Loading...
HomeMy WebLinkAboutFile Documents.210 S West End St.0063-2024-BRES (9)SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same. 0063-2024-BRES WEST END HOME LLC 210 S WEST END ST 273718206004 PROSSER PEIGHTAL ENGINEERS Ltd STRUCTURAL CONSULTANTS 24011 Letter to provide Structural Design Services 2024-05-05 PO Box 410 • Basalt, Colorado • 81621 • 970.927.9510 • p2eng.office@gmail.com www.p2eng.com To: Aspen Building Department c/o Compass Construction Management LLC Scott DeWind scott@compasscm.co From: Adrienne Prosser, PE Date: 5 May 2024 Re: Letter to provide Structural Design Services Remodel 210 South West End Street Aspen, Colorado My office has been contacted by Compass Construction Management (Builder), to provide professional engineering services for the above-referenced project. It is understood that this remodel is intended as Interior Only with NO Structural Revisions. We will submit our standard Letter of Agreement to provide the following services. 1. Observation of existing structure as required during demolition. 2. Design documents for any remodel structure work that may arise during the remodel process as requested. 3. Observation during new structural construction with Field Reports as required. I have reviewed information provided by Compass Construction Management, prepared by Wayne Swadron Studios, dated 3.7.2024. These documents address the proposed changes to the building. It is assumed that none of this work with have an impact on the existing structure. Conceptually, this project involves: 1. Upgrade of unit finishes. 2. Re-layout of assumed non-load bearing partition walls. Conclusion Structural systems are assumed to not be impacted. However, this office will review any un- anticipated structural systems affected by the remodel work and provide structural recommendations as required. Please contact my office with any questions. MEMORANDUM 5 May '24 06/13/2024 FIRE SPRINKLERS REQUIRED 08/15/2024 linzhid