HomeMy WebLinkAboutFile Documents.614 E Cooper Ave.0029-2024-BCOM (19)HOOD
TA
B
L
E
G G
G
A
C
1 5
5.2
3
B
B.2
2
D
5.1
413'-9 3/4"15'-1"7'-6 1/4"9'-2 1/4"29'-1 1/2"
16
'
-
6
3
/
4
"
14
'
-
6
3
/
4
"
9'
-
0
"
3'
-
6
"
3'-0"2'-6"1'
-
1
0
"
1'
-
7
"
2'-6"
4'
-
4
"
1'
-
7
"
2'-6"
4'
-
4
"
1'-7"
2'
-
6
"
4'-4"
ADA SEATING
28"-34" TABLE HEIGHT
27"-29" KNEE HEIGHT CLEARANCE
19" UNDER TABLE KNEE CLEARANCE
ADA SEATING
28"-34" TABLE HEIGHT
27"-29" KNEE HEIGHT CLEARANCE
19" UNDER TABLE KNEE CLEARANCE
INTERIOR SEATING : 8
ORIGIN
BAR SEATING : 14
INTERIOR SEATING : 19
INTERIOR SEATING : 3
COMMON PATH OF TRAVEL 42' -4"
KITCHEN
KITCHEN COMM.
371 SF
LOAD
FACTOR
NO. OF
OCCUPANTS
200 G.2
TO SWING IN THE DIRECTION
OF EGRESS PER IEBC 805.4.2
TO SWING IN THE DIRECTION
OF EGRESS PER IEBC 805.4.2
ADA BAR AND COMPANION SEATING
28"-34" TABLE HEIGHT
27"-29" KNEE HEIGHT CLEARANCE
19" UNDER TABLE KNEE CLEARANCE
TOTAL INTERIOR SEATING : 44
TOTAL EXTERIOR SEATING : 04'-4"1'-7"R 2 '-9 1 /2 "3'-0"MIN.3'-0"MIN.
3'
-
0
"
M
I
N
.
EXTERIOR COORIDOR AND
SHARED BATHROOMS FOR
REFERENCE ONLY2'-6"4'-4"1'-7"3'
-
0
"
4'-2 1/2"3'-0"LOW BAR
3
A-100
G-002
2
3
4CLR5'-9"CLR9'-10 1/2"3'-0"OCCUPANCY
SPACE SF AREA LOAD FACTOR OCCUPANTS
EXTERIOR SEATING
INTERIOR SEATING
KITCHEN
0
44
2200 GROSS371
STAFF 3
TOTAL OCCUPANTS : 49
CO
P
Y
R
I
G
H
T
c
2
0
2
3
T
H
U
N
D
E
R
B
O
W
L
THUNDERBOWL
ARCHITECTS
300 S. SPRING ST. SUITE
201
ASPEN, CO 81611
AR
C
H
I
T
E
C
T
S
TH
U
N
D
E
R
B
O
W
L
SCALE
PROJECT
DATE
1/4" = 1'-0"
61
4
E
C
O
O
P
E
R
A
V
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
PA
R
C
E
L
I
D
#
2
7
3
7
1
8
2
2
5
0
0
5
PROPOSED
EGRESS AND
OCCUPANCY
PLAN
PROJECT NUMBER
G-001
XX/XX/20XX REVISION 1
N
1/4" = 1'-0"G-001
1 EGRESS AND OCCUPANCY PLAN
09/27/2024
justinh
09/27/2024
Door clearance cannot
overlap the sink, full
48" depth door
clearance to be field
verified.
