Loading...
HomeMy WebLinkAboutMaster Permit.824 E HOPKINS AVE.0093-2021-BRESClose Window Print This Page Expand All | Collapse All 0093-2021-BRES 824 E HOPKINS AVE 103 Record Type Building Number 0093-2021-BRES Owner Fernando Cruz Original Number 21-1557 Status Closed - Final Type Building Reason for Cancel or Compl. Review Fail Applicant CHRIS HENDRICKSON No HENDRICKSON CONSTRUCTION INC Required Bond Amount Project Land Use Planning Application Bluebeam Project Id 239-619-594 Permit Contractor HENDRICKSON CONSTRUCTION INC HPC-ZON-EH-UTIL Review Valid Business License on Account HPC-ZON-EH-UTIL Review-2 Imported Eng Review Eng-CMP Rev,Util Rev,Eng-Wtr Rev, Required Submissions Parks-Prkng-San Review San Rev, Documents Resubmitted Conditional Inspections Conditional Final Insp Eng-Wtr Final,Util Final,San Final, Action Items Hold Reason Minor 2021 Conditional Flat Fee Formula Applicant is a Nonprofit?No Conditional Tiered Fee Formula Eligible for Small Lodge Program? No Conditional Tiered SqFt Fee Formula MIR,Discount All Fees (%) Fee Discount Reason CO CO Status if Applicable Issued Queue Score 0 Queue Designation Milestone Current Days in City Hands 0 Queue Score 0 Milestone - Total Days in Applicant Hand 0 Last Date Received from Applicant Milestone - Total Days in City Hands 7 Dates 6/11/2021 TCO Issuance Date 6/21/2021 Close/CO Issuance Date 11/25/2024 6/21/2021 Expiration Date 2/10/2025 7/2/2021 11 8/15/2024 Basic Information Description Interior remodel consisting of replacing flooring, windows and doors, light fixtures, plumbing fixtures (note: one bathroom consisting of a toilet and sink is being eliminated), kitchen cabinets, counters and appliances. No structural changes are proposed, one door into an existing powder room will be eliminated and framed and drywalled. Windows and exterior doors will be replaced with same size as existing. No modification to existing exterior will occur. Dryer vent is shown on Sheet M1.0. It exits the building on the west side facing the blank wall of the adjacent building. Census Code 434 R - Remodel only (no new Sq Ft) Address Aspen Internal? Account Total Available Bond Amount Hold All Reviews Create Fees Create Fees 2 Utility Review Type Price Book CO/LOC? Project Designation Milestone Current Days in Applicant Hand New Application Date Application Complete Date Application Accepted Date Issue Date Override Expiration Date Days to Issue Last Activity Date 3/3/25, 2:39 PM 0093-2021-BRES ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOxWkAAL/p 1/17 Owner has contacted City Water Department to get a copy of a water bill to obtain information as to existing ECU count but no bill for this individual unit is available. Building with multiple residential units receives one bill. The ECU Calculator sheet has been filled out and included with replacement fixtures, which is less than existing due to the elimination of the powder room toilet and sink. Use of Building Multi-Family Use Class Residential Class of Work Alteration Job Location Address 824 E HOPKINS AVE 103, ASPEN : 273718203020 Lot Site Address Display on Map Legal Description Subdivision: CENTENNIAL PARK Unit: 103 Historic Property?No Historic District?No HPC - Planning - Zoning Details Zone District R/MF HOA/Covenant HOA/Covenant Approval Acquired Is There an ADU?No HPC Certificate of Appropriateness? No ADU Sq Ft Work Involves a Land Use Approval? No Deed Restricted?No Located in a PD?No # of Dwellings 1 No Category of Zoning Fee Residential No Zoning Work Level Minor Zoning Fee Yes Building Project Details $35,000.00 6,666 Reason for Valuation Change 0 876 932 932 0 932 0% 932 196 196 10% 0 Scope of Work Details Work Changes Building Footprint? No No Yes Located Within City Mall Boundaries? No Yes Adjacent to City Open Space?No Photovoltaic Installation No Impacts City Trails/Parks?No Yes No No Yes Change of Restaurant Ownership? No Prevents Access to Sewer Main?No No Sewer Easements Affected?No Utility Water Details Already on City Water? Class of Service Customer Water Service Area Water Service Agreement Required? Is There Well or Wells on the Property? Common Building Name Abandon Existing Well Abandon Existing Tap Date of Existing Tap Interior Remodel Only Permit Comments Eden Address Adds/Changes Floor Area? Occupancy or Use Change? Work Affects Exterior of Building? Valuation Lot Size Sq. Ft. Soil Disturbance Sq Ft Unit Sq. Ft.Affected Area Sq Ft Building Footprint Sq Ft Existing Hardscape Footprint Sq Ft Sq Ft of Building Work Area Existing Hardscape % of Lot Building Fire Area Sq Ft Con Mit Sq Ft Total Utility