 74 0.270 20
118a: Metal Frame w/Thermal Break 35 0.280 10
118b: Metal Frame w/Thermal Break 12 0.280 4
119: Metal Frame w/Thermal Break 11 0.290 3
120: Metal Frame w/Thermal Break 23 0.280 7
122: Metal Frame w/Thermal Break 11 0.280 3
121: Metal Frame w/Thermal Break 11 0.280 3
123: Metal Frame w/Thermal Break r,..,„
34 0.280 9
124: Metal Frame w Thermal Break34 0.280 9
125: Metal Frame w/Thermal Break 2 9/21 I 34 0.280 9
126: Metal Frame w/Thermal Break FORCOMCOIAPIANCE
11 0.280 3
127: Metal Frame w/Thermal Break MOZINGO/DAM 35
128: Metal Frame w/Thermal Break 11 . IV ED
Project Title: Goldfarb Report 456/1162p2621
Data filename: Page 2 of11
ASPEN
BUILDING DEPARTMENT
Gross Area Cavity Cont.
Assembly or R-Value R-Value U-Factor UA
Perimeter
129: Metal Frame w/Thermal Break 54 0.280 15
130: Metal Frame w/Thermal Break 15 0.280 4
131: Metal Frame w/Thermal Break 15 0.280 4
132: Metal Frame w/Thermal Break 15 0.280 4
133: Metal Frame w/Thermal Break 10 0.280 3
134: Metal Frame w/Thermal Break 30 0.280 8
135: Metal Frame w/Thermal Break 10 0.280 3
136: Metal Frame w/Thermal Break 14 0.280 4
137: Metal Frame w/Thermal Break 12 0.280 3
138: Metal Frame w/Thermal Break 19 0.280 5
139: Metal Frame w/Thermal Break 9 0.280 3
200: Metal Frame w/Thermal Break 12 0.280 3
W3: Solid Concrete or Masonry 919 20.0 7.0 0.041 29
004C: Glass Door(over 50% glazing) 131 0.280 37
011: Metal Frame w/Thermal Break 14 0.280 4
012: Metal Frame w/Thermal Break 20 0.280 5
013: Metal Frame w/Thermal Break 25 0.250 6
014: Metal Frame w/Thermal Break 14 0.280 4
003E Door jamb: Slab-On-Grade (Unheated) 13 0.0 1.042 14
Insulation depth: 0.0'
Fl - Living Wing: Slab-On-Grade (Unheated) 80 10.0 0.684 55
Insulation depth: 4.0'
004B Doorjamb: Slab-On-Grade (Unheated) 9 0.0 1.042 9
Insulation depth: 0.0'
Garage Doorjamb: Slab-On-Grade (Heated) 20 0.0 1.042 21
Insulation depth: 0.0'
Fl -Garage: Slab-On-Grade (Heated) 78 10.0 0.684 53
Insulation depth: 4.0'
W2 - Below Grade: Solid Concrete or Masonry EV Dre-twe-0 3,567 12.0 15.0 0.032 112
Wall height: 12.0' U
Depth below grade: 11.5'
Insulation depth: 10.0' 7/29/21
001: Metal Frame w/Thermal Break 19 0.280 5
002: Metal Frame w/Thermal Break FORCOMCOMPLIANCE 19 0.250 5
003: Metal Frame w/Thermal Break MOZINGO/DA. 19 0.250 5
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in
REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Garrett McCaffety, PE - Mechanical Engineer C "L 319/21
Name-Title Signature Date
Project Notes:
Lower level sliding glass doors 004B and 003A have jambs that complicate the slab perimeter insulation detail. This
is accounted for in RESCheck and appears in the foundation constructions section. Same applies to the slab at the
garage door.
RECEIVED
Project Title: Goldfarb Report df56/1162p2621
Data filename: Page 3 of11
ASPEN
BUILDING DEPARTMENT
REScheck Software VersionChecklist: REScheck-Web
Energy Code: 2015 IECC
Requirements: 0.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section Plans Verified Field Verified
# Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions
& Req.ID
103.1, Construction drawings and Complies
103.2 documentation demonstrate Does Not
[PR1]1 energy code compliance for the
building envelope.Thermal ❑Not Observable
envelope represented on ❑Not Applicable
construction documents.
