Loading...
HomeMy WebLinkAboutFile Documents.688 Spruce St.0119-2020-BRES (23) GComplianceenerated by REScheck-Web Software Certificate Project Goldfarb Energy Code: 2015 IECC Location: Aspen, Colorado Construction Type: Single-family Project Type: New Construction Conditioned Floor Area: 4,930 ft2 Glazing Area 34% Climate Zone: 7 (9922 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 688 Spruce St MKNK, LLC CCY Architects Koru, Ltd Aspen, Colorado 81661 Agent: Ben Genshaft Maura Trumble Brian Pearson 420 E Main St, Suite 210 970-927-4925 970-963-0577 Aspen, CO 81611 Compliance: Passes using UA trade-off Compliance: 16.9%Better Than Code Maximum UA: 1311 Your UA: 1089 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont. Assembly or R-Value R-Value U-Factor UA Perimeter F4-Outdoor Room: Flat Ceiling or Scissor Truss 455 49.0 0.0 0.026 12 R2 - Garage Flat: Flat Ceiling or Scissor Truss 385 34.0 15.0 0.022 8 R2 - Central Flat: Flat Ceiling or Scissor Truss 625 34.0 15.0 0.022 14 R1 - Living Wing: Raised or Energy Truss 2,065 34.0 15.0 0.020 41 R1 - Master Wing: Raised or Energy Truss 1,092 34.0 15.0 0.020 22 R1 -Garage: Raised or Energy Truss 776 34.0 15.0 0.020 16 W5: Wood Frame, 16" o.c. 781 20.0 4.0 0.046 20 004B: Glass Door(over 50%glazing) 83 0.270 22 003A: Glass Door(over 50%glazing) 120 0.270 32 010: Metal Frame w/Thermal Break 22 0.280 6 004: Metal Frame w/Thermal Break al 11 0.280 3 7�005: Metal Frame w/Thermal Break 36 0.260 9 006: Metal Frame w/Thermal BreakI)) 11 0.280 3 007: Metal Frame w/Thermal Break 29�21 11 0.280 3 e�� 008: Metal Frame w/Thermal Break MX1AINCE 36 0.260 9 009: Metal Frame w/Thermal Break MOZINGO/DAM 11 0.280 3 W6,6B,&7: Wood Frame, 16" o.c. 3,951 13.0 10. r 0' MED 100A: Solid Door(under 50%glazing) 35 . ..i Project Title: Goldfarb Report d �/Vg2pn21 Data filename: Page 1 of11 ASPEN BUILDING DEPARTMENT Gross Area Cavity Cont. Assembly or R-Value R-Value U-Factor UA Perimeter 101C: Solid Door(under 50%glazing) 68 0.080 5 Door 1: Solid Door(under 50%glazing) 68 0.080 5 101B: Solid Door(under 50%glazing) 68 0.080 5 112A: Glass Door(over 50%glazing) 28 0.280 8 105A: Glass Door(over 50%glazing) 22 0.430 9 106A: Glass Door(over 50%glazing) 22 0.430 9 108A: Glass Door(over 50%glazing) 253 0.270 68 108B: Glass Door(over 50%glazing) 58 0.280 16 101A: Glass Door(over 50%glazing) 22 0.280 6 101D: Glass Door(over 50%glazing) 56 0.280 16 102A: Glass Door(over 50%glazing) 20 0.280 6 200A: Glass Door(over 50%glazing) 56 0.280 16 101: Metal Frame w/Thermal Break 23 0.280 6 102: Metal Frame w/Thermal Break 23 0.280 6 103: Metal Frame w/Thermal Break 23 0.280 6 104: Metal Frame w/Thermal Break 23 0.280 6 105: Metal Frame w/Thermal Break 31 0.280 9 106: Metal Frame w/Thermal Break 9 0.290 3 107: Metal Frame w/Thermal Break 9 0.290 3 109: Metal Frame w/Thermal Break 9 0.290 3 108: Metal Frame w/Thermal Break 9 0.290 3 110: Metal Frame w/Thermal Break 4 0.300 1 111: Metal Frame w/Thermal Break 4 0.340 1 114: Metal Frame w/Thermal Break 14 0.280 4 115: Metal Frame w/Thermal Break 14 0.280 4 116a: Metal Frame w/Thermal Break 35 0.280 10 116b: Metal Frame w/Thermal Break 12 0.280 4 117: Metal Frame w/Thermal Break 74 0.270 20 118a: Metal Frame w/Thermal Break 35 0.280 10 118b: Metal Frame w/Thermal Break 12 0.280 4 119: Metal Frame w/Thermal Break 11 0.290 3 120: Metal Frame w/Thermal Break 23 0.280 7 122: Metal Frame w/Thermal Break 11 0.280 3 121: Metal Frame w/Thermal Break 11 0.280 3 123: Metal Frame w/Thermal Break r,..,„ 34 0.280 9 124: Metal Frame w Thermal