Review Sq. Ft.Utility Review Sq Ft Total % of Interior being Altered New Sq. Ft. Work Affects Tree/Drip Line? Work Changes Fenestration/Thrml Envelop? Requires Asbestos Test? Work Adds/Removes/Changes Plumbing Fixt? Work Subject to Water Efficient L.O.? Restaurant/Food Service Involved? Involves Impact on Sewer? Affects Parking/Alleys/Loading? Utility Account Number Acre-feet of Water Currently by Well Acre-feet of Water Rights to be Conveyed 3/3/25, 2:39 PM 0093-2021-BRES ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOxWkAAL/p 2/17 Existing Tap Modifications? Existing ECU Count New Tap? Date of New Tap Final ECU Count Does Project Involve Outdoor Irrigation? Number of Meters Proposed Irrigated Area Sq Ft Is There a Pool, Spa or Water Feature? Summary of Prior Water Fees Paid Building Description Code Editions Other Required Special Inspections 2015 IEBC Energy Code Compliance Building Type (IRC) Total Snowmelt Sq Ft Construction Type VA Total Spa Sq Ft Occupancy Load 5 Total Pool Sq Ft Occupancy Group R-2 Amount of Onsite Renewable Generation? Fire Sprinkler Existing?No CO Description Fire Sprinkler Required?No Basement Fire Sprinkler Type 1st Floor KITCHEN, ONE BEDROOM, ONE FULL BATHROOM, ONE LAUNDRY ROOM, ONE WOOD BURNING FIRE PLACE Fire Alarms Installed? 2nd Floor # Wood Fireplaces 3rd Floor # Gas Log Fireplaces Additional # Gas Appliances Open Text Field For Comments Financials $3,612.25 Total Payments $1,683.63 $1,928.62 Total Balance $1,928.62 System Information Number 0093-2021-BRES Community Visibility Created By CHRIS HENDRICKSON, 6/7/2021 9:34 AM 0036A00000ZPoEuQAL Bluebeam Project Id 239-619-594 IsTestData? BB Project Name 824 E HOPKINS AVE 103 - 0093-2021-BRES Last Modified By Fernando Cruz, 3/3/2025 2:36 PM VIP Form Tool VIP Submitted 6/11/2021 11:18 AM VIP Template Status [{"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvPUAS"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvNUAS"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000iWidUAE"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvVUAS"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvKUAS"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvXUAS"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvaUAC"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvZUAS"}, {"parentCategoryId":null,"isSubmit":true,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000Ux1dUAC"}] VIP Foreign Language VIP Form Template Permit Application Action Items View/Print Permit Link Attachment View GIS Map View Milestone Gantt Chart Activity History Email: Certificate of Occupancy: Permit 0093-2021-BRES at 824 E HOPKINS AVE 103, ASPEN : 273718203020 Type Billable Assigned To Martyna Wojtkowska Number of Hours Total Cost $0.00 Fee Generated Date If Residential App, Estimated New ECUs Size of Existing Domestic Water Line Identify ALL Sources of Water Size of Proposed Domestic Water Line Size of Existing Fire Suppression Line Size of Proposed Fire Suppression Line Other Code Editions Total Fees Fees Due at Current Status Contact IDs 3/3/25, 2:39 PM 0093-2021-BRES ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOxWkAAL/p 3/17 Start Date Completed Date 11/25/2024 Days in Applicant's Hands Comments To: chris@hendricksoninc.com CC: BCC: Attachment: 824 E HOPKINS AVE 103- 0093-2021-BRES_CO_Final.pdf Subject: Certificate of Occupancy: Permit 0093-2021-BRES at 824 E HOPKINS AVE 103, ASPEN : 273718203020 Body: Hello CHRIS HENDRICKSON, Please find attached your issued certificate of occupancy for the completed project at 824 E HOPKINS AVE 103, ASPEN : 273718203020. If applicable, you will find attached the contractor’s city use tax letters and tax reconciliation forms. Please distribute these as necessary. If you have any questions about use tax or how to fill out the forms, please contact Bebo Salib at bebo.salib@aspen.gov or 970.920.5043. For questions about this permit, you can reply to this email. Email: COA Building Department Staff Changes Type Billable Assigned To AnnMarie Prince Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 6/2/2022 Days in Applicant's Hands Comments To: chris@hendricksoninc.com CC: BCC: Attachment: --none-- Subject: COA Building Department Staff Changes Body: Dear Salesforce Applicant, The Building Department has had a change of staffing and would like to let you know that your Permit Owner for permit number 0093-2021-BRES may have changed. Emmy Garrigus has moved to the position of Plans Examiner and is no longer the owner of many permits. Sydney Fallon is now taking on much of this role as the new Building Support