Loading...
HomeMy WebLinkAboutFile Documents.605 Cemetery Ln.0052-2024-BROF (6)SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same. 7/17/2024 7/17/2024 Snow stops required at all locations where roofs could shed snow onto walkways, stairs, alleys, decks, exits, utilities and meters, emergency escape and rescue opening window wells, or adjacent properties - Ordinance 1, 2023. HEAT TAPE MANDATORY CONTROL REQ’S. All heat tape systems shall meet the following per (Ordinance 1 Series 2023): -Automatic controls configured for system shut off when air temperature is above 40°F and comply with one of the following: -shut off in absence of moisture -shut off at night (daylight sensor or timer) SUB-ELECTRICAL PERMIT REQUIRED FOR HEAT TAPE A sub-electrical permit is required if a heat tape system is present, no matter the total wattage. A licensed electrician must apply for the permit. The sub-electrical permit must be applied for prior to the final roof inspection as both final inspections will occur simultaneously. MID-ROOF AND FINAL ROOF INSPECTIONS REQUIRED TO RECEIVE A LETTER OF COMPLETENESS Amenity Energy Use Approved (2021 CODE) RREMP CREMP PERMIT #:0052-2024-BROF DATE:_8/8/24__ HEAT TAPE TOTAL WATTAGE:__3000______ WATTS/FT:__________6___________________ TOTAL LINEAR FT:_____500________________ OFFSET: ___REMP PAYMENT____________ *Note: - The first 1000W are exempt from REMP. - All roof permits will require a sub-electrical permit applied for by a licensed electrician. - A sub-electrical permit must be applied for prior to the final roof inspection as both final inspections will occur simultaneously. Mid-Roof Inspection REQUIRED After your roof permit is issued, and you have started work, you must request a mid-roof inspection. Inspectors will verify your Class A assembly on site. You will request inspection directly on SalesForce. Final Roof Inspection REQUIRED Once roof work is complete, you must request a final roof inspection. Inspectors will inspect snow guards and heat tape (if applicable). NOTE: If there is heat tape present, a final roof inspection cannot be requested until the sub-electrical permit is applied for as both final inspections will occur simultaneously. NOTE: You many not substitute roofing components/products that stray from the approved and issued ESR/QAI report without Building department approval. Class A assemblies are tested and listed with the specific roof products called out in the associated documentation. Installers shall follow all manufacturer's installation instructions for Class A roof assembly. X 08/08/2024 linzhid ESR-1463 | Most Widely Accepted and Trusted Page 7 of 14 TABLE 1—PRODUCT NAMES (continued) CARLISLE PRODUCT NAME MULE-HIDE PRODUCT NAME VERSICO PRODUCT NAME WEATHERBOND PRODUCT NAME ROOFING PRODUCTS INTERNATIONAL PRODUCT NAME Cold Applied Adhesive Cold Applied Adhesive Cold Applied Adhesive Cold Applied Adhesive RPI Cold Applied Adhesive Flexible FAST Adhesive Helix® Max Low-Rise Adhesive Flexible DASH Adhesive Flexible DASH Adhesive FastBond Flex Adhesive OlyBond 500 Adhesive - OlyBond 500 Adhesive OlyBond 500 Adhesive OlyBond 500 Adhesive TABLE 2—FIRE CLASSIFICATION ASSEMBLIES—ADHERED ROOFING SYSTEMS2,5 SYSTEM NO. ROOF CLASS DECK MAX SLOPE BARRIER BOARD OR SLIP SHEET INSULATION1 MEMBRANE 1 A Noncombustible 1/4:12 — Any of the following insulations, 1-inch min. thickness: Carlisle “SecurShield Polyiso”, “InsulBase”, Hunter Panels “H-Shield” or “H- Shield-CG” Sure-Weld, Spectro-Weld 2 1/2:12 Sure-Seal FR, Sure-Tough, Sure-White, Sure-Seal FleeceBACK, Sure-Weld HS, Sure-Weld SAT-TPO, Sure-Weld FleeceBACK, Spectro-Weld FleeceBACK, Sure-White FleeceBACK 3 3/4:12 Sure-Flex PVC FleeceBACK, Sure-Flex KEE HP FleeceBACK, Sure-Flex PVC FRS FleeceBACK, Sure-Flex KEE HP FRS FleeceBACK 4 1½ :12 Sure-Flex PVC, Sure-Flex PVC FRS, Sure-Flex KEE HP 5 A Noncombustible 3/4:12 — 1/2-inch-thick fiberboard4, 1/2-inch-thick fiberboard4 or barrier board (see Section 3.6) over 5-inch max Insulfoam EPS3, 1/2-inch-thick fiberboard or barrier board (see Section 3.6) over System No. 1 insulations Sure-White FleeceBACK 6 1:12 Sure-Seal FR, Sure-Tough 7 11/2:12 Sure-White, Sure-Seal FleeceBACK, Sure-Weld, Spectro-Weld, Sure-Weld HS, Sure-Weld SAT-TPO, Sure-Weld FleeceBACK, Spectro-Weld FleeceBACK, Sure-Flex PVC, Sure-Flex PVC FRS, Sure-Flex KEE HP, Sure-Flex PVC FleeceBACK, Sure-Flex KEE HP FleeceBACK, Sure-Flex PVC FRS FleeceBACK, Sure-Flex KEE HP FRS FleeceBACK 8 A Noncombustible or Combustible - min. 15/32-inch- thick plywood or min. 7/16-inch- thick OSB. 3/4:12 1/4-inch thick “DensDeck Prime” or 1/4-inch thick “SECUROCK Gypsum Fiber Roof Board” — Sure-White FleeceBACK 9 11/2:12 Sure-White, Sure-Seal FleeceBACK 10 3:12 Sure-Tough, Sure-Weld, Spectro-Weld, Sure-Weld FleeceBACK, Spectro-Weld FleeceBACK 11 4:12 Sure-Weld HS, Sure-Weld SAT-TPO 12 Unlimited Sure-Seal FR, Sure-Flex PVC, Sure-Flex PVC FRS, Sure-Flex KEE HP 13 3:12 Sure-Flex PVC FleeceBACK, Sure-Flex KEE HP FleeceBACK, Sure-Flex PVC FRS FleeceBACK, Sure-Flex KEE HP FRS FleeceBack 0052-2024-BROF OREN NEDRA RES TRUST 605 CEMETERY LN 273512223001