5.2
0'
-
9
"
4'
-
4
"
2'-6"
D5'-7"
5'-0"
4'
-
8
"
5'-0"
4'
-
0
"
4'
-
0
"
0'-8"
2'
-
1
0
"
3'
-
4
"
0'-11"0'-6"
BOTTOM OF MIRROR REFLECTING
SURFACE 40" MAX ABOVE FLOOR
PER ICC / A117.1-2009 SECTION 603.3
PLUMBING MUST BE PROTECTED FROM
CONTACT PER 1CC / A117.1-2009
SECTION 606.6
TOE AND KNEE CLEARANCE
0'
-
9
"
2'
-
3
"
1'
-
6
"
3'
-
4
"
3'-4"
3'-6"1'-0"
4'-6"
0'-1 1/2"
DISPENSER
LOCATION
1'
-
5
"
0'
-
1
1
/
2
"
2'-0"
3'-6"
1'-4"
1'
-
5
"
3'
-
0
"
0'-1 1/2"
1'-0"2'-0"
CO
P
Y
R
I
G
H
T
c
2
0
2
3
T
H
U
N
D
E
R
B
O
W
L
THUNDERBOWL
ARCHITECTS
300 S. SPRING ST. SUITE
201
ASPEN, CO 81611
AR
C
H
I
T
E
C
T
S
TH
U
N
D
E
R
B
O
W
L
SCALE
PROJECT
DATE
As indicated
61
4
E
C
O
O
P
E
R
A
V
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
PA
R
C
E
L
I
D
#
2
7
3
7
1
8
2
2
5
0
0
5
ADA
PROJECT NUMBER
G-002
XX/XX/20XX REVISION 1
3/4" = 1'-0"G-002
1 ADA BATH PLAN
1/2" = 1'-0"G-002
2 ADA BATH ELEVATION 1
1/2" = 1'-0"G-002
3 ADA BATH ELEVATION 2
1/2" = 1'-0"G-002
4 ADA BATH ELEVATION 3
09/27/2024
Door clearance cannot
overlap the sink, full
48" depth door
clearance to be field
verified.
09/27/2024
justinh
DN
UP
HOOD
TA
B
L
E
G G
G
HOOD
TA
B
L
E
G G
G
A
C
1 5
5.2
3
B
B.2
2
D
5.1
413'-9 3/4"60'-11"
9'
-
5
"
16
'
-
6
3
/
4
"
14
'
-
6
3
/
4
"
9'
-
0
"
2'
-
2
"
3'
-
0
"3'-0" MIN.2'-2"4'-2 1/2"0'-6"12'-0"
1'
-
5
"
0'
-
5
"
0'
-
4
"
2'
-
0
"
3'
-
6
"
KITCHEN
100
BAR
105
DINING
ROOM
103
2'
-
0
"
EXISTING FIRE PLACE TO REMAIN
EXISTING WALL
SHELVING TO REMAIN
1'
-
3
"
A-2001
A-200
2
15'-1"7'-6 1/4"9'-2 1/4"29'-1 1/2"
WAWA
2/A-100
2/A-100
2'-4 1/2"
3'
-
9
"
COAT
CLOSET
104
OPEN SHELVING
BANQUETTE SEATING
BANQUETTE SEATING
BANQUETTE SEATING
3'
-
0
"
EXTERIOR COORIDOR AND
BATHROOMS FOR REFERENCE
ONLY
WAITER STATION
0'-3 1/2"
0'-6"
0'-5"
1'-3"
DISH
WASHING
102
8'-9"
ICE
DW
WATER FILLER
8'-8 1/4"3'-5 3/4"
0'
-
3
1
/
2
"
0'
-
4
1
/
2
"
0'
-
5
1
/
2
"
5'
-
5
1
/
4
"
2'-7 3/4"6'-2 1/4"
3'
-
0
"
3'
-
0
"
NEW VENT FOR
TYPE 1 HOOD
A-100.1
1
NOTE:EXISTING COLUMNS MIN. PROTECTION FOR
STRUCTURAL INTEGRITY PER IBC TABLE 722.2.4
SILICEOUS COLUMNS THICKNESS OF 1'-3"x1'-3"
MEETS 3 HOUR FIRE RATING.
A-100.1
2
3'-0" CLR
3'
-
0
"
POS STATION
3'
-
0
"
T.O.
100'-0"
T.O.
100'-6 1/4"
T.O.