Specialist. Please contact the appropriate owner for questions related to this specific permit (the owner is identified under the permit details.) Moving forward, please contact Sydney Fallon, Building Support Specialist | (970)309-5894 | buildingsupport@aspen.gov for the following: All new applications Schedule a pre-submittal meeting Permit application requirements or completeness review questions Help submitting responses to comments and change orders Please contact your reviewers directly for any questions regarding their comments. Reviewers can be viewed in Salesforce following the instructions here. And remember, Permit Status information is available 24/7 via the Salesforce Portal. For instructions click here. Thank you. **DO NOT REPLY TO THIS EMAIL** Email: Utility Connection Permit Final Type 3/3/25, 2:39 PM 0093-2021-BRES ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOxWkAAL/p 4/17 Billable Assigned To Steve Wilson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 1/18/2022 Days in Applicant's Hands Comments To: chris@hendricksoninc.com CC: BCC: Attachment: UCP_Water_Final__20220119.docx.pdf Subject: Utility Connection Permit Final Body: Hello CHRIS HENDRICKSON, Attached is your final Utility Connection Permit for the completed project at 824 E HOPKINS AVE 103 associated with permit #: 0093-2021-BRES. After review, please print, have signed by owner, and notarized. Once signed and notarized, please return UCP with payment, if applicable, to the Finance Department window located on the second floor of City Hall at 427 Rio Grande Place. Alternatively, you may upload the signed and notarized copy of the UCP as a SCANNED (not photographed) .pdf file and pay all fees due via Salesforce, but if submitting via Salesforce, please send a chatter to @Robert Gregor and @Cole Langford on the permit record once the document is uploaded and all fees are paid to serve as a “push” notification that these permit requirements are complete. Please reach out with any questions or concerns. Thanks, Chris. Email: Updated Building Permit Card Type Billable Assigned To Renee Espinoza Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 7/13/2021 Days in Applicant's Hands Comments To: chris@hendricksoninc.com CC: BCC: Attachment: 824 E Hopkins Ave 103 - 0093-2021-BRES.pdf Subject: Updated Building Permit Card Body: Good Afternoon, Please find attached the updated building permit card. Warmest Regards, Lisa Guida Email: Building Permit 0093-2021-BRES - 824 E HOPKINS AVE 101, ASPEN : 273718203017 - Issued Type Billable Assigned To Renee Espinoza Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 7/2/2021 Days in Applicant's Hands Comments To: chris@hendricksoninc.com CC: jayme@hendricksoninc.com BCC: Attachment: Building_Permit__ 824 E Hopkins Ave 101 - 0093-2021-BRES.pdf, APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN__20210625.pdf Subject: Building Permit 0093-2021-BRES - 824 E HOPKINS AVE 101, ASPEN : 273718203017 - Issued Body: Dear CHRIS HENDRICKSON, Please find attached your issued building permit 0093-2021-BRES for 824 E HOPKINS AVE 101, ASPEN : 273718203017 and City use tax exemption letter & Covid-19 site safety plan approval notice (if applicable) Below is a link to your plans and information regarding inspections. Please print these 24x36 in color and keep them on site at all times. As a reminder these drop box links do expire so please download the plans as soon as you get them. https://www.dropbox.com/sh/2nw1pp5is1mcn5n/AAADrhtBG6nzt6sYjJRrs1yra?dl=0 If you have any questions please let us know. Kind regards, John Barker City of Aspen 3/3/25, 2:39 PM 0093-2021-BRES ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOxWkAAL/p 5/17 Community Development Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions contain in the email are based on current zoning, and/or applicable building code regulations which is subject to change in the future, and upon factual representations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email: Permit Fees Due Type Billable Assigned To Renee Espinoza Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 6/30/2021 Days in Applicant's Hands Comments To: chris@hendricksoninc.com CC: BCC: Attachment: --none-- Subject: Permit Fees Due Body: If you have not already paid the fees due on your permit 0093-2021-BRES, at 824 E HOPKINS AVE 101, ASPEN : 273718203017 , please log into the Aspen Permitting Portal to pay them. If you pay online, be aware that credit card or e-check transaction fees will apply. If you would like to pay by check, you can mail payments to the following