103.1, ;Construction drawings and ❑Complies
103.2, documentation demonstrate ❑Does Not
403.7 energy code compliance for
[PR3]1 lighting and mechanical systems. ['Not Observable
fil, Systems serving multiple ENot Applicable
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
302.1, Heating and cooling equipment is Heating: Heating: ❑Complies 1
403.7 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not
[PR2]2 on loads calculated per ACCA Cooling: Cooling:
Manual J or other methods ['Not Observable
Btu/hr Btu/hr
approved by the code official. ❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) RECEIVED
Project Title: Goldfarb Report df56/1162/12621
Data filename: Page 4 of11
ASPEN
BUILDING DEPARTMENT
Section Plans Verified Field Verified
# Foundation Inspection Value Value Complies? Comments/Assumptions
& Req.ID
402.1.2 Slab edge insulation R-value. R- R- ❑Complies See the Envelope Assemblies
[FO1]1 ❑ Unheated ❑ Unheated ElDoes Not table for values.
.o ❑ Heated ❑ Heated [Not Observable
ENot Applicable
402.1.2 Slab edge insulation ft ft EComplies See the Envelope Assemblies
[FO3]1 depth/length. ❑Does Not table for values.
['Not Observable
1 ❑Not Applicable
402.1.1 Conditioned basement wall R- R- ❑Complies See the Envelope Assemblies
[FO4]1 insulation R-value.Where interior R- R- ❑Does Not table for values.
• insulation is used, verification ['Not Observable
may need to occur during
Insulation Inspection. Not ❑Not Applicable
required in warm-humid locations
in Climate Zone 3.
303.2 Conditioned basement wall ❑Complies
[FO5]1 insulation installed per ❑Does Not
O manufacturer's instructions. ['Not Observable
❑Not Applicable
402.2.9 Conditioned basement wall ft ft ❑Complies See the Envelope Assemblies
[FO6]1 insulation depth of burial or ❑Does Not table for values.
�, distance from top of wall.
❑Not Observable
❑Not Applicable
303.2.1 A protective covering is installed ❑Complies
[FO11]2 to protect exposed exterior ❑Does Not
insulation and extends a
minimum of 6 in. below grade. ['Not Observable
❑Not Applicable
403.9 Snow-and ice-melting system ❑Complies
[FO controls installed. ❑Does Not
['Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) RECEIVED
Project Title: Goldfarb Report 456/1162/12621
Data filename: Page 5 of11
ASPEN
BUILDING DEPARTMENT
Section Plans Verified Field Verified
# Framing / Rough-In Inspection Value Value Complies? Comments/Assumptions
& Req.ID
402.1.1, ;Door U-factor. U- U- ❑Complies See the Envelope Assemblies
402.3.4 ❑Does Not table for values.
[FR1]1 ['Not Observable
41)
❑Not Applicable
402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies See the Envelope Assemblies
402.3.1, average). ❑Does Not table for values.
402.3.3,
402.5 [Not Observable
[FR2]1 ❑Not Applicable
303.1.3 U-factors of fenestration products ❑Complies
[FR4]1 are determined in accordance ❑Does Not
with the NFRC test procedure or [Not Observable
taken from the default table.
❑Not Applicable
402.4.1.1 Air barrier and thermal barrier ❑Complies
[FR23]1 installed per manufacturer's ❑Does Not
instructions. [Not Observable
❑Not Applicable
402.4.3 Fenestration that is not site built ❑Complies
[FR20]1 is listed and labeled as meeting ❑Does Not
0 AAMA/WDMA/CSA 101/I.S.2/A440 [Not Observable
or has infiltration rates per NFRC
400 that do not exceed code ❑Not Applicable
limits.
1181/1/74 IC-rated recessed lighting fixtures ❑Complies
[FR16]2 sealed at housing/interior finish ❑Does Not
and labeled to indicate <_2.0 cfm
leakage at 75 Pa. [Not Observable
❑Not Applicable
403.3.1 Supply and return ducts in attics ❑Complies
[FR12]1 insulated >= R-8 where duct is ❑Does Not
>= 3 inches in diameter and >=
qte
R-6 where < 3 inches. Supply and ❑Not Observable
return ducts in other portions of ❑Not Applicable
the building insulated >= R-6 for
diameter>= 3 inches and R-4.2
for< 3 inches in diameter.
