HomeMy WebLinkAboutFile Documents.634 W Hopkins Ave.0106-2021-BRES (34)
WATER EFFICIENT LANDSCAPING STANDARDS (WELS) ORDINANCE
Information & Documentation Checklist
IMPORTANT: This checklist does not constitute approval of the WELS review. This document is to
inform the applicant and the City of what constitutes a complete WELS application.
Template Last Updated: 7/2/2021 Page 1 of 3
Effective August 13, 2018, the City of Aspen Water Efficient Landscaping Standards, Ordinance 17, Series
2018, shall apply to the following projects that use City of Aspen potable water:
WELS Section 2.1.1- Landscaping, grading, installing or disturbing hardscapes, additions to
structures, etc. that has a disturbance area greater than 1,000 square feet and greater than 25% of the
entire site.
WELS Section 2.1.2- All building permits that trigger a “substantial remodel” per Title 25 of the
Municipal Code, defined as the increase by fifty percent (50%) or more in the water using capacity of
new water using devices or fixtures installed on a property, as measured by the ECU rating of the
existing and proposed structure(s).
_______________________________________________________________________________________
Links to the Water Efficient Landscaping Standards, the Water Budget Analysis & Calculation Sheet, the
WELS Documentation Requirements, and Example Plans can be found at:
www.cityofaspen.com/199/Landscape-Ordinance. For assistance in compiling required documentation
package, please contact Rick Magill, WELS Plans Reviewer at rick.magill@cityofaspen.com.
WATER SUPPLY INFORMATION
If water is to be provided by City of Aspen, the Applicant must answer the following questions:
1. Is the property already receiving City of Aspen water service? ٱ Yes ٱ No
2. Is there a well or wells on the property? ٱ Yes ٱ No
3. Are there other water sources/supplies on the property? ٱ Yes ٱ No
If yes, name other water sources/supplies:
4. Will raw water be used for irrigation on this property? ٱ Yes ٱ No
If yes, provide proof of a raw water agreement, an account number, and/or proof of right.
5. Are there existing city water taps to be disconnected? ٱ Yes ٱ No
6. What is the total number of drip emitters in proposed irrigation system? ___________________________
7. What is the total (in square feet) of overhead spray area in the proposed irrigation system? ____________
X
X
X
X
X
1537 SF
1,550
WELS Information and Documentation Checklist continued
Template Last Updated: 7/2/2021 Page 2 of 3
REQUIRED INFORMATION AND DOCUMENT CHECKLIST
PROJECT INFORMATION
Date:
Project Address:
Project Type (e.g. New Construction, Redevelopment, Remodel, Addition):
Total Property in Sq. Ft.: *Disturbance Area in Sq. Ft.:
*Disturbance Area is defined as the external area of the building site where the ground is disturbed, which includes, but is not limited to: soil grading, landscaping, removing impervious area, adding impervious area, replacing impervious area, layback areas, and stock pile areas.
Total Landscaped Area in Sq. Ft: Irrigated Area in Sq. Ft.:
**Affected Area in Sq. Ft.:
**Affected Area is the building square footage plus the
disturbance area, with the building square footage equaling the
building footprint alteration plus the new square footage.
Zone District: Non-Irrigated Right-of-Way Area:
Irrigated Right-of-Way Area: Non-Irrigated Native Area:
Exterior Hardscape (Impervious) Area: Structure(s) Footprint Area:
What is the water using capacity of new water using devices or fixtures installed on a property, as measured by the ECU rating of the existing and proposed structure(s);
AUTHORIZED PROJECT/ OWNER REPRESENTATIVE
Project/Owner Representative Name: Project/Owner Rep. Ph:
Project/Owner Rep. Email:
Irrigation Designer Name: Irrigation Designer Email:
Landscape Designer Name: Landscape Designer Email:
PROPERTY OWNER INFORMATION
Owner Name:
Mailing Address: City Water Acct. Number:
Phone: Email:
2021-04-08
634 W Hopkins Ave, Aspen, CO 81611
Remodel
R-6
Chris Madigan, Madigan + Co 970.319.2232
chris@madiganco.co
tomb@hydrosystemskdi.com
jane@liftstudiolandscape.netJane Lanter, Lift Studio
Tom Beall, HSKDI
4572 Telephone Rd #912, Ventura, CA 93993
Loralee West
01-25037140-00
2,522 SF 0SF
0SF
Existing TBD; Proposed 3.75
2,205 SF
2,326 SF
6,000 SF
5,138 SF
4,363SF 4,363SF
7,343SF
WELS Information and Documentation Checklist continued
Template Last Updated: 7/2/2021 Page 3 of 3
REQUIREMENTS: COMMENTS: SUBMITTAL COMPLIANCE Checked
by Plan Reviewer:
Site Development Plan Identify Development/Disturbance Area ٱ Yes ٱ No
Landscape Design Plan, and Soils/Soil
Amendment Information Required Components Listed in the WEL Standards ٱ Yes ٱ No
Irrigation Design Plan, and Hydrozone Information Required Components Listed in the WEL Standards ٱ Yes ٱ No
Water Budget Calculation Worksheet Required Component Listed in the WEL Standards ٱ Yes ٱ No
Pools & Water Features (spas, pools, ponds, fountains, etc.) Is there a pool, spa, or water feature? ٱ Yes ٱ No
Are pool and spa covers proposed? ٱ Yes ٱ No
Do features use a recirculating water system and/or recycled water? ٱ Yes ٱ No
APPLICANT ACKNOWLEDGEMENT
I/we agree to comply with the requirements of the City of Aspen Water Efficient Landscaping Standards and submit a
complete Site Plan, Landscape Plan, Soils Standards, Irrigation Plan, Hydrozone Plan, and Water Budget Documentation
Packet for review by the City of Aspen.
Applicant Signature Date
Print Name
FOR INTERNAL USE ONLY:
CHECKLIST REVIEWED BY: ____________________________________
DATE: ___________________________________
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
WELS REVIEW IS NOT REQUIRED (Documentation reviewed by the signatory below)*
AUTHORIZED BY: ____________________________________
DATE: __________________________________
*Please be advised that even though this signature confirms a WELS review is not required at this time, a WELS
review may be required at a later date if either of the above thresholds related to disturbance area (WELS Section
2.1.1) or increased water use capacity (WELS Section 2.1.2) on the Subject Property is met or exceeded during the
course of the permit review or construction processes. Please plan accordingly.
2021-04-08
Jane Lanter