HomeMy WebLinkAboutFile Documents.801 E Hopkins Ave.0150-2023-BRES COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
CITY OF ASPEN 427 RIO GRANDE PL | ASPEN, CO 81611
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
City
Mailing Address
E-mailAddress
State ZIP
OWNER
___________________________________ _____________________ ________________________Name Phone E-mail
FOR PLAN REVIEW QUESTIONS
___________________________________ _____________________ ________________________Name Phone E-mail
FOR INSPECTION QUESTIONS
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
City
Mailing Address
E-mailAddress
State ZIP
OWNER’S AUTHORIZED AGENT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
City
Mailing Address
E-mailAddress
State ZIP
APPLICATION BEST CONTACT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
City
Mailing Address
E-mailAddress
State ZIP
ARCHITECT OR DESIGNER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
City
Mailing Address
E-mailAddress
State ZIP
CIVIL ENGINEER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
City
Mailing Address
E-mailAddress
State ZIP
STRUCTUAL ENGINEER OF RECORD
I ŚereďLJ cerƚiĨLJ ƚŚaƚ I Śaǀe read and edžaŵined ƚŚiƐ aƉƉlicaƚion and Ŭnoǁ ƚŚe Ɛaŵe ƚo ďe ƚrƵe and correcƚ͘ All ƉroǀiƐionƐ oĨ laǁƐ and ordinanceƐ
ŐoǀerninŐ ƚŚiƐ ƚLJƉe oĨ ǁorŬ ǁill ďe coŵƉlied ǁiƚŚ ǁŚeƚŚer ƐƉeciĨied Śerein or noƚ͘ dŚe ŐranƚinŐ oĨ a Ɖerŵiƚ doeƐ noƚ ƉreƐƵŵe ƚo Őiǀe aƵƚŚoriƚLJ ƚo ǀiolaƚe
or cancel ƚŚe ƉroǀiƐionƐ oĨ anLJ oƚŚer Ɛƚaƚe or local laǁ reŐƵlaƚinŐ conƐƚrƵcƚion or ƚŚe ƉerĨorŵance oĨ conƐƚrƵcƚion͘ Iƚ iƐ ŵLJ reƐƉonƐiďiliƚLJ ƚo reǀieǁ ƚŚe
aƉƉroǀed ƉlanƐ and anLJ coŵŵenƚƐ ƚŚaƚ are conƚained ƚŚereon and Ɛee ƚŚaƚ ƚŚe ƐƚrƵcƚƵre andͬor Ɖroũecƚ iƐ ďƵilƚ in coŵƉliance ǁiƚŚ all aƉƉlicaďle codeƐ͘
Additionally, I understand that I am responsible for ensuring that all sub-permits associated with my project are submitted to the City in compliance
with the approved Master plan set. I understand that the City does not review sub-permits for compliance with the master plan set
________________________________________________________ _____________________ContractorSignature Date
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
City
Mailing Address
E-mailAddress
State ZIP
GENERAL CONTRACTOR
CŚecŬ iĨ LJoƵ are a ƚeƐƚed oǁner ďƵilder ;ƐinŐleͲĨaŵilLJ ŚoŵeƐ onlLJͿ͘ zoƵ ŵƵƐƚ ƚaŬe a ƚeƐƚ and coŵƉleƚe ƚŚe oǁnerͬďƵildinŐ aĸdaǀiƚ͘
;CIdz h^E ONLzͿ Oǁner ďƵilder aƉƉroǀed ďLJ͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺDaƚe͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ Aĸdaǀiƚ on Įle
