HomeMy WebLinkAboutFile Documents.688 Spruce St.0119-2020-BRES (30) THe Mozingo CODE The Mozingo Code Group, LLC
GROUP
LLC 261 W 79th Ct
Denver, CO 80221
sdmozingo@mozingocodegroup.com
PLAN REVIEW REPORT
PROJECT
688 Spruce Street
PROJECT LOCATION
Aspen, CO
DATE OF REVIEW
December 21, 2020
REVIEW BASED ON PLANS DATED
10/16/2020 Architectural
08/20/2020 Structural
REVIEW CONTACT
Shaunna Mozingo, President
The Mozingo Code Group LLC
sdmozingo@mozingocodegroup.com
DESIGN TEAM COMMENT RESPONSES
IN RED ON FOLLOWING PAGES, AND
SUPPLEMENTAL INFORMATION IS
INCLUDED AT END OF DOCUMENT.
RREC5AVBD
127 /20D21
ASPCSHEN
BUIB®MN61dING (VENT
688 Spruce Street, Aspen First Review
PROJECT INFORMATION
ARCHITECT: CCY Architects
STRUCTURAL ENGINEER: KL&A Engineers
MECHANICAL ENGINEER: Resource Engineering Group
ELECTRICAL ENGINEER: Resource Engineering Group
CODES USED FOR REVIEW (as amended by Aspen)
2015 International Building Code
2015 International Mechanical Code
2015 International Plumbing Code
2015 International Energy Conservation Code
2020 National Electrical Code
BUILDING INFORMATION
New SFD
Total Floor Area: 4930
Notice
This cursory plan review is based on the codes noted herein and represents a list of corrections
necessary to comply with the requirements contained within them. This review is not a building
permit. The local jurisdiction is responsible for issuing the appropriate permits based on this
review. The approval of plans and specifications does not permit the violation of any section of
any federal, state or local regulations. All comments in this report are based on the information
provided on the drawings and supporting documentation provided for review. The Mozingo
Code Group, LLC does not accept any responsibility for any condition that was not known at the
time of this report. We reserve the right to amend this report if additional information is received.
This report does not purport to review, interpret, apply, or certify compliance with the
accessibility requirements set forth within the Americans with Disabilities Act (ADA). The
application, interpretation and enforcement of the ADA are vested with the Federal Department
of Justice. Applicants are encouraged to seek professional review to ensure compliance with
the ADA.
RECEIVED
12/28/2020
REIVED
BOILio.�39lA�T 021
Mozingo Code Group, LLC /z
ASPEN
BUILDING DEPARTMENT
688 Spruce Street, Aspen First Review
REVIEW COMMENTS
The items noted below with a comment number (B-1, B-2 etc.) are items that need to be
corrected to show compliance with the applicable codes. Please provide a written response
indicating where the corrections are made on the plans. This will speed up the review process.
Additional plan review comments may be added once revised plans are received for review.
BUILDING CODE COMMENTS
B-1 Refer to Sheets A202: Please specify how the glass guard behind the moveable screen
meets the requirements of IRC Section R308.1 and its subsections, as amended by the
City of Aspen. Please also provide construction details and specifications for the glass
guard. Railing has been redesigned to typical horizontal I steel bar railing, see detail
10/A-530, and Structural Details. DETAIL 1 ON A520?
B-2 Please specify where on the plans the provisions for IRC Section R309.6 Electric
Vehicle Charging, as adopted by the City of Aspen, can be found. Sheet E-102
mentions an EV charging station in the garage but that is the only thing provided.
INFORMATION WAS INCLUDED IN ELECTRICAL PLANS ALREADY
B-3 Refer to Electric plans, Sheet E102: Plans contain a note that there will be pre-wiring for
a future elevator. Separate permit required for future installation of an elevator per IRC
Section R321.4 as amended by the City of Aspen.