Break34 0.280 9 125: Metal Frame w/Thermal Break 2 9/21 I 34 0.280 9 126: Metal Frame w/Thermal Break FORCOMCOIAPIANCE 11 0.280 3 127: Metal Frame w/Thermal Break MOZINGO/DAM 35 128: Metal Frame w/Thermal Break 11 . IV ED Project Title: Goldfarb Report 456/1162p2621 Data filename: Page 2 of11 ASPEN BUILDING DEPARTMENT Gross Area Cavity Cont. Assembly or R-Value R-Value U-Factor UA Perimeter 129: Metal Frame w/Thermal Break 54 0.280 15 130: Metal Frame w/Thermal Break 15 0.280 4 131: Metal Frame w/Thermal Break 15 0.280 4 132: Metal Frame w/Thermal Break 15 0.280 4 133: Metal Frame w/Thermal Break 10 0.280 3 134: Metal Frame w/Thermal Break 30 0.280 8 135: Metal Frame w/Thermal Break 10 0.280 3 136: Metal Frame w/Thermal Break 14 0.280 4 137: Metal Frame w/Thermal Break 12 0.280 3 138: Metal Frame w/Thermal Break 19 0.280 5 139: Metal Frame w/Thermal Break 9 0.280 3 200: Metal Frame w/Thermal Break 12 0.280 3 W3: Solid Concrete or Masonry 919 20.0 7.0 0.041 29 004C: Glass Door(over 50% glazing) 131 0.280 37 011: Metal Frame w/Thermal Break 14 0.280 4 012: Metal Frame w/Thermal Break 20 0.280 5 013: Metal Frame w/Thermal Break 25 0.250 6 014: Metal Frame w/Thermal Break 14 0.280 4 003E Door jamb: Slab-On-Grade (Unheated) 13 0.0 1.042 14 Insulation depth: 0.0' Fl - Living Wing: Slab-On-Grade (Unheated) 80 10.0 0.684 55 Insulation depth: 4.0' 004B Doorjamb: Slab-On-Grade (Unheated) 9 0.0 1.042 9 Insulation depth: 0.0' Garage Doorjamb: Slab-On-Grade (Heated) 20 0.0 1.042 21 Insulation depth: 0.0' Fl -Garage: Slab-On-Grade (Heated) 78 10.0 0.684 53 Insulation depth: 4.0' W2 - Below Grade: Solid Concrete or Masonry EV Dre-twe-0 3,567 12.0 15.0 0.032 112 Wall height: 12.0' U Depth below grade: 11.5' Insulation depth: 10.0' 7/29/21 001: Metal Frame w/Thermal Break 19 0.280 5 002: Metal Frame w/Thermal Break FORCOMCOMPLIANCE 19 0.250 5 003: Metal Frame w/Thermal Break MOZINGO/DA. 19 0.250 5 Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Garrett McCaffety, PE - Mechanical Engineer C "L 319/21 Name-Title Signature Date Project Notes: Lower level sliding glass doors 004B and 003A have jambs that complicate the slab perimeter insulation detail. This is accounted for in RESCheck and appears in the foundation constructions section. Same applies to the slab at the garage door. RECEIVED Project Title: Goldfarb Report df56/1162p2621 Data filename: Page 3 of11 ASPEN BUILDING DEPARTMENT REScheck Software VersionChecklist: REScheck-Web Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & Req.ID 103.1, Construction drawings and Complies 103.2 documentation demonstrate Does Not [PR1]1 energy code compliance for the building envelope.Thermal ❑Not Observable envelope represented on ❑Not Applicable construction documents. 103.1, ;Construction drawings and ❑Complies 103.2, documentation demonstrate ❑Does Not 403.7 energy code compliance for [PR3]1 lighting and mechanical systems. ['Not Observable fil, Systems serving multiple ENot Applicable dwelling units must demonstrate compliance with the IECC Commercial Provisions. 302.1, Heating and cooling equipment is Heating: Heating: ❑Complies 1 403.7 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not [PR2]2 on loads calculated per ACCA Cooling: Cooling: Manual J or other methods ['Not Observable Btu/hr Btu/hr approved by the code official. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) RECEIVED Project Title: Goldfarb Report df56/1162/12621 Data filename: Page 4 of11 ASPEN BUILDING DEPARTMENT Section Plans Verified Field Verified # Foundation Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.2 Slab edge insulation R-value. R- R- ❑Complies See the Envelope Assemblies [FO1]1 ❑ Unheated ❑ Unheated ElDoes Not table for values. .o ❑ Heated ❑ Heated [Not Observable ENot Applicable 402.1.2 Slab edge insulation ft ft EComplies See the Envelope Assemblies [FO3]1 depth/length. ❑Does Not table for values. ['Not Observable 1 ❑Not Applicable 402.1.1 Conditioned basement wall R- R- ❑Complies See the Envelope Assemblies [FO4]1 insulation R-value.Where interior R- R- ❑Does Not table for values. • insulation is used, verification ['Not Observable may need to occur during Insulation Inspection. Not ❑Not Applicable required in warm-humid locations in Climate Zone 3. 303.2 Conditioned basement wall ❑Complies [FO5]1 insulation installed per ❑Does Not O manufacturer's instructions. ['Not Observable ❑Not Applicable 402.2.9 Conditioned basement wall ft ft ❑Complies See the Envelope Assemblies [FO6]1 insulation depth of burial or ❑Does Not table for values. �, distance from top of wall. ❑Not Observable ❑Not Applicable 303.2.1 A protective covering is installed ❑Complies [FO11]2 to protect exposed exterior ❑Does Not insulation and extends a minimum of 6 in. below grade. ['Not Observable ❑Not Applicable 403.9 Snow-and ice-melting system ❑Complies [FO controls installed. ❑Does Not ['Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) RECEIVED Project Title: Goldfarb Report 456/1162/12621 Data filename: Page 5 of11 ASPEN BUILDING DEPARTMENT Section Plans Verified Field Verified # Framing / Rough-In Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, ;Door U-factor. U- U- ❑Complies See the Envelope Assemblies 402.3.4 ❑Does Not table for values. [FR1]1 ['Not Observable 41) ❑Not Applicable 402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies See the Envelope Assemblies 402.3.1, average). ❑Does Not table for values. 402.3.3, 402.5 [Not Observable [FR2]1 ❑Not Applicable 303.1.3 U-factors of fenestration products ❑Complies [FR4]1 are determined in accordance ❑Does Not with the NFRC test procedure or [Not Observable taken from the default table. ❑Not Applicable 402.4.1.1 Air barrier and thermal barrier ❑Complies [FR23]1 installed per manufacturer's ❑Does Not instructions. [Not Observable ❑Not Applicable 402.4.3 Fenestration that is not site built ❑Complies [FR20]1 is listed and labeled as meeting ❑Does Not 0 AAMA/WDMA/CSA 101/I.S.2/A440 [Not Observable or has infiltration rates per NFRC 400 that do not exceed code ❑Not Applicable limits. 1181/1/74 IC-rated recessed lighting fixtures ❑Complies [FR16]2 sealed at housing/interior finish ❑Does Not and labeled to indicate <_2.0 cfm leakage at 75 Pa. [Not Observable ❑Not Applicable 403.3.1 Supply and return ducts in attics ❑Complies [FR12]1 insulated >= R-8 where duct is ❑Does Not >= 3 inches in diameter and >= qte R-6 where < 3 inches. Supply and ❑Not Observable return ducts in other portions of ❑Not Applicable the building insulated >= R-6 for diameter>= 3 inches and R-4.2 for< 3 inches in diameter. 403.3.5 :Building cavities are not used as EComplies [FR15]3 ducts or plenums. ❑Does Not J ['Not Observable ❑Not Applicable 403.4 HVAC piping conveying fluids R R ❑Complies [FR above 105 °F or chilled fluids ❑Does Not below 55 °F are insulated to 3 ['Not Observable ❑Not Applicable 403.4.1 :Protection of insulation on HVAC ❑Complies [FR24]1 piping. ❑Does Not [Not Observable ❑Not Applicable 403.5.3 Hot water pipes are insulated to R- R- ❑Complies [FR18]2 >_R-3. ❑Does Not Ql ['Not Observable ❑Not Applicable 4. Automatic or gravity dampers are ❑Complies ]2 installed on all outdoor air ❑Does Not intakes and exhausts. 