100'-0"
EXISTING BENCH SEATING TO REMAIN
3'-1 1/2"
0'-3 1/2"
1:12 SLOPED
RAMP
12
'
-
3
"
6'
-
3
"
3'
-
0
"
EXIT
28
EXIT
28LOW BAR3
A-100
DUMPSTER / TRASH
HOOD
ABOVE
2'
-
1
1
/
4
"
6'-0"
4'
-
0
"
3'-1 3/8"
2'
-
9
3
/
4
"
1'-6"Ø 0'-10"Ø
2'-1 1/2"
G-002
14'-6 1/2"0'-3 1/2"10'-0"0'-3 1/2"5'-10 1/2"0'-4"3'-0"PROPOSEDFLOOR PLAN
GENERAL NOTES
1. ALL WALLS WITH SHEAR PLYWOOD SHALL HAVE A
CONTINUOUS FLUSH FINISH. FURR WALLS OR CONTINUE
PLYWOOD TO MAINTAIN THE REQUIRED FLUSH FINISH.
2. OFFSET STUDS WHERE REQUIRED SO THAT FINISH
WALL SURFACES WILL BE FLUSH.
3. PROVIDE BLOCKING FOR ALL ARTWORK, TOWEL BARS
AND TISSUE HOLDERS, TYP.
4. PROVIDE WATER RESISTANT GYPSUM BOARD BEHIND
ALL PLUMBING FIXTURES, UNDER AND AROUND TUB AND
SHOWER ENCLOSURES TO A HEIGHT OF 70" MIN. ABOVE
THE DRAIN INLET. , OR APPROVED BACKER BOARD UNDER
TILE.
5. FINISH MATERIALS FOR ALL BATHS, SHOWERS, WALLS
AT SHOWER ENCLOSURES SHALL HAVE A SMOOTH, HARD,
NON-ABSORBANT SURFACE SUCH AS TILES/CERAMIC
TILES, PORTLANT CEMENT OR EQ.
LEGEND SEE G-000 FOR SYMBOLS
NOT SHOWN HERE
(E) CONST. TO BE
REMOVED
EXISTING
CONSTRUCTION
NEW CONSTRUCTION
NEW MASONRY WALL
OR
WOOD STUD
WALL, TYP
5/8" GYP
FINISH PER INTERIOR
INSULATION PER SCHEDULE
INTERIOR
VARIES (X) MAIN LEVEL
+ 100'-0"
(X) T.O. UNIT CEILING
+ 111'-7"
A
0'
-
6
1
/
4
"
2'
-
0
"
8'
-
0
3
/
4
"
10
'
-
0
"
4'-6"
THRESHOLD
BEYOND
4'-0"
1'-6"Ø
10
'
-
7
1
/
4
"
T.O. 2ND FLOOR STRUCTURE
+ 113'-0 5/8"
7'
-
0
"
2'
-
0
"
12
'
-
2
"
2'-9 3/4"
CO
P
Y
R
I
G
H
T
c
2
0
2
3
T
H
U
N
D
E
R
B
O
W
L
THUNDERBOWL
ARCHITECTS
300 S. SPRING ST. SUITE
201
ASPEN, CO 81611
AR
C
H
I
T
E
C
T
S
TH
U
N
D
E
R
B
O
W
L
SCALE
PROJECT
DATE
As indicated
61
4
E
C
O
O
P
E
R
A
V
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
PA
R
C
E
L
I
D
#
2
7
3
7
1
8
2
2
5
0
0
5
PROPOSED
MAIN LEVEL
FLOOR PLAN
PROJECT NUMBER
A-100
1/4" = 1'-0"A-100
1
PROPOSED MAIN LEVEL FLOOR
PLAN
N
1 1/2" = 1'-0"A-100
2 TYP. WA INTERIOR WALL
1/4" = 1'-0"A-100
3 SECTION @ KITCHEN HOOD 09/27/2024
09/27/2024
justinh
HOOD
TA
B
L
E
G G
G
A
C
1 5
5.2
3
B
B.2
2
D
5.1
4
15'-1"7'-6 1/4"9'-2 1/4"29'-1 1/2"13'-9 3/4"16
'
-
6
3
/
4
"
14
'
-
6
3
/
4
"
9'
-
0
"
+11'-8"
+10'-7"
+11'-8"
+7'-9"+10'-11"
TYPE 1 HOOD
0'-5"8'-7 1/2"
3'-0 1/2"
TYPE 2 HOOD
NEW CEILING TILE
GRID SYSTEM WITH
LIGHTING FIXTURES
+9'-0"
CF-1
EXISTING LIGHTS
IN NEW LOCATION
1'-6"1'-6"
2'
-
1
1
/
2
"
2'
-
0
"
2'
-
0
"
2'
-
0
"
2'
-
0
"
2'
-
1
1
/
2
"
273 SF
EXISTING FIRE
RATED CEILING TO
REMAIN
3
A-100
CF-1CF-1
8'-0"
RELFECTED CEILING PLAN
GENERAL NOTES
1. ALL DIMENSIONS ARE TO FACE OF FIN., CENTER
OF FIXTURE / REGISTER UNLESS NOTED
OTHERWISE.