locations: • Building and related permits: Community Development, 130 S Galena St., 3rd Floor • Parking Reservation permits: Parking Department, 130 S Galena St, 1st Floor • Pitkin County Water Permit: Utility Billing., 130 S Galena, 1st Floor • ROW and encroachments: 201 N Mill St., Suite 203 • Tree permits: Parks Dept., 585 Cemetery Lane Aspen • Utility Connection Permits: Utility Billing., 130 S Galena, 1st Floor • Electric Community Investment Fee: Utility Billing., 130 S Galena, 1st Floor Current Amount Due: $1,928.62 Instructions to see detail of fees due: - Log in to the Portal here: https://cityofaspen.force.com/applicantportal and click on Permits menu - Open the permit by clicking on the permit number link - Click on the Related tab (next to Details tab) and scroll down to Fees section - If all fees are not visible, click the “View All” link - To filter fees, click on the black funnel icon at the top right. (Example: to only see the fees due at permit submission, select “Complete Pending Submittal Fees” under Permit Fees Due At section and then click Apply button.) Thank you! City of Aspen Email: City of Aspen Utility Water Connection Permit (UCP) Required Type Billable Assigned To Robert Gregor Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 6/24/2021 Days in Applicant's Hands Comments To: chris@hendricksoninc.com CC: BCC: Attachment: --none-- Subject: City of Aspen Utility Water Connection Permit (UCP) Required Body: Hello CHRIS HENDRICKSON, You recently submitted a permit to the City of Aspen, #0093-2021-BRES, for the property located at 824 E HOPKINS AVE 101, ASPEN : 273718203017, and during the Utilities Water review on this permit, we determined that you are required to apply for a Utility Water Connection permit application (UCP). To submit this application, please click on the link below to the City of Aspen Applicant Portal (or paste it into your browser), and once logged into the portal, click the Next button to start a new application (located at the center of the portal home page). Link to Applicant Portal: https://cityofaspen.force.com Please be aware that we will not be able to approve the Utilities Water review on your current permit 0093-2021-BRES until you submit a UCP application and all required tap fees are paid. If you have any questions, please feel free to contact me at the number below. Sincerely, City of Aspen Utilities Department 3/3/25, 2:39 PM 0093-2021-BRES ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOxWkAAL/p 6/17 130 S Galena St Aspen, CO 81611 (970) 456-6114 Email: 824 E Hopkins, Unit 101 / Permit No. 0093-2021-BRES Type Billable Assigned To Bob Narracci Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 6/23/2021 Days in Applicant's Hands Comments To: chris@hendricksoninc.com CC: John.Barker@cityofaspen.com; Denis.Murray@cityofaspen.com; Bob.Narracci@cityofaspen.com BCC: Attachment: --none-- Subject: 824 E Hopkins, Unit 101 / Permit No. 0093-2021-BRES Body: Good Morning Chris, I have signed off on this permit for Zoning. Thank you, Bob Narracci Bob Narracci Community Development Department Zoning Administrator 130 S. Galena St. Aspen, CO 81611 p: 970.429.2754 Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions contained in the email are based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email: Permit Fees Due Type Billable Assigned To John Barker Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 6/14/2021 Days in Applicant's Hands Comments To: chris@hendricksoninc.com CC: BCC: Attachment: --none-- Subject: Permit Fees Due Body: If you have not already paid the fees due on your permit 21-1557, at 824 E HOPKINS AVE 101, ASPEN : 273718203017 , please log into the Aspen Permitting Portal to pay them. If you pay online, be aware that credit card or e-check transaction fees will apply. If you would like to pay by check, you can mail payments to the following locations: • Building and related permits: Community Development, 130 S Galena St., 3rd Floor • Parking Reservation permits: Parking Department, 130 S Galena St, 1st Floor • Pitkin County Water Permit: Utility Billing., 130 S Galena, 1st Floor • ROW and encroachments: 201 N Mill St., Suite 203 • Tree permits: Parks Dept., 585 Cemetery Lane Aspen • Utility Connection Permits: Utility Billing., 130 S Galena, 1st Floor • Electric Community Investment Fee: Utility Billing., 130 S Galena, 1st Floor Current Amount Due: $1,683.63 Instructions to see detail of fees due: - Log in to the Portal here: https://cityofaspen.force.com/applicantportal and click on Permits menu - Open the permit by clicking on the permit