ELEVATOR IS NOT BEING DESIGNED OR INSTALLED AT THIS TIME. 10+
YEARS IN THE FUTURE
B-4 Refer to Sheet A502: Please specify how all of the exterior wall coverings will meet the
wall covering requirements of Table R703.3(1). There are no details in the architectural
s/ or structural plans. Please also specify how the anchored stone veneer will meet the
requirements for anchorage, air spaces, weepholes, etc of Section R703.8. The details
say to refer to the structural plans, but the structural plans say it is per the architectural
plans. ADDED NOTES TO STONE VENEER. ANCHORS AND FASTENERS ARE
NOW SHOWN IN ASSEMBLIES.
B-5 Refer to Architectural Sheet A-500: Please specify how any enclosed rafter spaces
'1e meet the roof ventilation requirements of IRC Section R806.1 as amended by the City of
Aspen. HOT ROOF ASSEMBLY DOES NOT REQUIRE ROOF VENTS.
B-6 Refer to architectural, mechanical, electrical, and structural plans: Please specify how
the 23.41 KW solar array meets the requirements of IRC Sections R902.4, R907 or
R909, and R324. Sheet A-112 says to reference the mechanical plans but there are no
specifications located within the mechanical plans. There is a small mention of the
electric requirements in the electric plans but no specifications or details. The structural
plans do mention in a comment that the roof load did take into consideration the PV
array. Please also see electric comments below. C��C
DESIGN-BUILD SOLAR ARRAY.ADDED NOTE TO ROOF PLAN THAT SOLAR A
ARRAY TO BE FIELD COORDINATED TO MEET ALL IRC REQUIREMENTS
STRUCTURAL COMMENTS 12/28/2020
ASPEN
S-1 Refer to Structural plans Sheet S-001: Please clarify why Seismic Design Categg9ll 'G DEPARTMENT
was used instead of C, IRC Table R301.2(1) as amended by Aspen. Please alsq�larifIVED
3IPage
ALL STRUCTURAL Mozingo Code Group, LLC 03/11/2021
COMMENTS ADDRESSED ON
PAGE 8 OF THIS PDF ASPEN
BUILDING DEPARTMENT
688 Spruce Street, Aspen First Review
why an elevation of 5280 was used instead of 7400, or if it has any bearing on the
calculations. Also please complete the notes in the Design Criteria table as they are
incomplete or reference wrong codes and standards.
S-2 Refer to Structural Sheet S-122: Please specify the proper description for Keyed note
<1> as it is missing. The note applies at Grids C and D.
S-3 Refer to Architectural Sheet A130: The plans call for a pulldown stair to access storage
in the garage attic. Please clarify whether the attic has been designed for loads
associated with storage and provide details for pulldown stair framing.
S-4 Refer to Architectural Plans, Sheet A-425: Please provide details for the west outdoor
room screen wall that is shown on the plans.
MECHANICAL CODE COMMENTS
M-1 Refer to Mechanical Plans: Please provide heating and cooling load calculations in
accordance with IMC Section 312.1. There is a "total zone heat loss" summary but
nothing to show how those losses were calculated. Also, Sheet M001 lists design
conditions with a winter outdoor temperature of-20 and summer outdoor temperature of
95. Aspen's design temperatures are -15 and 82. Please be sure that the load
calculations submitted use these design temperatures and revise Sheet M001
accordingly. / See M001 Summary
M-2 Refer to Mechanical Plans: Please provide ventilation calculations per IMC 403.3.2.1
through 403.3.2.3, as amended by the City of Aspen. Also, please specify the
combination mechanical ventilation strategy used to meet the requirements of IMC
403.1, as amended by the City of Aspen. The plans show ERVs and exhaust fans in the
controls sequence on Sheet M204 and a "max cfm" of 120 on Sheet M201 equipment
schedule. Ventilation calculations are needed to show that the 120cfm is needed.
