Loading...
HomeMy WebLinkAboutFile Documents.688 Spruce St.0046-2022-BCHO (14)Revised October 14th, 2022 Landscape & Irrigation Estimate Project: Brian Pearson 688 Spruce Street (MNKN LLC.)Cell: (970) 379-2091 Aspen, Colorado 81611 Email: Brian@KORULTD.com Plan: 688 Spruce Street, 100% Construction Documents - 16 Pages; - Dated: October 16th, 2020, Revised (ASI 02) April 29th, 2022 - Scale: Multiple Description Size Qty Total General Conditions Ls 1 $57,076 Irrigation $143,708 Irrigation System Ls 1 Submittal Packet and Testing for City of Aspen WELS Approval Ls 1 Trees (per Plant List on L0-04, pg 3)$184,620 Colorado Spruce 18'8 Colorado Spruce 16'8 Colorado Spruce 12'21 Colorado Spruce 'hoopsii' SUB TO CO SPRUCE PER MIKE A. (DWI)16'8 Colorado Spruce 'hoopsii' SUB TO CO SPRUCE PER MIKE A. (DWI)12'3 Aspen - Single Stem 2.5"35 Aspen - Multi-Stem 2.5"28 Aspen - Single Stem 3"6 Aspen - Single Stem 4"0 Acer Glabrum / Rocky Mountain Maple #15 19 Stake / Guy Ea.136 Backfill Cy 68 Shrubs (per Plant List on L0-04, pg 3 - Matches Takeoff)Sf 4237 $60,521 Cornus sericea 'Bailey' / Redtwig Dogwood 'Bailey'#5 95 Crataegus douglasii / Douglas Hawthorn 5' B&B 30 Hydrangea paniculata 'Dvppinky' Pinky-Winky / Pinky Winky Hydrangea #5 17 Hydrangea arborescens 'Annabelle' / Annabelle Smooth Hydrangea #5 17 Rhus aromatica 'Gro-Low' / Gro-Low Sumac #5 199 Rubus parviflorus / Thimbleberry - Sub Boulder Raspberry F15 44 Syringa vulgaris / Common Purple Lilac #5 16 Pinus mugo 'Rostrata' / Rostrata Mugo Pine 3' B&B 39 Backfill Cy 41 Grasses (per Plant List on L0-04, pg 3 - Matches Takeoff)Sf $6,550 Helictotrichon sempervirens / Blue Avena Grass #1 262 688 Spruce Street - Estimate Landscape Development / Maintenance 485 County Road 112 (Mailing) • 409 Dolores Way (Physical) • Carbondale, Colorado 81623 • Office: (970) 963 0950 12/08/2022 Revised October 14th, 2022 Landscape & Irrigation Estimate Project: Brian Pearson 688 Spruce Street (MNKN LLC.)Cell: (970) 379-2091 Aspen, Colorado 81611 Email: Brian@KORULTD.com Plan: 688 Spruce Street, 100% Construction Documents - 16 Pages; - Dated: October 16th, 2020, Revised (ASI 02) April 29th, 2022 - Scale: Multiple Description Size Qty Total 688 Spruce Street - Estimate Perennials / Groundcovers (per Plant List on L0-04, pg - Matches Takeoff)Sf 1523 $17,975 Aquilegia caerulea / Rocky Mountain Columbine #1 78 Rudbeckia hirta / Black-Eyed Susan #1 65 Salvia sylvestris 'May Night' / May Night Salvia #1 159 Echinacea purpurea / Purple Coneflower #1 80 Achillea millefolium / Common White Yarrow #1 107 Nepeta faassenii / Walker's Low Catmint F-15 23 Turf (per Plant List on L0-04, pg 3)Sf 5258 $10,499 Fine grading Sf 3698 Kentucky Bluegrass Sf 3698 Fine grade Sf 1560 No-Mow Fescue Sf 1560 Native Revegetation Sf 26405 $14,523 Fine grading Sf 26405 Pitkin County Irrigated #2 (With Wildflowers)Sf 26405 Soils $63,375 Turf (Incl. No-Mow) - Topsoil @ 6"Cy 100 Native - Topsoil @ 3"Cy 245 Perennial Beds - Compost @ 12"Cy 70 Shrub Beds - Compost @ 6" Cy 80 Stone Pavers CUT - Sand Set Sf 256 $21,760 Crusher Fines Pathway Sf 60 $1,800 Bocce Court (Surface Items - DG or Local Product)Sf 770 $26,950 Mulch Path Sf 505 $2,525 Mulch Cy 110 $15,950 Landscape Development / Maintenance 485 County Road 112 (Mailing) • 409 Dolores Way (Physical) • Carbondale, Colorado 81623 • Office: (970) 963 0950 12/08/2022 Revised October 14th, 2022 Landscape & Irrigation Estimate Project: Brian Pearson 688 Spruce Street (MNKN LLC.)Cell: (970) 379-2091 Aspen, Colorado 81611 Email: Brian@KORULTD.com Plan: 688 Spruce Street, 100% Construction Documents - 16 Pages; - Dated: October 16th, 2020, Revised (ASI 02) April 29th, 2022 - Scale: Multiple Description Size Qty Total 688 Spruce Street - Estimate Metal Edging Lf 0 $0 Close-Out / Clean-Up / DeMob Ls 1 $21,974 Project Total:$649,806 Additional Pricing: Maintenance - 3 Year Contract (TBD Based on final site walkthrough)TBD TBD Vegetable Garden Planter (30" high - 6" x 6" treated landscape timbers)Lf 40 $14,000 Qualifications: 1. Grade to be received +/- 1/10th of a foot clean and ready to drain, including any clear and grub. 2. The following items are considered by others; secondary locates, demo, excavation, power, concrete, veneer, sleeving, Garden Gate and Fence, Dog Run Fence and Gate, Fire Feature, Wood Deck, Bocce Court. 3. All electrical is by others; including power to any pumps, meters, clocks, transformers, etc.. 4. If plant material or seed is unavailable substitutions will be necessary. 5. Crane, if needed, will be invoiced at cost plus 15%. 6. Secondary (Private) Locates, Site Services (Including Anything Required for COVID) and Consulting shall be invoiced at Cost +15%. 7. This pricing is valid for 7 days. Please add 7.5% per annum to the total for scope needed beyond 2022. 8. We reserve the right to pass along increases we incur. Landscape Development / Maintenance 485 County Road 112 (Mailing) • 409 Dolores Way (Physical) • Carbondale, Colorado 81623 • Office: (970) 963 0950 12/08/2022