403.3.5 :Building cavities are not used as EComplies
[FR15]3 ducts or plenums. ❑Does Not
J ['Not Observable
❑Not Applicable
403.4 HVAC piping conveying fluids R R ❑Complies
[FR above 105 °F or chilled fluids ❑Does Not
below 55 °F are insulated to
3 ['Not Observable
❑Not Applicable
403.4.1 :Protection of insulation on HVAC ❑Complies
[FR24]1 piping. ❑Does Not
[Not Observable
❑Not Applicable
403.5.3 Hot water pipes are insulated to R- R- ❑Complies
[FR18]2 >_R-3. ❑Does Not
Ql ['Not Observable
❑Not Applicable
4. Automatic or gravity dampers are ❑Complies
]2 installed on all outdoor air ❑Does Not
intakes and exhausts.
1.1 ❑Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) RECEIVED
Project Title: Goldfarb Report dfSE/1lg2/12621
Data filename: Page 6 of11
ASPEN
BUILDING DEPARTMENT
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) RECEIVED
Project Title: Goldfarb Report 456/1162 - 21
Data filename: Page 7 ofll
ASPEN
BUILDING DEPARTMENT
Section Plans Verified Field Verified
# Insulation Inspection Value Value Complies? Comments/Assumptions
& Req.ID
303.1 ;All installed insulation is labeled '❑Complies
[IN13]2 or the installed R-values ❑Does Not
provided. •
lot
Observable
❑Not Applicable
402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies
402.2.5, mass wall with at least 1/2 of the ❑ Wood ❑ Wood ❑Does Not table for values.
402.2.6 wall insulation on the wall ❑ Mass ❑ Mass [Not Observable
[IN3]1 exterior,the exterior insulation
4 requirement applies(FR10). ❑ Steel ❑ Steel ❑Not Applicable
303.2 :Wall insulation is installed per ❑Complies
[IN4]1 manufacturer's instructions. ❑Does Not
❑Not Observable
j ❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) RECEIVED
Project Title: Goldfarb Report 456/1162/12621
Data filename: Page 8 of11
ASPEN
BUILDING DEPARTMENT
Section Plans Verified Field Verified
# Final Inspection Provisions Value Value Complies? Comments/Assumptions
& Req.ID_
402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies
402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values.
402.2.2, j ❑ Steel ❑ Steel [Not Observable
402.2.6
[FI1]1 ENot Applicable
303.1.1.1, Ceiling insulation installed per ❑Complies
303.2 manufacturer's instructions. ❑Does Not
[F12]1 Blown insulation marked every
300 ft2. ENot Observable
ENot Applicable
402.2.3 !Vented attics with air permeable EComplies
[F122]2 insulation include baffle adjacent ❑Does Not
to soffit and eave vents that
;extends over insulation. ❑Not Observable
j ❑Not Applicable
402.2.4 Attic access hatch and door R- R- EComplies
[F13]1 insulation >_R-value of the ❑Does Not
adjacent assembly.
[Not Observable
❑Not Applicable
402.4.1.2 :Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = EComplies
[F117]1 ach in Climate Zones 1-2, and ❑Does Not
I<=3 ach in Climate Zones 3-8.
ENot Observable
j ENot Applicable
403.3.4 Duct tightness test result of<=4 cfm/100 cfm/100 EComplies
[F14]1 cfm/100 ft2 across the system or ft2 ft2 ❑Does Not
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in ['Not Observable
tests,verification may need to ENot Applicable
occur during Framing Inspection.
403.3.3 Ducts are pressure tested to cfm/100 cfm/100 EComplies
[F127]1 determine air leakage with ft2 ft2 Does Not
either: Rough-in test:Total
leakage measured with a ['Not Observable
pressure differential of 0.1 inch ENot Applicable
w.g. across the system including
the manufacturer's air handler
enclosure if installed at time of
test. Postconstruction test:Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer's air
handler enclosure.