See M001 Summary
M-3 Refer to Mechanical and Plumbing Plans: Please provide water heating and space
heating sizing calculations in accordance with IMC 1002.2.1 to ensure the combined
systems will each be met. See M001 Summary RECEIVED
1211b1F ED
4 I IASv
Mozingo Code Group, LLC BUILDINCCEEMIIOD21
ASPEN
BUILDING DEPARTMENT
688 Spruce Street, Aspen First Review
M-4 Refer to Mechanical Sheets: Exhaust fans are required in bathrooms and toilet
compartments, not just the toilet compartments. Please provide exhaust fans in all
rooms containing showers and/or tubs in accordance with M403, as amended by the
City of Aspen. / See M001 Summary
M-5 Refer to Electric Sheet E102: Please provide details and/or specifications for the patio
heaters referenced in the electric sheets. / Not Part of Mechanical System
PLUMBING CODE COMMENTS f See Response Letter, page 11 of this PDF
P-1 No plumbing sheets submitted. Refer to Architectural Sheet A-110 and Mechanical
Sheet M101, project note #19: Plans show a hot tub (by others) but no other information
has been submitted for the plumbing, electric, mechanical or energy efficiency of the hot
tub. Please provide additional information in order to verify compliance.
P-2 Refer to Sheet A110 and mechanical plans: Please provide gas pipe sizing calculations
with your design in accordance with IFGC Section 402. Please note that the mechanical
plans show boilers for both the home heating/water heating as well as for the snow melt.
The gas pipe sizing needs to include all appliances. There is an outdoor bbq, outdoor
heating and fireplace as well as multiple gas appliances within the home. On Sheet
M001, there is a comment that the lines have been sized for a capacity of 1090 MBH.
This may not be accurate with all appliances included in the calculation.
ENERGY CODE COMMENTS
EN-1 Refer to Mechanical and Architectural plans: The plans specify prescriptive Energy
Code compliance. Please specify how the plans will comply with the followina thermal
envelope requirements: We are now pursuing RESCheck compliance. See
Report, Uploaded into Salesforce
a. Slab Edge Insulation: There is a requirement tor K]u insulation b tor neatea
slabs) for a depth of 4 feet at all slabs less than 12" below grade. Please specify
how the slabs that are less than 12" below grade will meet the requirements of
R402.2.10. (this requirement is in addition to the under slab insulation required
for radiant slabs).
b. Please clarify if the R13 insulation in Wall 6 and Wall 7 is truly continuous or
cavity insulation. The plans say"ci" but the wall is a framed wall and this is
closed cell sprayed being used. Will it be sprayed between the framing members
s.�
5 I E2, 2✓8/2020
Mozingo Code Group, LLC 03/11/2021
ASPEN
BUILDINGPOMENT
BUILDING DEPARTMENT
688 Spruce Street, Aspen First Review
or continuously over the top of the framing members? If it is continuous, the
detail is incorrect on Sheet A505. RE: ASSEMBLIES. ADDED NOTE TO
CLARIFY
Ely;2 Please specify how the hot water piping will meet the pipe insulation requirements of
IECC Section R403.5.3 4 See M001 Specs
EN-3 Please specify how the fans used for the whole house mechanical ventilation system
meet the efficiency requirements of IECC Section R403.6.1 as amended by the City of
Aspen.
EN-4 Please specify how the balan ed ventilation system meets the requirements as set forth
in IECC Section R403.6.2, as dded by the City of Aspen.
EN-5 Please specify how the sn w elt system controls will meet the requirements of IECC
R403.9. Equipment, Approaches, and Controls are professionally
engineered within the guidelines of applicable codes. Equipment,
ELECTRICAL CODE COMMENTS Rates, and Controls are all provided for review. Please provide
specific comments/issues to address if they exist
heet E001
Project Information — Per Sec. 8.24.010 of city Amendments, correct to 2020 NEC as adopted
by state October 1, 2020, most current edition.
Electrical Specifications— C.1 — ...per NECA 1. What is the reason for this reference?
