HomeMy WebLinkAboutFile Documents.634 W Hopkins Ave.0106-2021-BRES (17)Comment Resubmittal – Round 1 – Colorado Code Consulting – 634 W. Hopkins_0106-2021-
BRES
Page 1
215 S. Monarch Suite G-102 Aspen, Colorado 81611
P 970.544.4856 Email joseph@S2architects.com
Feb 24, 2022
Project: 634 W. Hopkins – Ski Haus Remodel
Permit Comments Round 1: Colorado Code Consulting
Building Review Comments / Response
Response: See updated RCP’s showing smoke and CO detection devices as required.
Response: See attached revised REMP.
Response: See added notes and details on 1/A5.4
Response: Note added to Main Level Floor Plan and Site Plans.
Comment Resubmittal – Round 1 – Colorado Code Consulting – 634 W. Hopkins_0106-2021-
BRES
Page 2
215 S. Monarch Suite G-102 Aspen, Colorado 81611
P 970.544.4856 Email joseph@S2architects.com
Response: Stair drywall is now noted on A2.4 and all sections and stair drawings. The handrail is not
recessed. Detail is now on 1/A5.7
Response: See detail 3/A5.7
Response: We have noted using Non-asbestos fiber-cement backer board meeting ASTM C1288 floor plans
and W18 & W19 on A6.2
Response: Safety glazing is noted on A7.2 of the unit.
Response: This has been added to Note 2
Response: Added to sheet M-603
Response: Added sizes
Response: Updated schedule and tags on drawings
Comment Resubmittal – Round 1 – Colorado Code Consulting – 634 W. Hopkins_0106-2021-
BRES
Page 3
215 S. Monarch Suite G-102 Aspen, Colorado 81611
P 970.544.4856 Email joseph@S2architects.com
Response: Sizes added to ducts
Response: Kitchen hood make-up air added to FC-1
Response: Schedule updated, 4 units for fan coils, 2 for mini splits
Additional Revisions:
Vent Calc: Updated, we calculated 72 CFM. 100 CFM provided by ERV
Gas Meter: Moved away from door
Plumbing: Updated water line entry to match Civil
Plumbing: Added radon detail to sheets