AZSS͗ ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ PERDId NhDER͗ ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
Eovember 2022
303-906-0207
820 E. Hyman Ave., Aspen
Tee Cowperthwaite 303.906.0207 tee@sin-bad.com
Rea Coulter 970.379.9894 rea@sin-bad.com
Marshall Webb 970.925.4269 970.948.4269
53 Osprey Circle Okatie SC 29909
mwebbonweb@gmail.com
Rob Sinclair 970.925.4269 970.948.4269
PO Box 8114 Aspen CO 81611
rob@sin-bad.com
Tee Cowperthwaite 303.906.0207
PO Box 8114 Aspen CO 81611
tee@sin-bad.com
Barbara Gisel Design LTD 610.649.1554
365 W. Lancaster Ave.Haverford PA 19041
laura@bgdltd.com
970.925.4269
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A
Sinclair Building|Architecture|Design LTD 970.370.9894
PO Box 8114 Aspen CO 81611
rea@sin-bad.com
970.925.4269
26 May 2023
801 E. Hopkins Ave|Unit 5, Aspen
Andrew Eisenberg
4224 N. McColl Rd #7302
docandroo@gmail.com
McAllen TX 78504
PO Box 8114
rob@sin-bad.com
Sinclair Building|Architecture|Design Ltd 970.925.4269 970.948.4269
81612COAspen
01 December 2023
12/11/2023
|
CITY
OF
ASP
E
N
No
v
e
m
b
e
r
202
2
427 RIO
GR
A
N
D
E
PL|
ASP
E
N
,
CO
816
1
Ow
n
e
r
'
s
Att
o
r
n
e
y
Pr
i
n
t
e
d
Nam
e
N/A
Ow
n
e
r
'
s
Att
o
r
n
e
y
Si
g
n
a
t
u
r
e
N/A
Dat
e
N/A
OR
Ow
n
e
r
Pri
n
t
e
d
Nam
e
AN
D
R
E
W
EIS
E
N
B
E
R
G
Ow
n
e
r
Sig
n
a
t
u
r
e
Dat
e
O1
DEC
20
2
3
do
c
u
m
e
n
t
.
of
pr
i
v
a
t
e
co
v
e
n
a
n
t
s
or
ho
m
e
o
w
n
e
r
as
s
o
c
i
a
t
i
o
n
ru
l
e
s
or
by
l
a
w
s
.
T
un
d
e
r
s
t
a
n
d
th
a
t
th
i
s
do
c
u
m
e
n
t
is
a
pu
b
l
i
c
I
pr
o
p
o
s
e
d
in
th
i
s
bu
i
l
d
i
n
g
pe
r
m
i
t
hav
e
bee
n
ap
p
r
o
v
e
d
by
the
ho
m
e
o
w
n
e
r
s
as
s
o
c
i
a
t
i
o
n
or
co
v
e
n
a
n
t
be
n
e
f
i
c
i
a
r
y
.
This
pr
o
p
e
r
t
y
is
su
b
j
e
c
t
to
a
ho
m
e
o
w
n
e
r
s
as
s
o
c
i
a
t
i
o
n
or
pr
i
v
a
t
e
co
v
e
n
a
n
t
and
the
im
p
r
o
v
e
m
e
n
t
s
be
n
e
f
i
c
i
a
r
y
.
pr
o
p
o
s
e
d
in
th
i
s
bu
i
l
d
i
n
g
pe
r
m
i
t
do
not
re
q
u
i
r
e
ap
p
r
o
v
a
l
by
the
ho
m
e
o
w
n
e
r
s
as
s
o
c
i
a
t
i
o
n
or
co
v
e
n
a
n
t
This
pr
o
p
e
r
t
y
is
su
b
j
e
c
t
to
a
ho
m
e
o
w
n
e
r
s
as
s
o
c
i
a
t
i
o
n
or
pr
i
v
a
t
e
co
v
e
n
a
n
t
and
the
im
p
r
o
v
e
m
e
n
t
s
This
I,
the
pr
o
p
e
r
t
y
ow
n
e
r
,
ce
r
t
i
f
y
as
fo
l
l
o
w
s
:
(p
i
c
k
one
)
AD
D
R
E
S
S
801
E.
HO
P
K
I
N
S
AV
E
,
AS
P
E
N
UNI
T
#
5
PA
R
C
E
L
ID
#
27
3
7
1
8
2
0
8
0
1
1
for
a
pe
r
m
i
t
.
ow
n
e
r
or
at
t
o
r
n
e
y
re
p
r
e
s
e
n
t
i
n
g
the
pr
o
p
e
r
t
y
ow
n
e
r
.