403.3.2.1 Air handler leakage designated EComplies
[F124]1 by manufacturer at<=2%of ❑Does Not
design air flow.
[Not Observable
ENot Applicable
403.1.1 :Programmable thermostats EComplies
[F19]2 installed for control of primary ❑Does Not
j heating and cooling systems and
:initially set by manufacturer to ['Not Observable
:code specifications. ❑Not Applicable
i
403.1.2 Heat pump thermostat installed ❑Complies
[F110]2 on heat pumps. ❑Does Not
ENot Observable
❑Not Applicable
403.5. Circulating service hot water ❑Complies
[F111]z systems have automatic or EDoes Not
accessible manual controls.
qLlNOt Observable
i ENot Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) RECEIVED
Project Title: Goldfarb Report 456/1162/12621
Data filename: Page 9 of11
ASPEN
BUILDING DEPARTMENT
Section Plans Verified Field Verified
# Final Inspection Provisions Value Value Complies? Comments/Assumptions
& Req.ID
403.6.1 ;All mechanical ventilation system ' •Complies
[F125]z fans not part of tested and listed •Does Not
HVAC equipment meet efficacy
and air flow limits. •Not Observable
403.2 j Hot water boilers supplying heat ❑Complies
[F126]z through one-or two-pipe heating ❑Does Not
ailsystems have outdoor setback
control to lower boiler water ❑Not Observable
temperature based on outdoor ❑Not Applicable
j temperature.
403.5.1.1 Heated water circulation systems ❑Complies
[F128]2 have a circulation pump.The ❑Does Not
system return pipe is a dedicated
return pipe or a cold water supply [Not Observable
pipe. Gravity and thermos- ENot Applicable
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
41'occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
403.5.1.2 'Electric heat trace systems ❑Complies
[F129]z comply with IEEE 515.1 or UL El Does Not
515. Controls automatically
adjust the energy input to the ['Not Observable
heat tracing to maintain the ❑Not Applicable
desired water temperature in the
:piping.
403.5.2 Water distribution systems that 1 ❑Complies
[F130]z have recirculation pumps that EDoes Not
pump water from a heated water
supply pipe back to the heated ['Not Observable
water source through a cold ❑Not Applicable
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
:water piping to 104°F.
403.5.4 Drain water heat recovery units ❑Complies
[F131]z tested in accordance with CSA ❑Does Not
B55.1. Potable water-side
pressure loss of drain water heat [Not Observable
recovery units < 3 psi for ❑Not Applicable
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
404.1 75%of lamps in permanent ❑Complies
[F16]1 fixtures or 75%of permanent EDoes Not
fixtures have high efficacy lamps.
Does not apply to low-voltage ['Not Observable
lighting. ❑Not Applicable
404.1.1 Fuel gas lighting systems have ❑Complies
[F123]3 no continuous pilot light. EDoes Not
J 111 [Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) RECEIVED
Project Title: Goldfarb Report d �/9.762p2021
Data filename: Page 10 ofll
ASPEN
BUILDING DEPARTMENT
Section Plans Verified Field Verified
# Final Inspection Provisions Value Value Complies? Comments/Assumptions
& Req.ID
401.3 ;Compliance certificate posted. '❑Complies
[F17F ❑Does Not
1_ 111L1Not Observable
❑Not Applicable
303.3 'Manufacturer manuals for ❑Complies
[F118P mechanical and water heating ❑Does Not
systems have been provided.
[Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) RECEIVED
Project Title: Goldfarb Report dtlb/9.762p2021
Data filename: Page 11 of11
ASPEN
BUILDING DEPARTMENT
C2015 IECC Energy
IAEfficiency Certificate
Insulation Rating R-Value
Above-Grade Wall 23.00
Below-Grade Wall 27.00
Floor 10.00
Ceiling / Roof 49.00
Ductwork (unconditioned spaces): NA
Glass& Door Rating U-Factor SHGC
Window 0.27
Door 0.27
Heating&Cooling Equipment Efficiency
Heating System: Air Source Heat Pump 2.0-3.0 COP
Cooling System: Air Source Heat Pump 2.0-3.0 COP
Water Heater: ASHP + Boiler 2.0 COP
Name: Garrett McCaffety, PE Date: 03-09-21