Loading...
HomeMy WebLinkAboutMaster Permit.1050 Waters Ave.0112-2022-BRES 3/3/25,3:24 PM 0112-2022-BRES-Salesforce-Enterprise Edition • Close Window salesforce • Print This Page • Expand All I Collapse All 0112-2022-BRES Address 1050 WATERS AVE 13 Record Type Building Number 0112-2022-BRES Owner Fernando Cruz Original Number 22-2467 Status Closed-Final Type Building Reason for Cancel or Compl. Review Fail Applicant DEAN DOMBROWSKI Aspen Internal? No Account DOUBLE D PROPERTY MANAGEMENT INC Required Bond Amount Project Total Available Bond Amount Land Use Planning Application LPA-20-101 Bluebeam Project Id 954-731-429 Permit Contractor DOUBLE D PROPERTY MANAGEMENT INC HPC-ZON-EH-UTIL Review Valid Business License on HPC-ZON-EH-UTIL Review-2 Account Imported Eng Review Required Submissions Parks-Prkng-San Review Documents Resubmitted Conditional Inspections Conditional Final Insp Action Items Hold All Reviews Create Fees ,,/ Hold Reason Create Fees 2 ,/ Utility Review Type None Price Book 2022 Conditional Flat Fee Formula Applicant is a Nonprofit? No Conditional Tiered Fee Formula MIR, Eligible for Small Lodge No Program? Conditional Tiered SqFt Fee Discount All Fees(%) Formula Fee Discount Reason CO/LOC? LOC CO Status if Applicable Issued Queue Score Project Designation Red Tag Clearance Milestone Current Days in 13 Applicant Hand Queue Designation Red Tag Clearance Milestone Current Days in City Hands Queue Score 0 Milestone-Total Days in 10 Applicant Hand Last Date Received from Milestone-Total Days in City 98 Applicant Hands Dates New Application Date 7/29/2022 TCO Issuance Date Application Complete Date 9/30/2022 Close/CO Issuance Date 11/25/2024 Application Accepted Date 9/30/2022 Expiration Date 4/13/2025 Issue Date 7/13/2023 Override Expiration Date Days to Issue 286 Last Activity Date 10/15/2024 Basic Information Description The existing pergola,side walls,deck bench&step needs Census Code 434 R-Remodel only(no new Sq Ft) to be code compliant. The step needs to be removed,the pergola above the deck needs to be removed,the side walls need to be reduced in size&the bench needs to be code compliant. I will provide pictures Use of Building Multi-Family Interior Remodel Only Use Class Residential Class of Work Alteration https://cityofaspen.my.salesforce.com/a038X000028hDQAQA2/p 1/11 3/3/25,3:24 PM 0112-2022-BRES-Salesforce-Enterprise Edition Permit Comments Zoning:Survey of deck will be required at final inspection. Job Location Address 1050 WATERS AVE 13,ASPEN:273718240015 Lot Site Address Display on Map Legal Description Subdivision:ASPEN TOWNHOUSES BY THE RIVER Unit: 13 Historic Property? No Eden Address Historic District? No HPC-Planning-Zoning Details Zone District R/MF HOA/Covenant HOA/Covenant Approval Acquired Is There an ADU? No HPC Certificate of No Appropriateness? ADU Sq Ft Work Involves a Land Use Yes Approval? Deed Restricted? No Located in a PD? No #of Dwellings 1 Adds/Changes Floor Area? No Category of Zoning Fee Residential Occupancy or Use Change? No Zoning Work Level Minor Zoning Fee Work Affects Exterior of Yes Building? Building Project Details Valuation $2,500.00 Lot Size Sq.Ft. 18,000 Reason for Valuation Change Soil Disturbance Sq Ft 0 Unit Sq.Ft. 0 Affected Area Sq Ft 0 Building Footprint Sq Ft 0 Existing Hardscape Footprint Sq 0 Ft Sq Ft of Building Work Area 160 Existing Hardscape%of Lot 0% Building Fire Area Sq Ft Con Mit Sq Ft Total 160 Utility Review Sq.Ft. 0 Utility Review Sq Ft Total 0 %of Interior being Altered 0% New Sq.Ft. 0 Scope of Work Details Work Changes Building No Work Affects Tree/Drip Line? No Footprint? Work Changes No Located Within City Mall No Fenestration/Thrml Envelop? Boundaries? Requires Asbestos Test? No Adjacent to City Open Space? No Photovoltaic Installation No Impacts City Trails/Parks? No Work Adds/Removes/Changes No Work Subject to Water Efficient No Plumbing Fixt? L.O.? Restaurant/Food Service No Involves Impact on Sewer? No Involved? Change of Restaurant No Prevents Access to Sewer Main? No Ownership? Affects Parking/Alleys/Loading? No Sewer Easements Affected? No Utility Water Details Already on City Water? Class of Service Customer Utility Account Number Water Service Area Water Service Agreement Is There Well or Wells