The
fo
l
l
o
w
i
n
g
ce
r
t
i
f
i
c
a
t
i
o
n
sh
a
l
l
ac
c
o
m
p
a
n
y
the
ap
p
l
i
c
a
t
i
o
n
with
ap
p
l
i
c
a
b
l
e
co
v
e
n
a
n
t
s
and
ho
m
e
o
w
n
e
r
as
s
o
c
i
a
t
i
o
n
po
l
i
c
i
e
s
.
The
ce
r
t
i
f
i
c
a
t
i
o
n
must
be
sig
n
e
d
by
the
pr
o
p
e
r
t
y
All
ap
p
l
i
c
a
t
i
o
n
s
for
a
bu
i
l
d
i
n
g
pe
r
m
i
t
wit
h
i
n
the
City
of
Asp
e
n
are
re
q
u
i
r
e
d
to
in
c
l
u
d
e
a
ce
r
t
i
f
i
c
a
t
i
o
n
of
co
m
p
l
i
a
n
c
e
HO
M
E
O
W
N
E
R
AS
S
O
C
I
A
T
I
O
N
CO
M
P
L
I
A
N
C
E
FOR
M
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
DE
P
A
R
T
M
E
N
T
OTY
O
F
ASP
E
N
ADD
R
E
S
S
:
801
E.
HOP
K
I
N
S
AVE
U
N
I
T
5,
AsP
E
N
PE
R
M
I
T
NU
M
B
E
R
:
un
d
e
r
s
t
a
n
d
the
City
of
Asp
e
n
doe
s
not
in
t
e
r
p
r
e
t
,
en
f
o
r
c
e
,
or
man
a
g
e
the
ap
p
l
i
c
a
b
i
l
i
t
y
,
mea
n
i
n
g
,
or
eff
e
c
t
pr
o
p
e
r
t
y
is
not
su
b
j
e
c
t
to
a
ho
m
e
o
w
n
e
r
s
as
s
o
c
i
a
t
i
o
n
or
oth
e
r
fo
r
m
of
pr
i
v
a
t
e
co
v
e
n
a
n
t
.
12/11/2023
COMMUNITY DEVELOPMENT DEPARTMENT
VALUATION AFFIDAVIT
CITY OF ASPEN 427 RIO GRANDE PL | ASPEN, CO 81611
All applications for a building permit within the City of Aspen are required to include a certification of
compliance with building permit valuation requirements. The certification must be signed by the property
owner or authorinjed representative. The following certification shall accompany the application for a permit.
I, the property owner or authorinjed agent, understand and certify as follows:
City of Aspen Ordinance No. ϰϬ, Series of ϮϬϭϲ adopts the ϮϬϭϱ International Residential Code (IRC) and
International Building Code (IBC) with certain amendments. These codes define building valuation as follows:
R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a
permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems,
including materials and labor.
109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time
of application. Permit valuations shall include total value of work, including materials and labor, for which the
permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in
the opinion of the building official, the valuation is underestimated on the application, the permit shall be
denied, unless the applicant can show detailed estimates to meet the approval of the building oĸcial. &inal
building permit valuation shall be set by the building oĸcial.
City policy indicates that permit valuation includes materials and labor for the structure and mechanical,
electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as
audio visual, lighting and ,sAC controls are included in the total as are edžpenses directly related to construction
such as equipment rental and contractor fees. &inish materials such as paint, Ňoor coverings, tile, cabinets and
counter tops are included in the permit valuation total.
Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development
mitigation fees, trash removal, and cleaning are not included.
AFFIDAVIT POLICY
I certify that the permit valuation entered on the permit application for this property complies with the above
valuation requirements. I understand that this document is a public document.
Owner Signature: _________________________ Date:___________
Owner Printed Name: _________________________
or,
Authorinjed Agent Signature: _________________________ Date:___________
Authorinjed Agent Printed Name: _________________________
AZSS͗ ____________________________PERMIT NUMBER: _______________________________
Eovember 2022
820 E. Hyman Ave., Aspen
Rob Sinclair
26 May 2023
801 E. Hopkins Ave|Unit 5, Aspen
01 Dec 2023
12/11/2023
COMMUNITY DEVELOPMENT DEPARTMENT
ASBESTOS VERIFICATION AND CHECKLIST
CITY OF ASPEN 427 RIO GRANDE PL | ASPEN, CO 81611
Asbestos is a known human carcinogen and is an airborne hanjard. Once airborne, asbestos fibers can stay suspended in the air for days,
weeks, or even months before settling out of the air. The fibers can easily become airborne again from a minor disturbance like turning
on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos
hanjards that could edžpose people to asbestos in the future, long aŌer the renovation activity occurred. The airborne asbestos fiber
concentrations resulting from disturbances may result in a significant edžposure to the current and future occupants of the home.
