Loading...
HomeMy WebLinkAboutFile Documents.614 E Cooper Ave.0029-2024-BCOM (19)HOOD TA B L E G G G A C 1 5 5.2 3 B B.2 2 D 5.1 413'-9 3/4"15'-1"7'-6 1/4"9'-2 1/4"29'-1 1/2" 16 ' - 6 3 / 4 " 14 ' - 6 3 / 4 " 9' - 0 " 3' - 6 " 3'-0"2'-6"1' - 1 0 " 1' - 7 " 2'-6" 4' - 4 " 1' - 7 " 2'-6" 4' - 4 " 1'-7" 2' - 6 " 4'-4" ADA SEATING 28"-34" TABLE HEIGHT 27"-29" KNEE HEIGHT CLEARANCE 19" UNDER TABLE KNEE CLEARANCE ADA SEATING 28"-34" TABLE HEIGHT 27"-29" KNEE HEIGHT CLEARANCE 19" UNDER TABLE KNEE CLEARANCE INTERIOR SEATING : 8 ORIGIN BAR SEATING : 14 INTERIOR SEATING : 19 INTERIOR SEATING : 3 COMMON PATH OF TRAVEL 42' -4" KITCHEN KITCHEN COMM. 371 SF LOAD FACTOR NO. OF OCCUPANTS 200 G.2 TO SWING IN THE DIRECTION OF EGRESS PER IEBC 805.4.2 TO SWING IN THE DIRECTION OF EGRESS PER IEBC 805.4.2 ADA BAR AND COMPANION SEATING 28"-34" TABLE HEIGHT 27"-29" KNEE HEIGHT CLEARANCE 19" UNDER TABLE KNEE CLEARANCE TOTAL INTERIOR SEATING : 44 TOTAL EXTERIOR SEATING : 04'-4"1'-7"R 2 '-9 1 /2 "3'-0"MIN.3'-0"MIN. 3' - 0 " M I N . EXTERIOR COORIDOR AND SHARED BATHROOMS FOR REFERENCE ONLY2'-6"4'-4"1'-7"3' - 0 " 4'-2 1/2"3'-0"LOW BAR 3 A-100 G-002 2 3 4CLR5'-9"CLR9'-10 1/2"3'-0"OCCUPANCY SPACE SF AREA LOAD FACTOR OCCUPANTS EXTERIOR SEATING INTERIOR SEATING KITCHEN 0 44 2200 GROSS371 STAFF 3 TOTAL OCCUPANTS : 49 CO P Y R I G H T c 2 0 2 3 T H U N D E R B O W L THUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 AR C H I T E C T S TH U N D E R B O W L SCALE PROJECT DATE 1/4" = 1'-0" 61 4 E C O O P E R A V E AS P E N , C O L O R A D O PA R C E L I D # 2 7 3 7 1 8 2 2 5 0 0 5 PROPOSED EGRESS AND OCCUPANCY PLAN PROJECT NUMBER G-001 XX/XX/20XX REVISION 1 N 1/4" = 1'-0"G-001 1 EGRESS AND OCCUPANCY PLAN 09/27/2024 justinh 09/27/2024 Door clearance cannot overlap the sink, full 48" depth door clearance to be field verified. 5.2 0' - 9 " 4' - 4 " 2'-6" D5'-7" 5'-0" 4' - 8 " 5'-0" 4' - 0 " 4' - 0 " 0'-8" 2' - 1 0 " 3' - 4 " 0'-11"0'-6" BOTTOM OF MIRROR REFLECTING SURFACE 40" MAX ABOVE FLOOR PER ICC / A117.1-2009 SECTION 603.3 PLUMBING MUST BE PROTECTED FROM CONTACT PER 1CC / A117.1-2009 SECTION 606.6 TOE AND KNEE CLEARANCE 0' - 9 " 2' - 3 " 1' - 6 " 3' - 4 " 3'-4" 3'-6"1'-0" 4'-6" 0'-1 1/2" DISPENSER LOCATION 1' - 5 " 0' - 1 1 / 2 " 2'-0" 3'-6" 1'-4" 1' - 5 " 3' - 0 " 0'-1 1/2" 1'-0"2'-0" CO P Y R I G H T c 2 0 2 3 T H U N D E R B O W L THUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 AR C H I T E C T S TH U N D E R B O W L SCALE PROJECT DATE As indicated 61 4 E C O O P E R A V E AS P E N , C O L O R A D O PA R C E L I D # 2 7 3 7 1 8 2 2 5 0 0 5 ADA PROJECT NUMBER G-002 XX/XX/20XX REVISION 1 3/4" = 1'-0"G-002 1 ADA BATH PLAN 1/2" = 1'-0"G-002 2 ADA BATH ELEVATION 1 1/2" = 1'-0"G-002 3 ADA BATH ELEVATION 2 1/2" = 1'-0"G-002 4 ADA BATH ELEVATION 3 09/27/2024 Door clearance cannot overlap the sink, full 48" depth door clearance to be field verified. 