Loading...
HomeMy WebLinkAboutFile Documents.634 W Hopkins Ave.0106-2021-BRESKumar & Associates TABLE 1 PERCOLATION TEST RESULTS PROJECT NO. 20-7-582 HOLE NO. HOLE DEPTH (INCHES) LENGTH OF INTERVAL (MIN) WATER DEPTH AT START OF INTERVAL (INCHES) WATER DEPTH AT END OF INTERVAL (INCHES) DROP IN WATER LEVEL (INCHES) AVERAGE PERCOLATION RATE (MIN./INCH) 56 54½ 1½ 2.7 B-1 132 4 54½ 53½ 1 4 53½ 52½ 1 4 52½ 51½ 1 4 51½ 50½ 1 4 Water Added 61 59 2 2 59 58¼ ¾ 5.3 Note: The percolation test was conducted in the completed 4-inch diameter borehole on October 19, 2020.