1.1 ❑Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) RECEIVED Project Title: Goldfarb Report dfSE/1lg2/12621 Data filename: Page 6 of11 ASPEN BUILDING DEPARTMENT Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) RECEIVED Project Title: Goldfarb Report 456/1162 - 21 Data filename: Page 7 ofll ASPEN BUILDING DEPARTMENT Section Plans Verified Field Verified # Insulation Inspection Value Value Complies? Comments/Assumptions & Req.ID 303.1 ;All installed insulation is labeled '❑Complies [IN13]2 or the installed R-values ❑Does Not provided. • lot Observable ❑Not Applicable 402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least 1/2 of the ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.6 wall insulation on the wall ❑ Mass ❑ Mass [Not Observable [IN3]1 exterior,the exterior insulation 4 requirement applies(FR10). ❑ Steel ❑ Steel ❑Not Applicable 303.2 :Wall insulation is installed per ❑Complies [IN4]1 manufacturer's instructions. ❑Does Not ❑Not Observable j ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) RECEIVED Project Title: Goldfarb Report 456/1162/12621 Data filename: Page 8 of11 ASPEN BUILDING DEPARTMENT Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID_ 402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.2, j ❑ Steel ❑ Steel [Not Observable 402.2.6 [FI1]1 ENot Applicable 303.1.1.1, Ceiling insulation installed per ❑Complies 303.2 manufacturer's instructions. ❑Does Not [F12]1 Blown insulation marked every 300 ft2. ENot Observable ENot Applicable 402.2.3 !Vented attics with air permeable EComplies [F122]2 insulation include baffle adjacent ❑Does Not to soffit and eave vents that ;extends over insulation. ❑Not Observable j ❑Not Applicable 402.2.4 Attic access hatch and door R- R- EComplies [F13]1 insulation >_R-value of the ❑Does Not adjacent assembly. [Not Observable ❑Not Applicable 402.4.1.2 :Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = EComplies [F117]1 ach in Climate Zones 1-2, and ❑Does Not I<=3 ach in Climate Zones 3-8. ENot Observable j ENot Applicable 403.3.4 Duct tightness test result of<=4 cfm/100 cfm/100 EComplies [F14]1 cfm/100 ft2 across the system or ft2 ft2 ❑Does Not <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough-in ['Not Observable tests,verification may need to ENot Applicable occur during Framing Inspection. 403.3.3 Ducts are pressure tested to cfm/100 cfm/100 EComplies [F127]1 determine air leakage with ft2 ft2 Does Not either: Rough-in test:Total leakage measured with a ['Not Observable pressure differential of 0.1 inch ENot Applicable w.g. across the system including the manufacturer's air handler enclosure if installed at time of test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g. across the entire system including the manufacturer's air handler enclosure. 403.3.2.1 Air handler leakage designated EComplies [F124]1 by manufacturer at<=2%of ❑Does Not design air flow. [Not Observable ENot Applicable 403.1.1 :Programmable thermostats EComplies [F19]2 installed for control of primary ❑Does Not j heating and cooling systems and :initially set by manufacturer to ['Not Observable :code specifications. ❑Not Applicable i 403.1.2 Heat pump thermostat installed ❑Complies [F110]2 on heat pumps. ❑Does Not ENot Observable ❑Not Applicable 403.5. Circulating service hot water ❑Complies [F111]z systems have automatic or EDoes Not accessible manual controls. qLlNOt Observable i