Loading...
HomeMy WebLinkAboutFile Documents.634 W Hopkins Ave.0106-2021-BRES (17)Comment Resubmittal – Round 1 – Colorado Code Consulting – 634 W. Hopkins_0106-2021- BRES Page 1 215 S. Monarch Suite G-102 Aspen, Colorado 81611 P 970.544.4856 Email joseph@S2architects.com Feb 24, 2022 Project: 634 W. Hopkins – Ski Haus Remodel Permit Comments Round 1: Colorado Code Consulting Building Review Comments / Response Response: See updated RCP’s showing smoke and CO detection devices as required. Response: See attached revised REMP. Response: See added notes and details on 1/A5.4 Response: Note added to Main Level Floor Plan and Site Plans. Comment Resubmittal – Round 1 – Colorado Code Consulting – 634 W. Hopkins_0106-2021- BRES Page 2 215 S. Monarch Suite G-102 Aspen, Colorado 81611 P 970.544.4856 Email joseph@S2architects.com Response: Stair drywall is now noted on A2.4 and all sections and stair drawings. The handrail is not recessed. Detail is now on 1/A5.7 Response: See detail 3/A5.7 Response: We have noted using Non-asbestos fiber-cement backer board meeting ASTM C1288 floor plans and W18 & W19 on A6.2 Response: Safety glazing is noted on A7.2 of the unit. Response: This has been added to Note 2 Response: Added to sheet M-603 Response: Added sizes Response: Updated schedule and tags on drawings Comment Resubmittal – Round 1 – Colorado Code Consulting – 634 W. Hopkins_0106-2021- BRES Page 3 215 S. Monarch Suite G-102 Aspen, Colorado 81611 P 970.544.4856 Email joseph@S2architects.com Response: Sizes added to ducts Response: Kitchen hood make-up air added to FC-1 Response: Schedule updated, 4 units for fan coils, 2 for mini splits Additional Revisions: Vent Calc: Updated, we calculated 72 CFM. 100 CFM provided by ERV Gas Meter: Moved away from door Plumbing: Updated water line entry to match Civil Plumbing: Added radon detail to sheets