number link - Click on the Related tab (next to Details tab) and scroll down to Fees section - If all fees are not visible, click the “View All” link - To filter fees, click on the black funnel icon at the top right. (Example: to only see the fees due at permit submission, select “Complete Pending Submittal Fees” under Permit Fees Due At section and then click Apply button.) Thank you! City of Aspen Email: Your Building Permit Application Has Been Received... Here's What to Expect 3/3/25, 2:39 PM 0093-2021-BRES ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOxWkAAL/p 7/17 Type Billable Assigned To John Barker Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 6/11/2021 Days in Applicant's Hands Comments To: chris@hendricksoninc.com CC: BCC: Attachment: --none-- Subject: Your Building Permit Application Has Been Received... Here's What to Expect Body: Dear CHRIS HENDRICKSON: I have received your permit application. I will be your Permit Coordinator. The City of Aspen permit process works as follows: Completeness Review: I will be reviewing your permit application for completeness in the next 5 business days. I will follow up with you directly if I need any additional information. Submittal Fees: Once your permit is deemed complete, I will provide you with a list of all permit submittal fees that are due. Your permit will not be placed into our review queue until payment of all submittal fees is received. Permit Review: Your permit will be placed in our review queue on the date that the submittal fee payment is received. Each review agency triggered for the review will either approve the permit or issue comments that you are required to address prior to their approval. You can see the status of all reviews by going into your permit on the portal, clicking on ‘Related,’ and scrolling down to ‘Reviews.’ Comment Response: Once you have addressed all agency comments, both in writing and on your plans, you will resubmit all documents via the portal. Just go into your permit, scroll down to the bottom of the page, and use the ‘Add more’ button. You must notify me when you have uploaded your files for me to know that you have resubmitted. You can use the portal’s Chatter feature (see below). Issuance: Once all agencies have approved your permit, you will be notified that it is time to pay your permit issuance fees. Once you do so, your approved plans and permit documents will be sent to you electronically. Additional Important Information: Only after I perform a completeness review and submittal fees are paid will your permit be accepted into our system as a formal submission. At that time, it will be put into the permit work queue. I may need to meet with you—either in person, over the phone, or via a virtual meeting—before I can finish my completeness review to ensure that I have a full understanding of your project’s scope. If you need to contact me about your permit, I encourage you to use the Chatter feature on your permit on the applicant portal. When you use Chatter, I get an email, but it also gets attached to the permit record in the back office. So, anyone looking at the permit can see the conversations. This will be very helpful if someone else needs to get involved with your permit. To use Chatter: Open your permit on the portal. In the ‘Share an update…’ box, type @, then start typing my name. My name will appear. Just click on it then add your message. Please let me know if you have any questions. Regards, John Barker City of Aspen Community Development Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions contain in the email are based on current zoning, and/or applicable building code regulations which is subject to change in the future, and upon factual representations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Permit Inspection Type Zoning Billable Assigned To Bob Narracci Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 1/6/2022 Days in Applicant's Hands Comments Permit Review Type Zoning Billable Assigned To Bob Narracci Number of Hours 0.50 Total Cost $162.50 Fee Generated Date 3/3/25, 2:39 PM 0093-2021-BRES ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOxWkAAL/p 8/17 Start Date Completed Date 6/23/2021 Days in Applicant's Hands Comments Contacts CHRIS HENDRICKSON Account HENDRICKSON CONSTRUCTION INC Type Applicant Active Contractor License Count 2.00 Number 0037212 Account HENDRICKSON CONSTRUCTION INC Type Contractor Active Contractor License Count 2.00 Number 0037213 Fees 0060512 Type Zoning Review Fee Total $325.00 Waived/Refunded Amt Discount $ Outstanding $0.00 Fee Due At Complete