HomeMy WebLinkAboutFile Documents.688 Spruce St.0003-2022-BCHO (7)SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
SEE NOTES #1 PLANS
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen
Municipal Code. Pursuant to
Sec.26.104.050, any permit or approval
issued in error or otherwise not in
conformity with the requirements of this
Title, shall be void. Similarly, any permit
or approval issued in reliance upon or
as a result of, a materially false
statement or representation made in
the process of obtaining the permit or
development approval shall, likewise,
be void. Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
sophiev
07/18/2022ZONING
688 Spruce Change Order #2
T O KORU CONSTRUCTION, CITY OF ASPEN
F R O M CCY – MAURA TRUMBLE
D A T E 06.06.2022
J O B 688 SPRUCE ST
R E PERMIT CHANGE ORDER #02 (ASI-02)
ASI-02 (DELTA 2)– VARIOUS PROJECT REVISIONS: LANDSCAPE, ARCH, MEP, STRUCTURAL
This Change Order #02 is concerned with updates to the landscape design, minor architectural
specification and design changes throughout the project, structural updates and MEP updates capturing
owner changes.
REVISED DRAWINGS:
SHEET # DESCRIPTION OF CHANGE
LANDSCAPE DOCUMENTS
L0-00 • Assigned ASI 02 issue date
• Clarified Sheet Index to indicate where to find location of series drawings not included in
landscape sheet set. Series drawings indicated as Not Included at this Time will not be
provided as not necessary
• Indicated sheets included in ASI 02
• Indicated sheets included in ASI 01.
L0-03 • Site Material legend adjustment-added the gravel paving
• Planting material legend adjustment- hatch pattern and symbol adjustment
• Proposed trees total caliper inch adjustment per updated planting plan
L0-04 • Planting schedule adjustment-quantity and size adjustment
L3-01 • New Site features added:
• Bocce court, fire terrace, and retaining wall
• Wood deck extension and gravel pad
• Mulch path connection between new features
• Additional guest parking and retaining wall
• Dog run fence and gate
• Garden fence post size adjustment
L7-02 • Gravel paving detail added
L7-06 • Garden fence post size adjustment
L7-07 • Dog run fence and gate added
L7-08 • Fire Feature installation detail added
L7-09 • Wood deck height and length adjustment
L7-10 • Bocce court plan and section detail added
L8-01 • Site planting plan adjustment
• Screening trees added to north, west and south of the property
• Turf and native revegetation area adjustment to align with new site features
L10-01 • Hydrozone Plan adjustment
IR-1 • WELS calculation adjustment
IR-2 • Irrigation plan adjustment
ARCHITECTURAL DOCUMENTS
G-002 - Revised deck area total (remains below allowable, fully exempt)
G-006 - Revised deck area total (remains below allowable, fully exempt)
A-100 - Revised landscape background and notes to reference new landscape drawings
- Added gravel area for sculpture at end of deck
06/20/2022
- Revised snowmelt footprint to reflect current design, revised RREMP worksheet
included in submission.
- Added guest parking and retaining wall per new landscape design.
A-110 - Revised snowmelt footprint at terrace
- Added steel trellis for shade sail
- Added pizza oven at outdoor kitchen
- Extended deck slightly and added gravel pad for sculpture
A-111 - Revised snowmelt at autocourt and walkway
- Closet 110 divided into two small closets accessed from office and hallway.
- Separate trash area added at garage
- Door 108A revised to 5-panel slider
A-120 - Revised door swing on door 008B, door 007A changed to pocket door
- Removed small window in wine room
- Added steel trellis for shade sail
- Added pizza oven at outdoor kitchen
A-121 - Revised door swings on doors 015B and 015A, changed doors 013A and 018A to
pocket doors
A-122 - Added wall and door 101E to create enclosed trash area in garage
- Door 108A revised to 5 panel slider due to window manufacturer’s constraints
- Revised outdoor room floor finish to open joint stone paver system over sloped
waterproof membrane
A-123 - Revised terrace off Master Bedroom to open joint stone paver system over sloped
waterproof membrane
- Closet 110 divided into two small closets accessed from office and hallway.
- Revised Master Bath 114 to wood flooring
A-130 - Added steel trellis for shade sail, added electric patio heaters at trellis. Updated spec
included in submission
- Revised electric heater spec at outdoor room.