The 1989 “ban” on asbestos-containing materials is commonly misunderstood. In fact, in ϭϵϵϭ the U.S. &iŌh Circuit Court of appeals
vacated much of the soͲcalled ͞Asbestos Ban and Phaseout Rule͟ and remanded it to the EPA. Thus, much of the original ϭϵϴϵ EPA ban
on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestosͲcontaining product categories was
set aside and DID NOT TA<E E&&ECT. Therefore, A>> demolition, remodel or renovation projects must determine if disturbed material
above the trigger levels contains asbestos.
ASBESTOS INFORMATION
ASBESTOS CHECKLIST
Yes No
Residential: till you be removing more than ϯϮ sq Ō, ϱϬ linear feet (e.g., pipe insulation), or the volume
equivalent of a ϱϱͲgallon drum of any material besides concrete, wood, bricks, or steel ʹ edžamples are drywall,
linoleum, ceiling tiles, roofing materials, etc.͍
Yes No
Commercial: till you be removing more than ϭϲϬ sq Ō, ϮϲϬ linear feet (e.g., pipe insulation), or the volume
equivalent of a ϱϱͲgallon drum of any material besides concrete, wood, bricks, or steel ʹ edžamples are drywall,
linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.͍
If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/
or demolition permit. zou ǁill also need to provide plans indicating areas to be demolished and determine if a
CK state demolition license is reƋuired. A state certified asbestos inspector must do this test and the test report
must be submitted with the building permit application. If the building has asbestos, a state certified asbestos
abatement firm must remove it. AŌer removal, the abatement firm must provide a letter to the Building
Department stating that all the asbestos has been removed and that the air is clean. This letter must be received
BE&ORE a permit will be issued. (See the local or statewide zellow Pages, DedžOn>ine, or http:ͬͬwww.cdphe.state.
co.usͬapͬasbestosͬindedž.html for certified asbestos inspectors and abatement companies. A>tAzS ask for proof
of current state certification.)
If you are demolishing the building, you must submit a demolition permit app with the CDP,E in addition to the
Aspen permit app. This form may be found at https:ͬͬwww.colorado.govͬpacificͬcdpheͬasbestosͲforms NOTE:
A copy of this demolition permit app must be submitted with the initial building permit application. then the
CDP,E approves the app, their issued permit must be given to the Aspen Building Dept before we issue our
permit.
/ hereby certify that the above information is true and complete.
Owner______________________________ Phone #___________________________
Applicant (print name)_________________________________ Phone η___________________
Applicant Signature ___________________________________ Date ______________________
Please conƚacƚ ƚŚe ƵildinŐ DeƉarƚŵenƚ aƚ ďƵildinŐƐƵƉƉorƚΛaƐƉen͘Őoǀ at any time if you have questions about
asbestos, interpreting your test results, or other matters.
AZSS͗ ____________________________PERMIT NUMBER: _______________________________
Eovember 2022
820 E. Hyman Ave., Aspen
X
Marshall Webb 610.649.1975
Rob Sinclair 970.948.4269
26 May 2023
801 E. Hopkins Ave|Unit 5, Aspen
x
Andrew Eisenberg
01 December 2023
970.948.4269
970.925.4269
12/11/2023
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY
CITY OF ASPEN 427 RIO GRANDE PL | ASPEN, CO 81611
Applicability: All development projects must comply with the City’s njoning regulations, including height and
location, and are subject to periodic inspection during construction and a final inspection prior to project
completion. then required by the City’s oning Oĸcer, certain development projects within the City of Aspen
shall verify height andͬor location compliance through submission of a survey report.
Unless otherwise edžempted, all commercial, multiͲfamily, lodging, and midžedͲuse projects proposed within one
foot of the madžimum permissible height or within one foot of allowable setbacks shall verify njoning compliance
through this method.