Pending Submittal Fees Show in Cart Paid in Full Fee Paid Date/Time 0060513 Type Zoning Review Fee Total $325.00 Waived/Refunded Amt Discount $ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart Paid in Full Fee Paid Date/Time 0060514 Type Use Tax Deposit - Pitkin County Total $17.50 Waived/Refunded Amt Discount $ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart Paid in Full Fee Paid Date/Time 0060515 Type Building Permit Fees Total $762.50 Waived/Refunded Amt Discount $ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart Paid in Full Fee Paid Date/Time 0060516 Type Utilities Development Review Fee Total $250.00 Waived/Refunded Amt Discount $ Outstanding $0.00 Fee Due At Complete Pending Submittal Fees Show in Cart Paid in Full Fee Paid Date/Time 0060517 Type Construction Mitigation Fee 3/3/25, 2:39 PM 0093-2021-BRES ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOxWkAAL/p 9/17 Total $498.62 Waived/Refunded Amt Discount $ Outstanding $0.00 Fee Due At Complete Pending Submittal Fees Show in Cart Paid in Full Fee Paid Date/Time 0060518 Type Construction Mitigation Fee Total $498.62 Waived/Refunded Amt Discount $ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart Paid in Full Fee Paid Date/Time 0060519 Type Building Plan Check Fee Total $495.63 Waived/Refunded Amt Discount $ Outstanding $0.00 Fee Due At Complete Pending Submittal Fees Show in Cart Paid in Full Fee Paid Date/Time 0060520 Type Energy Code Fee Total $114.38 Waived/Refunded Amt Discount $ Outstanding $0.00 Fee Due At Complete Pending Submittal Fees Show in Cart Paid in Full Fee Paid Date/Time 0060712 Type Planning Hourly Fee Total $325.00 Waived/Refunded Amt Discount $ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart Paid in Full Fee Paid Date/Time Files 824 E HOPKINS AVE 103- 0093-2021-BRES_CO_Final Last Modified 11/25/2024 10:12 AM Created By Martyna Wojtkowska Building_-_CO_City_Use_Tax_-_FRR_Notice_to_Contractor__20241125.docx Last Modified 11/25/2024 10:05 AM Created By Martyna Wojtkowska UCP (Fin) - FE, No Tap Fees - 824 E Hopkins Ave #103 Last Modified 8/15/2024 3:40 PM Created By Drew Kimbrell 824 E. Hopkins Ave. #103 Final Count Sheet Last Modified 1/18/2022 10:19 PM Created By Steve Wilson 824 E Hopkins Ave 103 - 0093-2021-BRES Last Modified 7/13/2021 4:05 PM Created By Lisa Guida Building_-_CO_City_Use_Tax_-_FRR_Transmittal_to_Owner__20241125.docx Last Modified 11/25/2024 10:06 AM Created By Martyna Wojtkowska Building_-_IRC_Certificate_of_Occupancy__20240906.docx Last Modified 9/6/2024 2:36 PM Created By Martyna Wojtkowska UCP (Fin) - FE, No Tap Fees - 824 E Hopkins Ave #103 Last Modified 8/14/2024 4:41 PM Created By Robert Gregor UCP_Water_Final__20220119.docx Last Modified 1/18/2022 10:15 PM Created By Steve Wilson Building_Permit__ 824 E Hopkins Ave 101 - 0093-2021-BRES Last Modified 7/2/2021 11:31 AM Created By Lilly Culver 3/3/25, 2:39 PM 0093-2021-BRES ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOxWkAAL/p 10/17 Building_Permit__20210702.docx Last Modified 7/2/2021 11:27 AM Created By Lilly Culver Permit Application 2021-06-11 17:18:56.pdf Last Modified 6/11/2021 11:18 AM Created By CHRIS HENDRICKSON APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN__20210625.pdf Last Modified 6/25/2021 8:10 AM Created By Tim Rohe Inspections INS-0004888-21 Status Closed - Not Needed Type Zoning Subtype Requested Date Scheduled Start Date Completed Date 1/6/2022 Owner Last Name Permit Inspection Round Initial Inspection Closed TRUE INS-0004934-21 Status Pass/Accepted Type Sanitation Subtype Requested Date 1/5/2022 10:15 AM Scheduled Start Date Completed Date 7/30/2024 Owner Last Name Strait Permit Inspection Round Final Inspection Closed TRUE INS-0004935-21 Status Pass/Accepted Type Engineering Water Subtype Requested Date 1/5/2022 10:30 PM Scheduled Start Date Completed Date 1/18/2022 Owner Last Name Wilson Permit Inspection Round Final Inspection Closed TRUE INS-0004936-21 Status Pass/Accepted Type Utilities Subtype Requested Date 1/6/2022 9:41 AM Scheduled Start Date Completed Date 8/14/2024 Owner Last Name Gregor Permit Inspection Round Final Inspection Closed TRUE INS-0004937-21 Status Closed - Not Needed Type Fire Subtype Requested Date 1/12/2022 10:00 AM Scheduled Start Date Completed Date 1/11/2022 Owner Last Name Legersky Permit Inspection Round Final Inspection Closed TRUE INS-0004938-21 Status Pass/Accepted Type Building Subtype Final Building Requested Date 1/12/2022 10:00 AM Scheduled Start Date 1/12/2022 Completed Date 1/12/2022 Owner Last Name Feder Permit Inspection Round Final Inspection Closed