on the Required? Property? Common Building Name Abandon Existing Well Abandon Existing Tap Acre-feet of Water Currently by Well Date of Existing Tap Acre-feet of Water Rights to be Conveyed Existing Tap Modifications? Existing ECU Count New Tap? If Residential App,Estimated New ECUs Date of New Tap Final ECU Count Does Project Involve Outdoor Number of Meters Proposed Irrigation? Irrigated Area Sq Ft Size of Existing Domestic Water Line Identify ALL Sources of Water Size of Proposed Domestic Water Line https://cityofaspen.my.salesforce.com/a038X000028hDQAQA2/p 2/11 3/3/25,3:24 PM 0112-2022-BRES-Salesforce-Enterprise Edition Is There a Pool,Spa or Water Size of Existing Fire Feature? Suppression Line Summary of Prior Water Fees Size of Proposed Fire Paid Suppression Line Building Description Code Editions 2015 IBC Required Special Inspections Other Code Editions Energy Code Compliance Building Type(IRC) Total Snowmelt Sq Ft Construction Type VA Total Spa Sq Ft Occupancy Load Total Pool Sq Ft Occupancy Group R-2 Amount of Onsite Renewable Generation? Fire Sprinkler Existing? CO Description Remove stairs constructed without permit and return deck and guard to original condition Fire Sprinkler Required? Basement Fire Sprinkler Type 1st Floor Fire Alarms Installed? 2nd Floor #Wood Fireplaces 3rd Floor #Gas Log Fireplaces Additional #Gas Appliances Open Text Field For Comments Financials Total Fees $1,383.75 Total Payments $692.50 Fees Due at Current Status $659.75 Total Balance $691.25 System Information Number 0112-2022-BRES Community Visibility j Created By DEAN DOMBROWSKI,7/29/2022 9:32 AM Contact IDs 0036A00000iOponQAC,0036A00000iOponQAC Bluebeam Project Id 954-731-429 IsTestData? BB Project Name 1050 WATERS AVE 13-0112-2022-BRES Last Modified By Fernando Cruz,3/3/2025 3:15 PM VIP Form Tool VIP 7/29/2022 VIP [{"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvPUAS"}, Submitted 9:56 AM Template {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvNUAs"}, Status {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000iWidUAE"}, {"parentCategoryld":null,"isSubm it":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvVUAS"}, {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvKUAS"}, {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvXUAS"}, {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvaUAC"}, {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvZUAS"}, {"parentCategoryld":null,"isSubmit":true,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000Ux1 dUAC"}] VIP VIP Permit Application Foreign Form Language Template Action Items View/Print Permit Link Attachment View GIS Map View Milestone Gantt Chart Activity History Email:Letter of Completion:Permit 0112-2022-BRES at 1050 WATERS AVE 13,ASPEN:273718240015 Type Billable Assigned To Martyna Wojtkowska Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 11/25/2024 Days in Applicant's Hands Comments To:dean@doubledpropertymgmt.com CC: BCC: Attachment:1050 WATERS AVE 13-0112-2022-BRES_LOC_Final.pdf Subject:Letter of Completion:Permit 0112-2022-BRES at 1050 WATERS AVE 13,ASPEN:273718240015 Body: Hello DEAN DOMBROWSKI, Please find attached your issued letter of completion for the completed project at 1050 WATERS AVE 13,ASPEN:273718240015. https://cityofaspen.my.salesforce.com/a038X000028hDQAQA2/p 3/11 3/3/25,3:24 PM 0112-2022-BRES-Salesforce-Enterprise Edition If you have any questions about use tax or how to fill out the forms,please contact Bebo Salib at bebo.salib@aspen.gov or 970.920.5043. For questions about this permit,you can reply to this email. Email:Building Permit 0112-2022-BRES-1050 WATERS AVE 13,ASPEN:273718240015-Issued Type Billable Assigned To Martyna Wojtkowska Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 7/13/2023 Days in Applicants Hands To:dean@doubledpropertymgmt.com CC: BCC: Attachment:Building_-_Permit_Issuance_20230713.pdf Subject:Building Permit 0112-2022-BRES-1050 WATERS AVE 13,ASPEN:273718240015-Issued Body: DEAN DOMBROWSKI, Please find attached your issued building permit for 0112-2022-BRES for 1050 WATERS AVE 13,ASPEN:273718240015 and City Use Tax exemption letter,if applicable. Below is a link to your plans.Please print these 24x36 in color and keep them on site at all