HomeMy WebLinkAboutFile Documents.210 S West End St.0063-2024-BRES (9)SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen
Municipal Code. Pursuant to
Sec.26.104.050, any permit or approval
issued in error or otherwise not in
conformity with the requirements of this
Title, shall be void. Similarly, any permit
or approval issued in reliance upon or
as a result of, a materially false
statement or representation made in
the process of obtaining the permit or
development approval shall, likewise,
be void. Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
0063-2024-BRES
WEST END HOME LLC
210 S WEST END ST
273718206004
PROSSER PEIGHTAL ENGINEERS Ltd
STRUCTURAL CONSULTANTS
24011 Letter to provide Structural Design Services 2024-05-05
PO Box 410 • Basalt, Colorado • 81621 • 970.927.9510 • p2eng.office@gmail.com
www.p2eng.com
To: Aspen Building Department
c/o Compass Construction Management LLC
Scott DeWind
scott@compasscm.co
From: Adrienne Prosser, PE
Date: 5 May 2024
Re: Letter to provide Structural Design Services
Remodel
210 South West End Street
Aspen, Colorado
My office has been contacted by Compass Construction Management (Builder), to provide
professional engineering services for the above-referenced project. It is understood that this
remodel is intended as Interior Only with NO Structural Revisions. We will submit our standard
Letter of Agreement to provide the following services.
1. Observation of existing structure as required during demolition.
2. Design documents for any remodel structure work that may arise during the remodel
process as requested.
3. Observation during new structural construction with Field Reports as required.
I have reviewed information provided by Compass Construction Management, prepared by
Wayne Swadron Studios, dated 3.7.2024. These documents address the proposed changes to
the building. It is assumed that none of this work with have an impact on the existing structure.
Conceptually, this project involves:
1. Upgrade of unit finishes.
2. Re-layout of assumed non-load bearing partition walls.
Conclusion
Structural systems are assumed to not be impacted. However, this office will review any un-
anticipated structural systems affected by the remodel work and provide structural
recommendations as required.
Please contact my office with any questions.
MEMORANDUM
5 May '24
06/13/2024
FIRE
SPRINKLERS
REQUIRED
08/15/2024
linzhid