In addition, the oning Oĸcer may require this method be used to verify njoning compliance for singleͲfamilyͬ
dupledž development or other projects where compliance may be in question. Independent of this policy, all
projects must comply with all applicable njoning limitations.
The oning Oĸcer will inform the applicant during building permit review if verification will be required.
,owever, circumstances may require njoning compliance verification of a project which is already underway.
Timing: ,eight verification should be accomplished at a point of construction when enough roof structure is in
place to accurately measure the structure yet early enough in the process to still make changes if the structure
is too tall. >ocation verification should be accomplished at a point of construction when the final edžterior of the
structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer
with the oning Oĸcer regarding the timing of njoning compliance verification. Applicants are encouraged to
perform their own verification during construction to ensure the building is progressing to plan, including the
height and location of foundation forms prior to concrete pours.
Survey Report: A Colorado Professional >and Surveyor shall describe and depict the height and location of a
structure compared to the dimensions shown on the njoning sheets of the approved building permit plan set. The
City’s oning Oĸcer can assist in determining which elements of the structure should be measured and if natural
or finished grade should be used.
The report shall include the following information:
ϭͲA brief cover letter with the building permit number, name of the project, name of the owner and general
contractor, with a written description of the measurement methods including date(s) of measurement.
ϮͲ&or location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope
(if applicable), location of foundation walls, location of the outermost edžterior of each structure (inclusive of all
edžterior veneer or other edžterior treatments), and the location and dimension of each observed measurement.
ϯͲ&or height verification: Elevation drawing(s) showing the natural or finished grade of the property, madžimum
permitted height, building elevations including the nominal roof form (inclusive of the first layer of edžterior
sheathing or weatherproofing membrane but edžcluding all edžterior surface treatments such as shakes, shingles,
or other veneer treatments orornamentation), and the location and dimension of each observed measurement.
Additional roof plans showing location of measurements may be necessary.
AZSS͗ ____________________________PERMIT NUMBER: _______________________________
Eovember 2022
820 E. Hyman Ave., Aspen801 E. Hopkins Ave|Unit 5, Aspen
12/11/2023
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY
CITY OF ASPEN 427 RIO GRANDE PL | ASPEN, CO 81611
ϰͲPlans and elevations must include height or setback edžemption items unique to the building, such as stairͬ
elevator overruns, utilityͬmechanical apparatus, hot tubs and spas, and other height or setback edžemption items
unique to the project.
ϱͲThe report shall include a written description or drawing notes of the benchmarks or control points used to
establish property boundaries, setbacks, building location, building height,and grades for each measurement.
ϲͲAll drawings must correlate with the building locations, elevations, and gradingͬdrainage representations in
the approved building permit set.
ϳͲThe report must include the signature, date, and stamp of Colorado Professional >and Surveyor who
conducted the field measurements certifying that the field measurements areaccurately represented.
Review and Acceptance of Report: The oning Oĸcer shall review the report(s) and either confirm the project
conforms to the dimensions shown on the njoning sheets of the approved building permit plan set and meets
the njoning limitations for the property or shall determine which elements of the project are not in compliance.
The oning Oĸcer may request additional information to verify njoning compliance, which may include but is not
limited to additional survey work or a site visit.
All drawings of the survey report must correlate with representations in the approved building permit set for
acceptance. Modifications to field conditions or amendments to the building permit may be required.
A determination of nonͲcompliance shall result in the issuance of a correction notice and possible work
stoppage. Applicants are encouraged to verify njoning compliance as early as reasonably practical in the
construction process to miniminje disruption to the construction schedule.
Acknowledgment:
I (contractor name) ______________________________ understand this policy. I agree that this project will
comply with the njoning limitations affecting this parcel and the representations made on the njoning sheets of
the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this
project complies with all applicable njoning limitations.
Contractor Signature: ___________________________________________
Date: ________________________________________________________
ADDRESS: ____________________________WZMId EhMZ͗ _______________________________
Eovember 2022
820 E. Hyman Ave., Aspen
Rea Coulter
26 May 2023
801 E. Hopkins Ave|Unit 5, Aspen
01 December 2023
12/11/2023