Sheet E002
One-Line Diagram —Anticipated 75kVA transformer—Justify size. Max 312.5 amps. Too small
for calculated load from Load Calculation; CT Meter and Disconnect—Article 230.85 requires an
Emergency Disconnect. Provide confirmation that the Disconnect will meet one of the design
provisions from 230.82 (1) — (3) or an additional EM disconnect is required; Main Distribution
Panel — Future Elevator in question. It has been included in the load calculation and is not noted
as future; Tesla Gateway— Is there a current solar system in for review? Need product
specifications for all Tesla Gateway, Generation Panel, Tesla Powerwall, AC Combiner, Solar
Panels, Array disconnects, and associated OCPD's for the system. Where is the Rapid
Shutdown for PV as required per 690.12?
General notes for this page — 2. Verify all loads have been included in Load Calculation. List of
additional equipment is not reflected in the Load Calculation.
Detail notes for this page — 11. - ...to be rated 220A—This rating conflicts with one-line.
Load Calculation —Area 5,756 SF differs from Architectural Plans Cover Sheet G-000 at 4,930
SF; Use of Art. 220.82 is based on known nameplate values. Load for Future Steam Showers
and Assumed Patio Heaters in question; From Sheet M201 ASHP-1 &ASHP-2 are 31 amps at
230 volts. This value is only 14,880 VA as applied. Load calculation shows 19,215 VA; Only
pumps 3, 8, and 9 are shown. From Sheet M204 Pumps 4, 5, 6, and 7 should be added based
on use; Architectural Sheet A-10 show a Self-Contained Hot Tub. This load is not reflected;
Where are the product specification sheets for all known values of equipment used?
RECEIVED
See Response Letter, pages 9-10 of this PDF
REGENED
6IPage
Mozingo Code Group, LLC 03/i1DPir:21021
BUILDING DEPARTMENT
ASPEN
BUILDING DEPARTMENT
688 Spruce Street, Aspen First Review
Feeder Schedule — Feeder Note 2 —Ground to increase per 250.102 (C)(1) as this is a Supply-
Side Bonding Jumper and not an Equipment Ground. Feeder Notes 6 & 7 — Feeders to be
provided pending receipt/ review of PV Tesla system.
Load Calculation EM-1 — Range at 1,750 VA while Range in Load Calculation is 1,725 VA. Why
are these different?; Why are Pumps 4 & 7 accounted for when not on Load Calculation?
Sheet E101
Provide General Note for page to require all 125-volt to 250-volt receptacles located on the
lower level to be GFCI protected per 2020 NEC 210.8 (A)(5).
Outdoor Kitchen/BBQ —AG receptacles are also required to be weatherproof per NEC 406.9 (A)
& (B).
PDR near Wet Bar— Missing EF-1?
Sheet E102
Kitchen —Appears to have a built in Island from Sheet A-111. Provide general note to provide
island receptacles as calculated from 2020 NEC 210.52 (C)(2).
Garage— Garage Door receptacles to be GFCI protected per 210.8 (A)(2).
Master Bath — Heated towel bars not included in Load Calculation.
Sheet E103
Not reviewed. Pending PV submittal/ review.
RECEIVED
12/28/2020
ASPEN
BUILDING DEPARTMENT
RECEIVED
7 ' Page
Mozingo Code Group, LLC 03/11/2021
ASPEN
BUILDING DEPARTMENT
Goldfarb Residence—688 Spruce Street,Aspen CO
Structural Design Review Comment Responses
S-1
a. The lateral design is based on the IBC,which calls for a different Seismic Design Category
than the IRC. In this case and for this code,we find that SDC B is appropriate. Please see
attached for an "ATC Hazards by Location" printout of the determination of the IBC design
category.
j. Using the elevation 5280 for this elevation factor is a KL&A standard and is a conservative
assumption. Using the site elevation of—7900 would result in a reduced lateral load.