2. VERIFY IN FIELD ALL EXISTING DIMENSIONS.
3. LIGHT FIXTURES SHOWN ON THIS PLAN ARE FOR
REFERENCE ONLY. SEE LIGHTING DRAWINGS
FOR TYPE, LOCATIONS, AND CIRCUITING.
4. ALSO SEE INTERIOR ELEVATIONS FOR LOCATION
OF SCONCES, TYP.
5. PAINT ALL RECESSED CAN TRIMS / MECHANICAL
GRILLES THE COLOR OF THE CEILING IN WHICH
THEY APPEAR.
6. COORDINATE FIXTURE LAYOUT WITH ALL
EXISTING AND PROPOSED STRUCTURE.
7.CEILING ASSEMBLY MIN. PROTECTION FOR
FLOOR AND ROOF SYSTEM PER TABLE 721.1(3)
ITEM NUMBER 5-1.1 ASSEMBLY ASSUME SLAB
THICKNESS OF 2" MEETS 3 HOUR FIRE RATING.
8. PROPOSED DESIGN ALTERS LESS THAN 10% OF
THE FIXTURES IN THE EXISTING DINING SPACE
AND NOT INCREASING OVERALL LOAD PER THE
EXCEPTION TO ASPEN ENERGY CODE C503.5.
9.MECH SYSTEM SHALL PROVIDE NOTE LESS THAN
5 CFM PER PERSON OF OUTDOOR AIR AND NOT
LESS THAN 15 CFM OF VENTILATION AIR PER
PERSON.
10.LIGHTING TO REQUIRE BATTERY BACKUP ON
ALL ISLES, CORRIDORS, STAIRS AND RAMPS
LEGEND SEE COVER SHEET FOR
SYMBOLS NOT SHOWN HERE
SD
SP
+8'-0"
SEE LIGHTING DRAWINGS FOR
ALL LIGHT SYMBOLS
AIR OUTLET, VERIFY WITH
MECH. SUB.
AIR INTAKE, VERIFY WITH MECH.
SUB.
CEILING MOUNTED SMOKE
DETECTOR
SPEAKER, VERIFY AV
REQUIREMENTS WITH OWNER
CEILING SOFFIT HEIGHT
SYMBOL
CO
P
Y
R
I
G
H
T
c
2
0
2
3
T
H
U
N
D
E
R
B
O
W
L
THUNDERBOWL
ARCHITECTS
300 S. SPRING ST. SUITE
201
ASPEN, CO 81611
AR
C
H
I
T
E
C
T
S
TH
U
N
D
E
R
B
O
W
L
SCALE
PROJECT
DATE
1/4" = 1'-0"
61
4
E
C
O
O
P
E
R
A
V
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
PA
R
C
E
L
I
D
#
2
7
3
7
1
8
2
2
5
0
0
5
PROPOSED
MAIN LEVEL
RCP
PROJECT NUMBER
A-101
1/4" = 1'-0"A-101
1 PROPOSED MAIN LEVEL RCP
N
09/27/2024
09/27/2024
justinh