HomeMy WebLinkAboutFile Documents.105 Exhibition Ln.0008-2024-BROF (8)SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen
Municipal Code. Pursuant to
Sec.26.104.050, any permit or approval
issued in error or otherwise not in
conformity with the requirements of this
Title, shall be void. Similarly, any permit
or approval issued in reliance upon or
as a result of, a materially false
statement or representation made in
the process of obtaining the permit or
development approval shall, likewise,
be void. Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
Snow stops required at all locations
where roofs could shed snow onto
walkways, stairs, alleys, decks, exits,
utilities and meters, emergency escape
and rescue opening window wells, or
adjacent properties - Ordinance 1,
2023.
MID-ROOF AND FINAL
ROOF INSPECTIONS
REQUIRED TO RECEIVE A
LETTER OF
COMPLETENESS
Mid-Roof Inspection
REQUIRED
After your roof permit is issued,
and you have started work, you
must request a mid-roof
inspection.
Inspectors will verify your Class
A assembly on site.
You will request inspection
directly on SalesForce.
Final Roof Inspection
REQUIRED
Once roof work is complete, you
must request a final roof
inspection.
Inspectors will inspect snow
guards and heat tape (if
applicable).
NOTE: If there is heat tape
present, a final roof inspection
cannot be requested until the
sub-electrical permit is applied
for as both final inspections will
occur simultaneously.
PRODUCT DETAIL AND INSTALL
PRODUCT DETAIL AND INSTALL
INFORMATION: https://trasnowandsun.com/product/c22z-clamp-on/
DRAWN BY:
RE
L
E
A
S
E
D
F
O
R
E
S
T
I
M
A
T
I
O
N
D
A
T
E
:
RE
V
B
Y
:
DA
T
E
DE
S
C
R
I
P
T
I
O
N
1. ALL C22 SNOW FENCE EAVE COURSES TO BE
INSTALLED 12" FROM EAVE U.N.O.
PD1: C22 CLAMP-ON (SEE DT1.0 PAGE)
10
5
E
X
H
I
B
I
T
I
O
N
L
A
N
E
AS
P
E
N
,
C
O
MR
DECK MOUNT TYPE:
DECK SHEATHING:
MOUNT SPACING:
CLAMP-ON TYPE:
RIB HEIGHT:
GROUND SNOW LOAD:
BRACKET TYPE:
ROOFING MAT'L:
PANEL WIDTH:
SEAM TYPE:
HORIZONTAL EXPOSURE:
VERTICAL EXPOSURE:
N/A
N/A
N/A
C22
16" OC
1.5"
DOUBLE LOCK
N/A
N/A
STANDING SEAM
120 PSF
N/A
3/
2
1
/
2
4
16
5
7
S
o
u
t
h
5
8
0
E
a
s
t
A
m
e
r
i
c
a
n
F
o
r
k
,
U
T
,
8
4
0
0
3
Ph
:
8
0
0
.
6
0
6
.
8
9
8
0
|
E
m
:
i
n
f
o
@
t
r
a
s
n
o
w
a
n
d
s
u
n
.
c
o
m
|
t
r
a
s
n
o
w
a
n
d
s
u
n
.
c
o
m
CLIENT PROVIDED INFO
PROJECT LABELS
PROJECT NOTES
3/21/2024
653
290
20
2
4
0
3
1
8
-
1
0
1
0
5
E
x
h
i
b
i
t
i
o
n
.
d
w
g
SHEET OF
REVISIONS
APPROVED:
STAMP
SNOW RETENTION PLAN1
DUE TO SOLAR PANELS INTERFERING WITH THE SNOW RETENTION
INSTALLATION WITH TRA SNOW AND SUN'S ENGINEERING STANDARDS,
THIS SECTION WILL NOT BE WARRANTED BY TRA SNOW AND SUN.
March 21, 20243/32" = 1'-0"
CLAMP ON
SNOW FENCE
SNOW FENCE
DECK MOUNT
SNOW
BRACKET
EXPANSION
GAP
ICE FLAG
PLAN LEGEND PART / DESC QTY
SNOW RETENTION PART SCHEDULE
C22 CLAMP-ON
CLAMP-ON PIPE L=10' 176
CLAMP-ON CAPS/COLLARS 315
PART / DESC QTY
*RECOMMENDED PART SCHEDULE
*TRA RECOMMENDS THE USE OF ICE
FLAGS FOR ROOFS WITH A SLOPE
UNDER 2:12, A SEAM PROFILE OF 1" OR
GREATER, AND SNOW LOADS OF 30 PSF
OR LESS. RECOMMENDED TO BE
INSTALLED ON EAVE COURSES.
ICE FLAG (1 @ EACH SPACE)
ABBREVIATIONS
PD - PROJECT DETAIL
LD - LAYOUT DETAIL
SR1.0
2 3
PAR
T
I
A
L
L
Y
WA
R
R
A
N
T
E
D
CHK'D
40'-0"
FLAT
FLAT FLAT
:8 12 TYP U.N.O.
:412
:
4
12
:4 12
:4 12
:412
PD1
2'-31 4"
3'-7" TYP
4'-111 4"
3'-81 4"
TYP
3'-61 2" TYP
7'-1" TYP
2'-101 2"
TYP
2'-101 2"
TYP
2'-101 4"
4'-3"
3'-51 2"
TYP
4'-53 4"
8'-113 4"
3'-21 4"
TYP
3'-2"
4'-1"5'-1"6'-6"
5'-1"
TYP
4'-41 2"
8'-83 4"
3'-101 2"
TYP
3'-91 4"
TYP
03/28/2024
03/28/2024
Existing heat tape is only located in gutters
and downspouts and will be left undisturbed
during re-roof work.
NOTE: If existing heat tape is touched/moved,
REMP will be applied and a sub-electrical
permit will be required.