Loading...
HomeMy WebLinkAboutFile Documents.1280 Red Butte Dr.0148-2023-BRES (13)SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same. luisp 12/07/2023ZONING LEVEL 4 ALTERATION REQUIREMENTS Your approved scope has triggered a Level 4 Alteration and the following are required: - Exposed wall cavities must be insulated to the cavity portion of IECC prescriptive alteration table R402.1. (IECC R503.1.3 item 2) - 2x6: R-20 - 2x4: R-13 - Blower door test required at final. If <5 ACH50 whole dwelling ventilation required (may be supply only, exhaust only including a controlled bath fan, or combo including but not limited to ERV or HRV) (IECC R503.1.1.5) - Sign up for energy reporting (BIQ benchmarking - IECC R503.1.6) Ordinance 1, 2023 Note the skylight materials, including the thickness of the interlayer. 2021 IBC 2405.2 requires a minimum 0.03" polyvinylbutryal interlayer, unless the skylight is 16sqft or less and is less than 12' above the interior floor, then it may have a 0.015" pvb interlayer. Provide a detail of the curb (minimum height 4" for slopes less than 3:12). Provide the U-factor of the skylight assembly- maximum: 0.44 for new construction 0.50 for existing construction if using the prescriptive path in 2021 IECC 402.1.3. To verify fenestration U-factors, the following is REQUIRED PRIOR TO GLAZING INSPECTION: Factory built windows: An NFRC label must be affixed to the window assembly and verified at field inspection. Site built windows: CPD numbers have been approved. Project specific NFRC labels must be affixed to the units or a project specific NFRC label certificate must be provided prior to field inspection. Site built windows: A certificate of authorization from an NFRC authorized inspection agency has been received and approved. Project specific NFRC labels must be affixed to the units or a project specific NFRC label certificate must be provided prior to field inspection. Site built windows: ASHRAE calculations were approved. To document the chain of custody, an affidavit or other evidence from the manufacturer confirming compliance with the calculations are required prior to field inspection. Site built windows: A simulation by an NFRC–accredited lab in accordance with NFRC-100 has been approved. Verification labels must be affixed to the window units by an accredited independent inspection agency or a certificate, affidavit or other evidence from the manufacturer confirming compliance with the NFRC-100 simulation or testing must be provided for approval prior to inspection. 100% of lamps in permanently installed light fixtures must be high efficacy - IECC R404.1 03/27/2024 linzhid 0148-2023-BRES 1280 RBD LLC 1280 RED BUTTE DR 273501316001 NOTE: a final air clearance asbestos abatement report prior to permit issuance