HomeMy WebLinkAboutFile Documents.800 S Monarch St.0062-2021-BRES (11) 0062-2021 -BRES_800 S Monarch_Engineering Commentsl
40.Drainage Report.20210402.pdf(3)
Subject: Dev Rev
Page: 5 Confirm: is the drywell being used to treat only
Page Index: 5 WQCV or will it accommodate full detention as
Author: carlym well?The drainage report says WQCV only, but
Date: 6/11/2021 11:26:26 AM the calculations are for full detention. Please revise
Capture: No for clarity.
File Name: 40.Drainage Report.20210402.pdf WQCV-a drainage outlet will restrict flows to below historic
levels.Drywell has capacity for entire storm while it drains.
Subject: Dev Rev
Page: 9 Drainage report shall include capacity calculations
gES:LPage Index: 9 for inlets and trench drains.
Author: carlym
Date: 6/11/2021 11:26:49 AM Trench drain and drain pipe
Capture: No calculations are provided.
File Name: 40.Drainage Report.20210402.pdf
Subject: Dev Rev
Page: 9 As stated previously in your drainage report,full
Page Index: 9 100-year detention is not required for the property.
Author: carlym Please confirm if drywell is sized for WQCV or for
INNOnalDate: 6/11/2021 9:55:33 AM full detention.
Capture: No Flo-well is designed for WQCV and an outlet is utilized to release to
File Name: 40.Drainage Report.20210402.pdf less than historic flows.
80.Survey.20210323.pdf(1)
f — r: Subject: Dev Rev
Page: [1] SURVEY 24X36 Survey must be performed or verified within the
last 12 months.
Page Index: 1
Author: carlym
Date: 6/11/2021 11:58:35 AM Survey has been updated.
Capture: No
File Name: 80.Survey.20210323.pdf
90.Civil Plans.20210409.pdf(7)
Subject: Dev Rev Existing roof drains must be disconnected from
Page: [3] C1 Existing Conditions& Demo
Page Index: 3 sanitary system and must tie into new system.
// ' Author: carlym
/ia`;% Date: 6/11/2021 9:40:12 AM Existing roof drains that are being disturbed will be disconnected from
Capture: No sanitary system.Existing roof drains that are not being disturbed will
File Name: 90.Civil Plans.20210409.pdf remain as is.
Subject: Dev Rev
Page: [3] ClExisting Conditions& Demo Call out that all existing drainage infrastructure will
4.�
Page Index: 3 be disconnected from the sanitary system.
Author: carlym
Date: 6/11/2021 9:38:18 AM Existing roof drains that are being disturbed will be disconnected from
Capture: No sanitary system.Note added to existing condition drawing that they are
disconnected from the sanitary system.
File Name: 90.Civil Plans.20210409.pdf
RECEIVED
03/22/2022
ASPEN
BUILDING DEPARTMENT
Subject:g4Dev Rev Survey shows retaining wall along SE corner of
Page: [4] C2 Site Plan
- Page Index: 4 pool deck. Is the retaining wall remaining in place?
— = Author: carlym If so, show on plans and confirm that the infiltration
Date: 6/11/2021 11:55:22 AM from the drywell will not compromise the structural
Capture: No integrity of the retaining wall.
File Name: 90.Civil Plans.20210409.pdf Existing retaining wall to remain in place.Drywell has been located
away from retaining wall.
t'l :`.;?_..o;.,,,'"f Subject: Dev Rev Drywell is not permitted within 10'of property line.
t ��" Page: [5] C3 Grading &Drainage Plan`"�� Page Index: 5 Please revise plans.
wAlf Mil Author: carlym Flo-well has been moved to be 10'away from property line.
�.�R ' r=- r Date: 6/11/2021 9:45:25 AM
Capture: No
File Name: 90.Civil Plans.20210409.pdf
—a Subject: Dev Rev Call out trench drain invert elevations on Grading
�-- Page: [5] C3 Grading &Drainage Plan
=_ Page Index: 5 and Drainage plan to ensure positive drainage.
Author: carlym Trench drain inverts added on grading and drainage plan.
Date: 6/11/2021 9:45:41 AM
Capture: No
File Name: 90.Civil Plans.20210409.pdf
Subject: Dev Rev Show that the drainage from the outlet will make it
pk Page: [5] C3 Grading &Drainage Plan
- Page Index: 5 all the way to the ROW. Drywell outlets are not
Author: carlym permitted to drain onto neighboring properties.
Date: 6/11/2021 9:43:36 AM Confirm and show that drainage is accommodated
Capture: No and will not impact neighboring property.
File Name: 90.Civil Plans.20210409.pdf Drainage swale on east side of property has been improved to convey stormwater
runoff to ROW.Capacity calculations provided in drainage report.
'rirll% y� Subject: Dev Rev Subgrade structure exists under some portions of
71 .,� " _ Page: [5] C3 Grading &Drainage Plan
rl the work area. Please confirm that there is no
1 i Page Index: 5 subgrade structure in the proposed drywell
t, f Author: carlym
a, ___- Date: 6/11/2021 9:46:42 AM location.
Capture: No Subgrade structure does not exist within footprint of proposed concrete
File Name: 90.Civil Plans.20210409.pdf modifications.
RECEIVED
03/22/2022
ASPEN
BUILDING DEPARTMENT