An updated S-001 General Notes sheet has been included to provide this missing
information
S-2l This keyed note should read "Provide double joist to serve as collector." Omission of the text
for this keyed note was in error.
S-3 A load key region has been added to S-003 to provide loading direction to the premanufactured
truss designer, and an updated version of this sheet has been included. Note that it is the
premanufactured truss designer's responsibility to design the attic/roof structure at this
location.
S-4 VElevations and details for the outdoor room screen wall have been developed and are included
on S-300.
RECEIVED
03/11/2021
ASPEN
BUILDING DEPARTMENT
FIFIF- REG
R E S O U R C E
___,,,„
E N G I N E E R N G
GROUP
Shuanna Mozingo
President
The Mozingo Code Group
261W 79th Ct
Denver, CO 80221
sdmozingo@mozingocodegroup.corn January 15, 2021
Regarding: 688 Spruce Street - Plan Review Report(Dec 21, 2020)
Dear Shaunna:
Please see electrical code comment responses below.
E001: Sheet E001
Project Information—Per Sec. 8.24.010 of city Amendments, correct to 2020 NEC as adopted
by state October 1, 2020, most current edition.
EVrical Specifications—C.1 — ...per NECA 1. What is the reason for this reference?
REG Response: Updated for NEC 2020 compliance. NECA 1 is a standard for electrical
installation and further defines specifications not detailed in the NEC.
Sheet E002
One-Line Diagram—Anticipated 75kVA transformer—Justify size. Max 312.5 amps. Too small
for calculated load from Load Calculation; CT Meter and Disconnect—Article 230.85 requires an
Emergency Disconnect. Provide confirmation that the Disconnect will meet one of the design
provisions from 230.82 (1)—(3) or an additional EM disconnect is required; Main Distribution
Panel—Future Elevator in question. It has been included in the load calculation and is not noted
as future; Tesla Gateway—Is there a current solar system in for review?Need product
specifications for all Tesla Gateway, Generation Panel, Tesla Powerwall, AC Combiner, Solar
Panels, Array disconnects, and associated OCPD's for the system. Where is the Rapid
Shutdown for PV as required per 690.12?
s/ REG Response: Transformer sizing is per utility. Documentation updated for clarity
regarding transformer and disconnect. The elevator load is displayed in the equipment
schedule as ELE-1 which states "Future Elevator—Estimated". PV design per others.
General notes for this page—2. Verify all loads have been included in Load Calculation. List of
additional equipment is not reflected in the Load Calculation.
REG Response: Updated notes for clarity. HVAC loads are included in the "Heating and Air
Conditioning Load" section of the load calculation.
Detail notes for this page— 11. - ...to be rated 220A—This rating conflicts with one-line.
REG Response: Updated
Load Calculation—Area 5,756 SF differs from Architectural Plans Cover Sheet G-000 at 4,930
SF; Use of Art. 220.82 is based on known nameplate values. Load for Future Steam Showers
and Assumed Patio Heaters in question; From Sheet M201 ASHP-1 &ASHP-2 are 31 am C E IVE ID
230 volts. This value is only 14,880 VA as applied. Load calculation shows 19,215 VA; 0 1
Consulting Engineers • Mechanical • Structural • Energy 0 3 11 2 0 21
Crested Butte&Golden Colorado • reginc.com ASPEN
BUILDING DEPARTMENT
pumps 3, 8, and 9 are shown. From Sheet M204 Pumps 4, 5, 6, and 7 should be added based
on use; Architectural Sheet A-10 show a Self-Contained Hot Tub. This load is not reflected;
Where are the product specification sheets for all known values of equipment used?
REG Response: Updated where applicable per discussion with City of Aspen code review.
Please reference new notes regarding loads included in HVAC calculation which clarify that
"Heating and Air Conditioning Load" also includes associated air handlers and pumps in
addition to the Heat Pumps.