ENot Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) RECEIVED Project Title: Goldfarb Report 456/1162/12621 Data filename: Page 9 of11 ASPEN BUILDING DEPARTMENT Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 403.6.1 ;All mechanical ventilation system ' •Complies [F125]z fans not part of tested and listed •Does Not HVAC equipment meet efficacy and air flow limits. •Not Observable 403.2 j Hot water boilers supplying heat ❑Complies [F126]z through one-or two-pipe heating ❑Does Not ailsystems have outdoor setback control to lower boiler water ❑Not Observable temperature based on outdoor ❑Not Applicable j temperature. 403.5.1.1 Heated water circulation systems ❑Complies [F128]2 have a circulation pump.The ❑Does Not system return pipe is a dedicated return pipe or a cold water supply [Not Observable pipe. Gravity and thermos- ENot Applicable syphon circulation systems are not present. Controls for circulating hot water system pumps start the pump with signal for hot water demand within the 41'occupancy. Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. 403.5.1.2 'Electric heat trace systems ❑Complies [F129]z comply with IEEE 515.1 or UL El Does Not 515. Controls automatically adjust the energy input to the ['Not Observable heat tracing to maintain the ❑Not Applicable desired water temperature in the :piping. 403.5.2 Water distribution systems that 1 ❑Complies [F130]z have recirculation pumps that EDoes Not pump water from a heated water supply pipe back to the heated ['Not Observable water source through a cold ❑Not Applicable water supply pipe have a demand recirculation water system. Pumps have controls that manage operation of the pump and limit the temperature of the water entering the cold :water piping to 104°F. 403.5.4 Drain water heat recovery units ❑Complies [F131]z tested in accordance with CSA ❑Does Not B55.1. Potable water-side pressure loss of drain water heat [Not Observable recovery units < 3 psi for ❑Not Applicable individual units connected to one or two showers. Potable water- side pressure loss of drain water heat recovery units < 2 psi for individual units connected to three or more showers. 404.1 75%of lamps in permanent ❑Complies [F16]1 fixtures or 75%of permanent EDoes Not fixtures have high efficacy lamps. Does not apply to low-voltage ['Not Observable lighting. ❑Not Applicable 404.1.1 Fuel gas lighting systems have ❑Complies [F123]3 no continuous pilot light. EDoes Not J 111 [Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) RECEIVED Project Title: Goldfarb Report d �/9.762p2021 Data filename: Page 10 ofll ASPEN BUILDING DEPARTMENT Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 401.3 ;Compliance certificate posted. '❑Complies [F17F ❑Does Not 1_ 111L1Not Observable ❑Not Applicable 303.3 'Manufacturer manuals for ❑Complies [F118P mechanical and water heating ❑Does Not systems have been provided. [Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) RECEIVED Project Title: Goldfarb Report dtlb/9.762p2021 Data filename: Page 11 of11 ASPEN BUILDING DEPARTMENT C2015 IECC Energy IAEfficiency Certificate Insulation Rating R-Value Above-Grade Wall 23.00 Below-Grade Wall 27.00 Floor 10.00 Ceiling / Roof 49.00 Ductwork (unconditioned spaces): NA Glass& Door Rating U-Factor SHGC Window 0.27 Door 0.27 Heating&Cooling Equipment Efficiency Heating System: Air Source Heat Pump 2.0-3.0 COP Cooling System: Air Source Heat Pump 2.0-3.0 COP Water Heater: ASHP + Boiler 2.0 COP Name: Garrett McCaffety, PE Date: 03-09-21 Comments RECEIVED 06/16/2021 ASPEN BUILDING DEPARTMENT