TRUE 3/3/25, 2:39 PM 0093-2021-BRES ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOxWkAAL/p 11/17 INS-0004939-21 Status Pass/Accepted Type Zoning Subtype Requested Date 1/5/2022 9:30 AM Scheduled Start Date Completed Date 1/6/2022 Owner Last Name Narracci Permit Inspection Round Final Inspection Closed TRUE INS-0006623-21 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 10/6/2021 8:50 AM Scheduled Start Date 10/6/2021 Completed Date 10/7/2021 Owner Last Name Bennett Permit Inspection Round Initial Inspection Closed TRUE INS-0006679-21 Status Pass/Accepted Type APECC Subtype Insulation Requested Date 10/18/2021 9:26 AM Scheduled Start Date 10/18/2021 Completed Date 10/15/2021 Owner Last Name Bennett Permit Inspection Round Re-Inspection Closed TRUE INS-0006908-21 Status Accepted as Noted Type Building Subtype Drywall Requested Date 10/18/2021 9:28 AM Scheduled Start Date 10/18/2021 Completed Date 10/15/2021 Owner Last Name Bennett Permit Inspection Round Initial Inspection Closed TRUE INS-0007201-21 Status Partial/Non-Complete Type Building Subtype Special Building Inspection Requested Date 11/2/2021 2:34 PM Scheduled Start Date 11/2/2021 Completed Date 11/3/2021 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE MEP Permit Inspections INS-0006318-21 Status Accepted as Noted Type Electric Subtype Special Electrical Permit 0168-2021-ELEC Requested Date 9/21/2021 10:00 AM Scheduled Start Date 9/21/2021 Completed Date 9/21/2021 Owner Alias RBenn Closed TRUE INS-0006591-21 Status Pass/Accepted Type Electric Subtype Rough Electrical Permit 0168-2021-ELEC Requested Date 10/4/2021 8:12 AM Scheduled Start Date 10/4/2021 Completed Date 10/4/2021 Owner Alias RBenn 3/3/25, 2:39 PM 0093-2021-BRES ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOxWkAAL/p 12/17 Closed TRUE INS-0006872-21 Status Pass/Accepted Type Plumbing Subtype Plumbing Waste & Vent Permit 0098-2021-PLUM Requested Date 10/21/2021 11:00 AM Scheduled Start Date 10/21/2021 Completed Date 10/22/2021 Owner Alias RBenn Closed TRUE INS-0007482-21 Status Pass/Accepted Type Electric Subtype Special Electrical Permit 0168-2021-ELEC Requested Date 11/16/2021 12:00 PM Scheduled Start Date 11/16/2021 Completed Date 11/16/2021 Owner Alias BClin Closed TRUE INS-0007745-21 Status Pass/Accepted Type Electric Subtype Final Electrical Permit 0168-2021-ELEC Requested Date 12/2/2021 1:00 PM Scheduled Start Date 12/2/2021 Completed Date 12/2/2021 Owner Alias RBenn Closed TRUE INS-0008081-21 Status Failed/Rejected Type Plumbing Subtype Final Plumbing Permit 0098-2021-PLUM Requested Date 12/21/2021 8:09 AM Scheduled Start Date 12/21/2021 Completed Date 12/21/2021 Owner Alias steve f Closed TRUE INS-0008106-21 Status Pass/Accepted Type Plumbing Subtype Final Plumbing Permit 0098-2021-PLUM Requested Date 1/4/2022 12:15 PM Scheduled Start Date 1/4/2022 Completed Date 1/4/2022 Owner Alias steve f Closed TRUE Milestones Review Round 1 - 0093-2021-BRES Status Approved Due Date Created Date 6/21/2021 Notes & Attachments 824 E HOPKINS AVE 103- 0093-2021-BRES_CO_Final Type File Last Modified Martyna Wojtkowska Description Download Building_-_CO_City_Use_Tax_-_FRR_Notice_to_Contractor__20241125.docx Type File Last Modified Martyna Wojtkowska Description Download Building_-_CO_City_Use_Tax_-_FRR_Transmittal_to_Owner__20241125.docx Type File Last Modified Martyna Wojtkowska Description Download Building_-_IRC_Certificate_of_Occupancy__20240906.docx Type File Last Modified Martyna Wojtkowska Description Download 3/3/25, 2:39 PM 0093-2021-BRES ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOxWkAAL/p 13/17 UCP (Fin) - FE, No Tap Fees - 824 E Hopkins Ave #103 Type File Last Modified Drew Kimbrell Description Download 824 E. Hopkins Ave. #103 Final Count Sheet Type File Last Modified Steve Wilson Description Download 824 E Hopkins Ave 103 - 0093-2021-BRES Type File Last Modified Lisa Guida Description Download Building_Permit__20210702.docx Type File Last Modified Lilly Culver Description Download Permit Application 2021-06-11 17:18:56.pdf Type File Last Modified CHRIS HENDRICKSON Description Download UCP (Fin) - FE, No Tap Fees - 824 E Hopkins Ave #103 Type File Last Modified Robert Gregor Description Download UCP_Water_Final__20220119.docx Type File Last Modified Steve Wilson Description Download Building_Permit__ 824 E Hopkins Ave 101 - 0093-2021-BRES Type File Last Modified Lilly Culver Description Download APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN__20210625.pdf Type File Last Modified Tim Rohe Description Download Signature-Sign Below-0053s000002RfcBAAS-6/11/2021 