Loading...
HomeMy WebLinkAboutFile Documents.837 W Smuggler St.0240.2018 (36).ARBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 0240.2018.ARBK GSS SMUGGLER LLC 837 W SMUGGLER ST 273512428001 06/27/2019 ALL OUTDOOR LIGHTING MUST COMPLY WITH THE CITY OF ASPEN LIGHTING CODE SECTION 26.575.150 Code Editions Fire Sprinkler System Type Of Construction Fire Alarms Installed Required Special Inspections Energy Code Compliance Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________ Building Type/Occupancy Group COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DESCRIPTION FORM - IRC & IBC CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 BUILDING CODE INFORMATION 2015 IRC Existing?NFPA 13 NFPA 13 R High-Strength Bolting Epoxy Anchors Structual Steel Welding Permanent Micropiles Other _____________ Prescriptive Table UNIT DESCRIPTION AS PROPOSED # Stories Above Grade ______ # Stories Below Grade _______ Parking Spaces ______ Parking Spaces ______ Parking Spaces ______ # Bedrooms ______ # Full Baths ______ Deck Area ______ # 3/4 Baths ______ # 1/2 Baths ______ # Kitchens ______ # Wood Fireplaces ______ # Gas Appliances ______ # Gas Logs______ NFPA 13 D RESCheck UA Alternative Yes No One Family Two Family Townhouse Reviewed By: _____________________Date:__________ BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage) Basement ___________________________________________________________________________________ ___________________________________________________________________________________________ Main Level __________________________________________________________________________________ ____________________________________________________________________________________________ 2nd Floor ___________________________________________________________________________________ __________________________________________________________________________________________ 3rd Floor ___________________________________________________________________________________ ___________________________________________________________________________________________ Additional ___________________________________________________________________________________ ___________________________________________________________________________________________ Attached Garage Detached Garage Carport Is there an ADU? # Living Rooms_____ # Kitchens _____ # Full Baths _____ # 3/4 Baths _____ # 1/2 Baths _____ # Bedrooms _____ # Other Rooms (List)____________ ADU BUILDING DESCRIPTION Yes No PERMIT NUMBER: _______________________________ (As Adopted and Amended) Other (Please Explain) _________________ _________________ VA VB IV IIIA IIIB IIA IIB IA IB Sprayed Fire-Resistants COMCheck UA Alternative (Existing + New) A__B B (A <50) F__ H__ I __ E R__ S__ U M I R C I B C 2015 IBC (As Adopted and Amended) Yes No Required?Yes No Type January 2018 2015 IEBC (As Adopted and Amended) Other _____________ Gross Area of Building: __________ Gross Area of Unit: __________ Occupant Load: ___________ 0 0 0 4498 sf 2 1 2 2 0 4 5 10 1 0 2 0 392 GAME ROOM, STORAGE, MECH, BATH 3BRMS, 3 BATHS, LAUNDRY, ENTRY, CLOSETS, GARAGE, PORCH, TERRACE LIVING, DINING, KITCHEN, BEDROOM, BATH, 1/2 BATH, DECK 837 W Smuggler Lot 1 09/25/18 3/4 Bath 3 bedrooms, 2 full baths, 1 3/4 bath, Mud/Laundry room, 2 car garage Living room, dining room, kitchen, pantry, 1 bedroom, 1 3/4 bath, 1 1/2 bath Bonnie Muhigirwa 6/27/19 06/27/2019 bonniem COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone City Mailing Address E-mailAddress State ZIP OWNER ___________________________________ _____________________ ________________________Name Phone E-mail FOR PLAN REVIEW QUESTIONS ___________________________________ _____________________ ________________________Name Phone E-mail FOR INSPECTION QUESTIONS ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone City Mailing Address E-mailAddress State ZIP OWNER’S AUTHORIZED AGENT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone City Mailing Address E-mailAddress State ZIP APPLICATION BEST CONTACT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone City Mailing Address E-mailAddress State ZIP ARCHITECT OR DESIGNER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone City Mailing Address E-mailAddress State ZIP CIVIL ENGINEER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone City Mailing Address E-mailAddress State ZIP STRUCTUAL ENGINEER OF RECORD I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. ________________________________________________________ _____________________ContractorSignature Date INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so. ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone City Mailing Address E-mailAddress State ZIP GENERAL CONTRACTOR Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit. (CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file ADDRESS: ____________________________PERMIT NUMBER: _______________________________ August 2017 Martin Mata 970-274-6011 matadesign@mac.com Simon Bentley 970-309-9151 cdbsimon@comcast.net GSS Properties p.o.box 66 Carbondale CO 970-309-9151 970-309-9151 81623 cdbsimon@comcast.net Martin Mata 970-274-6011 970-274-6011 PO Box 189 Carbondale CO 81623 matadesign@mac.com Martin Mata @ Info Above GRW Architecture LLC 970-618-4346 970-618-4346 4264 Carnwath Rd Tallahassee FL 32303 grwarch@gmail.com High Country Engineering 970-945-8676 970-945-8676 1517 Blake Ave Glenwood Springs CO 81601 rneal@hceng.com Kaup