Loading...
HomeMy WebLinkAboutFile Documents.800 S Monarch St.0062-2021-BRES (11) 0062-2021 -BRES_800 S Monarch_Engineering Commentsl 40.Drainage Report.20210402.pdf(3) Subject: Dev Rev Page: 5 Confirm: is the drywell being used to treat only Page Index: 5 WQCV or will it accommodate full detention as Author: carlym well?The drainage report says WQCV only, but Date: 6/11/2021 11:26:26 AM the calculations are for full detention. Please revise Capture: No for clarity. File Name: 40.Drainage Report.20210402.pdf WQCV-a drainage outlet will restrict flows to below historic levels.Drywell has capacity for entire storm while it drains. Subject: Dev Rev Page: 9 Drainage report shall include capacity calculations gES:LPage Index: 9 for inlets and trench drains. Author: carlym Date: 6/11/2021 11:26:49 AM Trench drain and drain pipe Capture: No calculations are provided. File Name: 40.Drainage Report.20210402.pdf Subject: Dev Rev Page: 9 As stated previously in your drainage report,full Page Index: 9 100-year detention is not required for the property. Author: carlym Please confirm if drywell is sized for WQCV or for INNOnalDate: 6/11/2021 9:55:33 AM full detention. Capture: No Flo-well is designed for WQCV and an outlet is utilized to release to File Name: 40.Drainage Report.20210402.pdf less than historic flows. 80.Survey.20210323.pdf(1) f — r: Subject: Dev Rev Page: [1] SURVEY 24X36 Survey must be performed or verified within the last 12 months. Page Index: 1 Author: carlym Date: 6/11/2021 11:58:35 AM Survey has been updated. Capture: No File Name: 80.Survey.20210323.pdf 90.Civil Plans.20210409.pdf(7) Subject: Dev Rev Existing roof drains must be disconnected from Page: [3] C1 Existing Conditions& Demo Page Index: 3 sanitary system and must tie into new system. // ' Author: carlym /ia`;% Date: 6/11/2021 9:40:12 AM Existing roof drains that are being disturbed will be disconnected from Capture: No sanitary system.Existing roof drains that are not being disturbed will File Name: 90.Civil Plans.20210409.pdf remain as is. Subject: Dev Rev Page: [3] ClExisting Conditions& Demo Call out that all existing drainage infrastructure will 4.� Page Index: 3 be disconnected from the sanitary system. Author: carlym Date: 6/11/2021 9:38:18 AM Existing roof drains that are being disturbed will be disconnected from Capture: No sanitary system.Note added to existing condition drawing that they are disconnected from the sanitary system. File Name: 90.Civil Plans.20210409.pdf RECEIVED 03/22/2022 ASPEN BUILDING DEPARTMENT Subject:g4Dev Rev Survey shows retaining wall along SE corner of Page: [4] C2 Site Plan - Page Index: 4 pool deck. Is the retaining wall remaining in place? — = Author: carlym If so, show on plans and confirm that the infiltration Date: 6/11/2021 11:55:22 AM from the drywell will not compromise the structural Capture: No integrity of the retaining wall. File Name: 90.Civil Plans.20210409.pdf Existing retaining wall to remain in place.Drywell has been located away from retaining wall. t'l :`.;?_..o;.,,,'"f Subject: Dev Rev Drywell is not permitted within 10'of property line. t ��" Page: [5] C3 Grading &Drainage Plan`"�� Page Index: 5 Please revise plans. wAlf Mil Author: carlym Flo-well has been moved to be 10'away from property line. �.�R ' r=- r Date: 6/11/2021 9:45:25 AM Capture: No File Name: 90.Civil Plans.20210409.pdf —a Subject: Dev Rev Call out trench drain invert elevations on Grading �-- Page: [5] C3 Grading &Drainage Plan =_ Page Index: 5 and Drainage plan to ensure positive drainage. Author: carlym Trench drain inverts added on grading and drainage plan. Date: 6/11/2021 9:45:41 AM Capture: No File Name: 90.Civil Plans.20210409.pdf Subject: Dev Rev Show that the drainage from the outlet will make it pk Page: [5] C3 Grading &Drainage Plan - Page Index: 5 all the way to the ROW. Drywell outlets are not Author: carlym permitted to drain onto neighboring properties. Date: 6/11/2021 9:43:36 AM Confirm and show that drainage is accommodated Capture: No and will not impact neighboring property. File Name: 90.Civil Plans.20210409.pdf Drainage swale on east side of property has been improved to convey stormwater runoff to ROW.Capacity calculations provided in drainage report. 'rirll% y� Subject: Dev Rev Subgrade structure exists under some portions of 71 .,� " _ Page: [5] C3 Grading &Drainage Plan rl the work area. Please confirm that there is no 1 i Page Index: 5 subgrade structure in the proposed drywell t, f Author: carlym a, ___- Date: 6/11/2021 9:46:42 AM location. Capture: No Subgrade structure does not exist within footprint of proposed concrete File Name: 90.Civil Plans.20210409.pdf modifications. RECEIVED 03/22/2022 ASPEN BUILDING DEPARTMENT