09/27/2024 justinh DN UP HOOD TA B L E G G G HOOD TA B L E G G G A C 1 5 5.2 3 B B.2 2 D 5.1 413'-9 3/4"60'-11" 9' - 5 " 16 ' - 6 3 / 4 " 14 ' - 6 3 / 4 " 9' - 0 " 2' - 2 " 3' - 0 "3'-0" MIN.2'-2"4'-2 1/2"0'-6"12'-0" 1' - 5 " 0' - 5 " 0' - 4 " 2' - 0 " 3' - 6 " KITCHEN 100 BAR 105 DINING ROOM 103 2' - 0 " EXISTING FIRE PLACE TO REMAIN EXISTING WALL SHELVING TO REMAIN 1' - 3 " A-2001 A-200 2 15'-1"7'-6 1/4"9'-2 1/4"29'-1 1/2" WAWA 2/A-100 2/A-100 2'-4 1/2" 3' - 9 " COAT CLOSET 104 OPEN SHELVING BANQUETTE SEATING BANQUETTE SEATING BANQUETTE SEATING 3' - 0 " EXTERIOR COORIDOR AND BATHROOMS FOR REFERENCE ONLY WAITER STATION 0'-3 1/2" 0'-6" 0'-5" 1'-3" DISH WASHING 102 8'-9" ICE DW WATER FILLER 8'-8 1/4"3'-5 3/4" 0' - 3 1 / 2 " 0' - 4 1 / 2 " 0' - 5 1 / 2 " 5' - 5 1 / 4 " 2'-7 3/4"6'-2 1/4" 3' - 0 " 3' - 0 " NEW VENT FOR TYPE 1 HOOD A-100.1 1 NOTE:EXISTING COLUMNS MIN. PROTECTION FOR STRUCTURAL INTEGRITY PER IBC TABLE 722.2.4 SILICEOUS COLUMNS THICKNESS OF 1'-3"x1'-3" MEETS 3 HOUR FIRE RATING. A-100.1 2 3'-0" CLR 3' - 0 " POS STATION 3' - 0 " T.O. 100'-0" T.O. 100'-6 1/4" T.O. 100'-0" EXISTING BENCH SEATING TO REMAIN 3'-1 1/2" 0'-3 1/2" 1:12 SLOPED RAMP 12 ' - 3 " 6' - 3 " 3' - 0 " EXIT 28 EXIT 28LOW BAR3 A-100 DUMPSTER / TRASH HOOD ABOVE 2' - 1 1 / 4 " 6'-0" 4' - 0 " 3'-1 3/8" 2' - 9 3 / 4 " 1'-6"Ø 0'-10"Ø 2'-1 1/2" G-002 14'-6 1/2"0'-3 1/2"10'-0"0'-3 1/2"5'-10 1/2"0'-4"3'-0"PROPOSEDFLOOR PLAN GENERAL NOTES 1. ALL WALLS WITH SHEAR PLYWOOD SHALL HAVE A CONTINUOUS FLUSH FINISH. FURR WALLS OR CONTINUE PLYWOOD TO MAINTAIN THE REQUIRED FLUSH FINISH. 2. OFFSET STUDS WHERE REQUIRED SO THAT FINISH WALL SURFACES WILL BE FLUSH. 3. PROVIDE BLOCKING FOR ALL ARTWORK, TOWEL BARS AND TISSUE HOLDERS, TYP. 4. PROVIDE WATER RESISTANT GYPSUM BOARD BEHIND ALL PLUMBING FIXTURES, UNDER AND AROUND TUB AND SHOWER ENCLOSURES TO A HEIGHT OF 70" MIN. ABOVE THE DRAIN INLET. , OR APPROVED BACKER BOARD UNDER TILE. 5. FINISH MATERIALS FOR ALL BATHS, SHOWERS, WALLS AT SHOWER ENCLOSURES SHALL HAVE A SMOOTH, HARD, NON-ABSORBANT SURFACE SUCH AS TILES/CERAMIC TILES, PORTLANT CEMENT OR EQ. LEGEND SEE G-000 FOR SYMBOLS NOT SHOWN HERE (E) CONST. TO BE REMOVED EXISTING CONSTRUCTION NEW CONSTRUCTION NEW MASONRY WALL OR WOOD STUD WALL, TYP 5/8" GYP FINISH PER INTERIOR INSULATION PER SCHEDULE INTERIOR VARIES (X) MAIN LEVEL + 100'-0" (X) T.O. UNIT CEILING + 111'-7" A 0' - 6 1 / 4 " 2' - 0 " 8' - 0 3 / 4 " 10 ' - 0 " 4'-6" THRESHOLD BEYOND 4'-0" 1'-6"Ø 10 ' - 7 1 / 4 " T.O. 2ND FLOOR STRUCTURE + 113'-0 5/8" 7' - 0 " 2' - 0 " 12 ' - 2 " 2'-9 3/4" CO P Y R I G H T c 2 0 2 3 T H U N D E R B O W L THUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 AR C H I T E C T S TH U N D E R B O W L SCALE PROJECT DATE As indicated 61 4 E C O O P E R A V E AS P E N , C O L O R A D O PA R C E L I D # 2 7 3 7 1 8 2 2 5 0 0 5 PROPOSED MAIN LEVEL FLOOR PLAN PROJECT NUMBER A-100 1/4" = 1'-0"A-100 1 PROPOSED MAIN LEVEL FLOOR PLAN N 1 1/2" = 1'-0"A-100 2 TYP. WA INTERIOR WALL 1/4" = 1'-0"A-100 3 SECTION @ KITCHEN HOOD 09/27/2024 09/27/2024 justinh HOOD TA B L E G G G A C 1 5 5.2 3 B B.2 2 D 5.1 4 15'-1"7'-6 1/4"9'-2 1/4"29'-1 1/2"13'-9 3/4"16 ' - 6 3 / 4 " 14 ' - 6 3 / 4 " 9' - 0 " +11'-8" +10'-7" +11'-8" +7'-9"+10'-11" TYPE 1 HOOD 0'-5"8'-7 1/2" 3'-0 1/2" TYPE 2 HOOD NEW CEILING TILE GRID SYSTEM WITH LIGHTING FIXTURES +9'-0" CF-1 EXISTING LIGHTS IN NEW LOCATION 1'-6"1'-6" 2' - 1 1 / 2 " 2' - 0 " 2' - 0 " 2' - 0 " 2' - 0 " 2' - 1 1 / 2 " 273 SF EXISTING FIRE RATED CEILING TO REMAIN 3 A-100 CF-1CF-1 8'-0" RELFECTED CEILING PLAN GENERAL NOTES 1. ALL DIMENSIONS ARE TO FACE OF FIN., CENTER OF FIXTURE / REGISTER UNLESS NOTED OTHERWISE. 2. VERIFY IN FIELD ALL EXISTING DIMENSIONS. 3. LIGHT FIXTURES SHOWN ON THIS PLAN ARE FOR REFERENCE ONLY. SEE LIGHTING DRAWINGS FOR TYPE, LOCATIONS, AND CIRCUITING. 4. ALSO SEE INTERIOR ELEVATIONS FOR LOCATION OF SCONCES, TYP. 5. PAINT ALL RECESSED CAN TRIMS / MECHANICAL GRILLES THE COLOR OF THE CEILING IN WHICH THEY APPEAR. 6. COORDINATE FIXTURE LAYOUT WITH ALL EXISTING AND PROPOSED STRUCTURE. 7.CEILING ASSEMBLY MIN. PROTECTION FOR FLOOR AND ROOF SYSTEM PER TABLE 721.1(3) ITEM NUMBER 5-1.1 ASSEMBLY ASSUME SLAB THICKNESS OF 2" MEETS 3 HOUR FIRE RATING. 8. PROPOSED DESIGN ALTERS LESS THAN 10% OF THE FIXTURES IN THE EXISTING DINING SPACE AND NOT INCREASING OVERALL LOAD PER THE EXCEPTION TO ASPEN ENERGY CODE C503.5. 9.MECH SYSTEM SHALL PROVIDE NOTE LESS THAN 5 CFM PER PERSON OF OUTDOOR AIR AND NOT LESS THAN 15 CFM OF VENTILATION AIR PER PERSON. 10.LIGHTING TO REQUIRE BATTERY BACKUP ON ALL ISLES, CORRIDORS, STAIRS AND RAMPS LEGEND SEE COVER SHEET FOR SYMBOLS NOT SHOWN HERE SD SP +8'-0" SEE LIGHTING DRAWINGS FOR ALL LIGHT SYMBOLS AIR OUTLET, VERIFY WITH MECH. SUB. AIR INTAKE, VERIFY WITH MECH. SUB. CEILING MOUNTED SMOKE DETECTOR SPEAKER, VERIFY AV REQUIREMENTS WITH OWNER CEILING SOFFIT HEIGHT SYMBOL CO P Y R I G H T c 2 0 2 3 T H U N D E R B O W L THUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 AR C H I T E C T S TH U N D E R B O W L SCALE PROJECT DATE 1/4" = 1'-0" 61 4 E C O O P E R A V E AS P E N , C O L O R A D O PA R C E L I D # 2 7 3 7 1 8 2 2 5 0 0 5 PROPOSED MAIN LEVEL RCP PROJECT NUMBER A-101 1/4" = 1'-0"A-101 1 PROPOSED MAIN LEVEL RCP N 09/27/2024 09/27/2024 justinh