11:18 AM.png Type Attachment Last Modified CHRIS HENDRICKSON Description View file Payments PY-009488 Related To 0093-2021-BRES Amount $1,928.62 Created Date 7/2/2021 Payment Source R-0009022 Receipt - Amount Remaining R-0009022: $0 PY-009248 Related To 0093-2021-BRES Amount $1,683.63 Created Date 6/14/2021 Payment Source R-0008807 Receipt - Amount Remaining R-0008807: $0 Related Permits 0039-2021-UTWC Type Utility Water Connection Address 824 E HOPKINS AVE 103 Work Type New Status Closed - Final Applicant CHRIS HENDRICKSON Issue Date 6/29/2021 Last Activity Date 0168-2021-ELEC Type Electrical Address 824 E HOPKINS AVE 103 Work Type New Status Closed - Final Applicant JOHN TIKUNOFF Issue Date 7/18/2021 Last Activity Date 12/2/2021 0098-2021-PLUM Type Plumbing Address 824 E HOPKINS AVE 103 Work Type New Status Closed - Final Applicant Kim Kaler Issue Date 8/3/2021 Last Activity Date 1/5/2022 Reviews REV-019417 3/3/25, 2:39 PM 0093-2021-BRES ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOxWkAAL/p 14/17 Milestone Review Round 1 - 0093-2021-BRES Status Approved Type Zoning Due Date Completed Date 6/23/2021 10:49 AM Owner Alias bnarr On Hold Created Date 6/21/2021 REV-019418 Milestone Review Round 1 - 0093-2021-BRES Status Approved Type Building Due Date Completed Date 6/24/2021 1:38 PM Owner Alias DMurr On Hold Created Date 6/21/2021 REV-019419 Milestone Review Round 1 - 0093-2021-BRES Status Approved Type Engineering CMP Due Date Completed Date 6/25/2021 8:17 AM Owner Alias TRohe On Hold Created Date 6/21/2021 REV-019420 Milestone Review Round 1 - 0093-2021-BRES Status Approved Type Sanitation Due Date Completed Date 6/25/2021 12:57 PM Owner Alias CStra On Hold Created Date 6/21/2021 REV-019421 Milestone Review Round 1 - 0093-2021-BRES Status Approved Type Utilities Due Date Completed Date 6/29/2021 4:28 PM Owner Alias RGreg On Hold Created Date 6/21/2021 Submissions 10.Permit Application Packet 20210610.pdf Actions Submission Date 6/11/2021 11:16 AM Status Required Description 30.Asbestos Test 20210503.pdf Actions Submission Date 6/11/2021 11:16 AM Status Required Description 50.Construction Management Plan 20210610.pdf Actions Submission Date 6/11/2021 11:16 AM Status Required Description 50.Covid-19 Site Safety Plan 20210610.pdf Actions Submission Date 6/11/2021 11:16 AM Status 3/3/25, 2:39 PM 0093-2021-BRES ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOxWkAAL/p 15/17 Required Description 90.Mechanical Plan 20210611.pdf Actions Submission Date 6/11/2021 11:16 AM Status Required Description 30.Window and Door Spec 20210611.pdf Actions Submission Date 6/11/2021 11:16 AM Status Required Description 90.Architectural Plans 20210429.pdf Actions Submission Date 6/11/2021 11:16 AM Status Required Description Residential ECU Calculator 2020.xlsx Actions Submission Date 6/14/2021 3:42 PM Status Required Description Wall Assembly.pdf Actions Submission Date 6/22/2021 2:39 PM Status Required Description e221 Larner SD Light L.1 06.18.21.pdf Actions Submission Date 6/22/2021 2:39 PM Status Required Description Larner Completed RDS Application Packet - MF.pdf Actions Submission Date 6/22/2021 3:00 PM Status Required Description 20.824 E Hopkins #101.RDS Exemption.20210622.pdf Actions Submission Date 6/22/2021 4:25 PM Status Required Description 20.824 E Hopkins Unit 101.Stream Margin Exemption.20210622.pdf Actions Submission Date 6/22/2021 4:25 PM Status Required Description eLarner Joist repair.pdf Actions Submission Date 10/13/2021 12:06 PM Status Required Description 3/3/25, 2:39 PM 0093-2021-BRES ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOxWkAAL/p 16/17 Receipt_2024-07-31_135601.pdf Actions Submission Date 7/31/2024 2:14 PM Status Required Description Permit History 3/3/2025 2:36 PM User Fernando Cruz Action Changed Owner from Martyna Wojtkowska to Fernando Cruz. 11/25/2024 10:17 AM User Martyna Wojtkowska Action Changed Status from Ready for Closure to Closed - Final. 9/6/2024 2:34 PM User Martyna Wojtkowska Action Changed Owner from Sydney Fallon to Martyna Wojtkowska. 8/15/2024 10:51 AM User Justin Hahn Action Changed Status from Final Inspections to Ready for Closure. 8/15/2024 10:50 AM User Justin Hahn Action Changed Status from Issued to Final Inspections. 8/14/2024 4:41 PM User Robert Gregor Action Changed Expiration Date from 1/26/2025 to 2/10/2025. 7/30/2024 1:13 PM User Chip Strait Action Changed Expiration Date from 7/19/2022 to 1/26/2025. Copyright © 2000-2025 salesforce.com, inc. All rights reserved. 3/3/25, 2:39 PM 0093-2021-BRES ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOxWkAAL/p 17/17