- Revised Master Bedroom and Dressing Room to GWB ceiling finish (previously wood)
- Added trash enclosure in garage
A-201 - Added steel trellis for shade sail
A-500 - Revised F2 to reflect change to stone pavers at slab-on-grade terrace locations
- Revised F4 to reflect change to open joint stone paver on pedestal system
- Added F2A to clarify required insulation at exterior terraces with snowmelt and stone
pavers
- Eliminated ceiling assembly C2 – no longer used
STRUCTURAL DOCUMENTS
S-120 - Updates to concrete for architectural updates
- Concrete pilaster and footing added to support structure above
S-121 - Plan annotations added for clarity
- Concrete wall increased to 14” thickness
S-122 - Screen wall added
- Fireplace added
- Joist penetrations
- Wind Girts added
- Garage slab slope adjustment
S-123 - Patio updated for guardrail
S-124 - Screen wall added
- Fireplace added
- Eave framing updated
- Diaphragm blocking added
- Flat roof steel sizes changed to accommodate decreased ceiling depth
S-125 - Framing added for clarity
- Eave framing updated
06/20/2022
S-300 - Screen wall details updated for clarity
S-400-408 - Details updated or added for clarity
S-500 - Schedules updated for changing framing conditions
S-502 - Hanger schedule updated for changing framing conditions
MECHANICAL DOCUMENTS
· Added HVAC zone for the spa vault
· Modified SA and RA ducting to the Living Room
· Modified SA ducting to the Kitchen
· Revised EA strategy for Bunk Bath
· Added hydronic manifold locations
· Added thermostats and ventilation controllers to respective spaces
· Revised snowmelt zones and areas
· Added a dedicated boiler for spa and snowmelt heating
· Re-routed boiler flue and combustion air ducting
· Revised Mechanical Room EA strategy
· Revised AHU-1 & AHU-2 selections and airflows
· Revised Master Bedroom GRD sizes and locations
· Revised equipment schedules
· Revised piping diagram to reflect separate boiler systems
· Updated control sequences
ELECTRICAL DOCUMENTS
· Revised equipment schedules and load calculations to match Mechanical changes
· Adjusted electrical equipment locations and sizes for updated backgrounds and electrical gear
submittals
· Tesla Powerwalls reoriented to allow for ventilation space between units
· Receptacle adjustments for background changes
· Added additional EV Charger and future EV charger provisions
· Added spa and spa vault equipment and details
· Added distribution panel DP-1 for additional breaker space
· PV design switched to microinverter design to meet space constraints
· Updated # of allowable Powerwalls to match busbar sizing
· Updated per code review notes
· Switch to aluminum conductors from copper conductors
06/20/2022
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S
All snowmelt systems shall meet the following:
- Any portions in the Right of Way must be on a separate zone. A ROW permit
and Permanent Encroachment License are required.
- R10 insulation shall be installed under the area to be snowmelted or R5 insulation
shall be installed under the slab edges. (Ordinance 11 Series 2011)
- Automatic controls installed for system shut off when pavement temperature is above
50°F and no precipitation is falling. (2015 IECC R403.9 and C403.2.4.5)
- Automatic or manual controls installed for system shut off when outdoor temperature
is above 40°F. (2015 IECC R403.9 and C403.2.3.5)
- Inspection by testing hydrostatically at 1.5 times max system design pressure, but not
less than 100psi, for 15 minutes. (2015 IMC 1208.1)
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: _________________
471
M 1.02
exempt
19.74kw PV
DAM
8/11/210119-2020-BRES
CEC 60 sq ft
DATE: PERMIT NUMBER : 0003-2022-BCHO
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
PROPERTY INFORMATION
ADDRESS : 688 SPRUCE ST UNIT:
OWNER : MNKN LLC
PERMIT CONTRACTOR: KORU LTD
DESCRIPTION OF WORK This Change Order #01 is concerned with the addition of the in-ground spa, exterior material changes in paving
and finish, and the addition of a dog wash area in the garage. This also includes a few minor interior changes,
including an adjustment to a lower level bathroom and closet layout, a window adjustment in the bunk room,
and a simplified drainage plan in the garage. No adjustments to floor area or total built area of project.
PROJECT VALUATION 100000.0 CODE EDITIONS 2015 IRC
USE OF BUILDING Single Family BUILDING TYPE (IRC) One family
CLASS OF WORK Residential CONSTRUCTION TYPE
SQ FT OF BUILDING WORK
AREA 557.0 OCCUPANCY GROUP (IBC) R-3
LOT SIZE (SQ FT) 6666.0 REQUIRED SPECIAL
INSPECTIONS Structural Steel Welding
SQ FT OF SOIL DISTURBANCE 0.0 ENERGY CODE COMPLIANCE RESCheck UA Alternative
BUILDING FOOTPRINT EXISTING SNOWMELT ENERGY
USE
HARDSCAPE AREA (%) 162.0 NEW SNOWMELT ENERGY USE
ZONE DISTRICT R -15A ADDITIONAL COMMENTS
0003-2022-BCHO
MNKN LLC
688 SPRUCE STREET
27370740009
1
07/25/2022
denism