Feeder Schedule—Feeder Note 2—Ground to increase per 250.102 (C)(1) as this is a Supply-Side
Bonding Jumper and not an Equipment Ground. Feeder Notes 6 & 7—Feeders to be
provided pending receipt/review of PV Tesla system.
VREG Response: Updated Ground sizing. Feeder 6 and 7 per PV installer.
Load Calculation EM-1 —Range at 1,750 VA while Range in Load Calculation is 1,725 VA. Why
are these different?; Why are Pumps 4 & 7 accounted for when not on Load Calculation?
REG Response: Load Calculations updated. Pumps 4 and 7 are included in the HVAC
calculation for the general building load. They are explicitly called out for the emergency
load in order to provide clarity to the installer. Added additional notes to plan set for clarity.
Sheet E 101
Provide General Note for page to require all 125-volt to 250-volt receptacles located on the
lower level to be GFCI protected per 2020 NEC 210.8 (A)(5).
V REG Response: Updated
Outdoor Kitchen/BBQ—AG receptacles are also required to be weatherproof per NEC 406.9 (A)
& (B)
V REG Response: Updated for clarity
PDR near Wet Bar—Missing EF-1?
V REG Response: No, confirmed with Mechanical.
Sheet E102
Kitchen—Appears to have a built in Island from Sheet A-111. Provide general note to provide
island eceptacles as calculated from 2020 NEC 210.52 (C)(2).
REG Response: Updated
Garage—Garage Door receptacles to be GFCI protected per 210.8 (A)(2).
REG Response: Updated note to clarify EC responsibility to provide GFI breakers where
applicable.
Master Bath—Heated towel bars not included in Load Calculation.
VREG Response: Updated
Sheet E103
Not reviewed. Pending PV submittal/review.
N(t
Please feel free to contact to me with any follow questions or comments.
Sincerely,
Kristine Thompson, PE
RECEIVED
Consulting Engineers • Mechanical • Structural • Energy 0 3 11 2 0 21
Crested Butte&Golden Colorado • reginc.com ASPEN
BUILDING DEPARTMENT
Fr"- R EG
RESOURCE
_Ai
E N C I N E E R INC
GROUP
Shuanna Mozingo
President
The Mozingo Code Group
261W 79th Ct
Denver, CO 80221
sdmozingo@mozingocodegroup.com (January 06, 2021)
Regarding: 688 Spruce Street - Plan Review Report(Dec 21, 2020)
Dear Shaunna:
Please see plumbing code comment responses below.
P-1 No plumbing sheets submitted. Refer to Architectural Sheet A-110 and Mechanical
heet M101,project note#19: Plans show a hot tub (by others)but no other information
has been submitted for the plumbing, electric, mechanical or energy efficiency of the hot
tub. Please provide additional information in order to verify compliance.
REG Response: REG was asked to provide water service sizing only. The Permit Authority,
City of Aspen, does not require plumbing plans for residential permit applications. Please
consult Architect and/or Spa Designer for additional information pertaining to spa system
design and compliance.
P-2 Refer to Sheet A110 and mechanical plans: Please provide gas pipe sizing calculations
with your design in accordance with IFGC Section 402. Please note that the mechanical
plans show boilers for both the home heating/water heating as well as for the snow melt.
The gas pipe sizing needs to include all appliances. There is an outdoor bbq, outdoor
heating and fireplace as well as multiple gas appliances within the home. On Sheet
M001, there is a comment that the lines have been sized for a capacity of 1090 MBH.
This may not be accurate with all appliances included in the calculation.
REG Response: REG was asked to provide gas service sizing only. This sizing is provided
on sheet M001 in the Gas Design Conditions section. Service sizing has been updated to
reflect equipment selections made for CD plan set. A gas appliance schedule has been
provided on M201 with a breakdown of all gas appliances identified on Architectural and
Mechanical floor plans.
Please feel free to contact to me with any follow questions or comments.
Sincerely,
Cal Fenerty