Engineering, Inc 970-945-9613 970-945-9613 1129 Grand Avenue Glenwood Springs CO 81601 dale@kaupengineering.com Crawford Design Build 970-963-3833 970-309-9151 1101 Village Rd Unit LL2B Carbondale CO 81623 crawforddesignbuild@comcast.net or cdbsimon@comcast.net 837 W SMUGGLER 09/25/18 External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ SPECIAL INSPECTION REQUIRED: -Structural steel welding: Field & Shop -High strength bolting -Epoxy anchors -Intumescent paint -Spray applied fire resistive materials -Permanent micropiles Special inspection is required per 2015 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. REFERENCES FROM 2015 IRC CV/A = crawl space ventilation required, sec. R408.1 Access required, R408.4 EE = emergency escape required sec R310.1 EU = enclosed usable space under stairs shall be ½” Gyp, sec R302.7 G/D = garage/dwelling separation, sec R302.5 and R302.6 STC = Sound transmission class not less than 45 at dwelling separations, app K RV = roof and rafter ventilation required, R806.1 A = attic access 22” x 30”, 30” headroom above, R807.1 SA = smoke alarms installed to NFPA 72 requirements, sec R314 CO = carbon monoxide detector per City Ordinance 41 series 2008 SG = safety glazing required, sec R308.4 GR = guardrails, 36” min ht, 4” max opening; req at 30” drop any point w/in 36” horizontally, sec R312 WFP = window fall protection- operable window <24” AFF & >72” above grade: use opening control device listed to ASTM F2090, sec R312.2 HR = handrails 34”-38” ht, sec R311.7.8 SI = stairway illumination, sec R303.7 PD = protect against decay, sec R317 REFERENCES FROM 2015 IMC V = bathroom and balanced whole house mechanical ventilation req. Ordinance 40, 2016 DE = clothes dryer exhaust, sec 504. Makeup air req’d if over 200 CFM AS = access and service space for maintenance req’d, sec 306 MA = make up air required if hood exhausts greater than 400 CFM, sec 505.2 ET = exhausts terminate 3’ from prop line and openings, 10’ from intakes, 501.3.1 IT= intake openings 10’ from lot line & contaminant sources (vents, streets), 401.4 D = fasten and seal all ductwork per 603.9 REFERENCES FROM 2015 IFGC DV = direct vent req’d, sec 303.3 CA = combustion air not taken from bedrooms, bathrooms or storage sec 303.3 OD = outdoor appliances must be listed for outdoor use, sec 303.6 REFERENCES FROM 2015 IECC F = new or replacement glazing shall not exceed 0.28 U-Value, NFRC label required, Ordinance 40, 2016 L = 75% of lamps in permanently installed lights must be high efficacy, sec R404.1 SE = Continuous air barrier required; all exterior joints, cracks, and holes to be caulked, gasketed, sealed, table R402.4.1.1 REFERENCES FROM 2014 NEC EP = electric panel 'happy space' 30"x36"x78", not in storage, sec 110.26 X 0240.2018.ARBK 6/27/19 0 sf 0 sf 0 sf Bonnie Muhigirwa COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ Commerical Multi-Family Single Family Use of Building Class of Work New Addition Alteration Repair ________ Yes No Will there be any roof/wall penetrations? NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. __________________ _________________ __________________ ____________________ ________________ _________________ __________ ______________ PROJECTVALUATION SQ FT OF WORK AREA UNIT SQ FT DISTURBEDEXTERIOR AREA SQ FT OF ROOMS WITH UTILITY WORK LOT SIZE(SQ FT) PROJECT DETAILS Mixed-Use IFFR Tenant Finish Demolition Change Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL FOR CITY USE ONLY Plan Check Permit Fee Parks Impact Engineering Zoning (50%)School Ded. Zoning (50%)CMP (50%)TDM Impact Energy Code REMP Ped. Amenity CMP (50%)Plan Check (Hourly)Housing Cash in Lieu Parks Review Zoning (Hourly)Stormwater Utility Review Engineering (Hourly)City Use Tax GIS County Use Tax SUBMITTAL FEES ISSUANCE FEES _________Lot Area _________Deed Restricted _________Census Code _________# of Dwellings _________Plans Location APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub ____Lavatory (Wash Basin) ____Shower ____Kitchen Sink (+Disposal) ____Dishwasher ____Laundry Bar, Utility Sink ____Clothes Washer ____Floor Sink ____Floor Drain ____Water Heater (Pan Req) ____# Gas Outlets ____Water Treatment ____Other_________ Fixture Counts ____Forced Air/Gravity Systems ____Wall, Suspended, or Unit Heaters ____Gas Log ____Gas Appliancew ____Appliance Vents ____Heat, Refrig, Cooling, or Absorption Unit ____Boilers (includes vent) ____Air Handling Unit ____Cooling Systems ____Ventilation Fans ____Range Hood ____# of Gas System Outlets ____Snowmelt System Sq Ft_________ Equipment Checklist PC Zoning HPC Building Fire Engineering CMP Water Stormwater Sanitation Env. Health Parks Landscape Efficiency Approved To Issue Issuance Date ApprovedReviewingDepartment Re- viewer Sign- Off NEW SQ FT Project Valuation: Cost of project as defined in Valuation Affadavit. Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration. Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit. Lot Size: Total surveyed square footage of property. Disturbed Exterior Area: Square footage of lot affected by permit application. New Sq Ft: Total added square footage for additions to net livable or net leasble space. Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work. DO YOU LIKE DOGS? December 2017 DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________ __________________________________________________________________________________ __________________________________________________________________________________ ZONE DISTRICT NeedsReview DE F I N I T I O N S 0240.2018.ARBK 837 W Smuggler 273512428001 1 Ranger Station Subdivision GSS Properties LLC c/o Martin Mata Below Martin Mata 970-274-6011 matadesign@mac.com New single family home 2,137,500 6 6,623 s.f. NA 6,623 s.f. 6,623 s.f. 4498 s.f. 600 17 3 1 1 1 R6 SV 09/25 25,081.87 X 38,587.50 17053.87 X JRB 6/28/19 13,736.43 7,036.94 30972.63 X BM 6/27/19 7,036.94 3,543.31 1908.78 X BM 6/27/19 X jd 6/4/19 5,788.12 X AR 6/25/19 X sw 7/8/19 3,543.31 280699.99 X AR 3/11/19 198.69 X PM 11/6/18 600.00 21,393.75 X Dr 6/18/19 500.00 5,343.75 RMX 2 1 1 1 09/25/18 6/14/19 DAM 7/11/19 SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 SPECIAL INSPECTION AND TESTING AGREEMENT To permit applicants of project requiring special inspection and\or testing per Section 1704 of the International Building Code (IBC). Project Address: __________________________________ Permit Number:______________________ BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures. APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved identification, as stipulated by the building official, when performing the function of special inspector. Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704. The following conditions are also applicable: A. Duties and Responsibilities of the Special Inspector 1. Signify presence at job site. Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. If required by the building official, they shall sign in on the appropriate form posted with the building permit. 2. Observe assigned work. The special inspector shall observe assigned work for conformance with the building department approved (stamped) design drawings, specifications, and applicable workmanship provisions of the International Building Code. Architect\engineer-reviewed shop drawings may be used only as an aid to inspection. For continuous special-inspection, the special inspector shall be on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record. 3. Report nonconforming items. The special inspector shall bring nonconforming items to the immediate attention of the contractor and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the work, the special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice. 4. Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated. [IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include: a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items, c. Report on how nonconforming items were resolved or unresolved as applicable, d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items. 1 837 W SMUGGLER 06/25/2019 5. Provide Final Inspection Report. The special inspector shall submit a written final report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection. B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the owner is responsible for employing special-inspection services. The special inspector\agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In case of an owner\contractor, the special inspector\agency shall be employed as specified by the building official. C. Engineer or Architect of Record Responsibilities 1. Prepare special inspection program. The engineer or architect of record shall list the items for which special inspection is required; and shall indicate any items for which the IBC or the building official approves periodic inspection and the frequency of such inspections. 2. Respond to field discrepancies. The engineer or architect of record shall respond to uncorrected field discrepancies in design, material, or workmanship observed by the special inspector. 3. Review shop drawings and submit design changes. The engineer or architect of record shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information, shall submit to the building official and to the special-inspection agency written documentation of any verbally authorized deviations from the approved construction documents, and shall submit revised documents for building official approval as required. D. Contractor Responsibilities 1. Notify the special inspector. The contractor is responsible for notifying the special inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans. Adequate notice shall be provided so the special inspector has time to become familiar with the project. 2. Provide access to approved plans. The contractor is responsible for providing the special inspector access to approved plans. 3. Retain special inspection records. Upon request, the contractor is also responsible for retaining, at the job site, all special inspection records completed by the special inspector. E. Inspection of Fabricators 1. Fabrication of structural assemblies and members. Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated items. 2. Fabrication and implementation procedures. The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator’s ability to conform to approved construction documents and reference standards. The special inspector shall review the procedures for completeness and adequacy relative to code requirements for fabricator’s scope of work. F. Approved Fabricator Responsibilities 1. Fabrication exempt inspections. Special inspections are not required where work is done on the premise of a fabricator registered and approved to perform such work without special inspection. 2 06/25/2019 06/25/2019 06/25/2019 06/25/2019 0240.2018.ARBK 05/28/2019 05/28/2019 05/28/2019 05/28/2019 05/28/201905/28/2019 06/27/2019 bonniem