times.As a reminder,links will expire in 30 days so please download the plans as soon as you get this email. https://cityofas pens harepoi nt.com/:f:/s/COA-Iss uedBui Id i ng PlansPu bl icRecords/Ehn R-OmS LIJAv2J-CS_I m4kBZ3hfPz6cYm E0JkeO7 Wmbcg?e=0x26SB Comments All inspections are scheduled through the Salesforce applicant portal. BUILDING INSPECTIONS REQUESTED BY 7:30 PM WILL BE SCHEDULED FOR THE NEXT BUSINESS DAY.REQUESTS AFTER 7:30 PM WILL BE SCHEDULED FOR THE FOLLOWING BUSINESS DAY.ALLOW THE ENTIRE DAY FOR THE INSPECTION. PLEASE NOTE THAT ALL REFERRAL AGENCIES MUST APPROVE THEIR FINAL INSPECTIONS PRIOR TO THE FINAL BUILDING INSPECTION. WHAT INSPECTIONS DO I NEED?Please visit here:https://www.aspen.gov/DocumentCenter/View/7847/-What-Inspections-are-Needed-for-my-Permit? bidld= HOW TO SCHEDULE AN INSPECTION ONLINE?Please visit here:https://www.aspen.gov/DocumentCenter/View/6436/How-to-request-an-inspection? bidld= For questions on inspections please email buildinginspectors@aspen.gov If you are experiencing system issues,please contact sfsupport@cityofaspen.com or call 970-920-5065. Email:Permit Fees Due:0112-2022-BRES at 1050 WATERS AVE 13,ASPEN:273718240015 Type Billable Assigned To Martyna Wojtkowska Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 3/14/2023 Days in Applicants Hands Comments To:dean@doubledpropertymgmt.com CC: BCC: Attachment:--none-- Subject:Permit Fees Due:0112-2022-BRES at 1050 WATERS AVE 13,ASPEN:273718240015 Body: If you have not already paid the fees due on your permit 0112-2022-BRES,at 1050 WATERS AVE 13,ASPEN:273718240015,please log into the Aspen Permitting Portal to pay them.If you pay online,be aware that credit card or e-check transaction fees will apply. If you would like to pay by check,you can mail payments to the following locations: •Building and related permits:Community Development,427 Rio Grande •Parking Reservation permits:Parking Department,427 Rio Grande •Pitkin County Water Permit:Utility Billing.,427 Rio Grande •ROW and encroachments:427 Rio Grande •Tree permits:Parks Dept.,585 Cemetery Lane Aspen •Utility Connection Permits:Utility Billing.,130 S Galena,1st Floor •Electric Community Investment Fee:Utility Billing.,130 S Galena,1st Floor Current Amount Due:$659.75 Instructions to see detail of fees due: -Log in to the Portal here:https://cityofaspen.force.com/applicantportal and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible,click the"View All"link -To filter fees,click on the black funnel icon at the top right.(Example:to only see the fees due at permit submission,select"Complete Pending Submittal Fees"under Permit Fees Due At section and then click Apply button.) Instructions to pay fees are found here:https://www.cityofaspen.com/DocumentCenter/View/5008/Paying-for-an-Application-?bidld= https://cityofaspen.my.salesforce.com/a038X000028hDQAQA2/p 4/11 3/3/25,3:24 PM 0112-2022-BRES-Salesforce-Enterprise Edition Thank you! City of Aspen Email:Engineering Comments-0112-2022-BRES-1050 WATERS AVE 13 Type Billable Assigned To Kyla Smits Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 1/17/2023 Days in Applicants Hands To:dean@doubledpropertymgmt.com CC:kyla.smits@aspen.gov BCC: Attachment:Engineering-1-1050 Waters Ave-0112-2022-BRES.pdf Subject:Engineering Comments-0112-2022-BRES-1050 WATERS AVE 13 Body: Hello DEAN DOMBROWSKI, I've reviewed your permit application;please see the attached comment list.Please contact me directly if you have any questions on the comments. You may resubmit your responses online when you have received comments or approval from all applicable review agencies.Please be sure to reach out to your permit coordinator to ensure you've received all applicable comments prior to uploading responses.Once you have uploaded your comments online,please email your permit coordinator directly to notify them as they will not receive an automated email from our system. Address:1050 WATERS AVE 13 Permit Number:0112-2022-BRES Comments Permit Coordinator:Sydney Fallon These design documents have been reviewed for conformance to the Engineering Design Standards and URMP as adopted and amended by the City of Aspen.State and Federal regulations are administered where applicable.You can find a copy of all adopted codes,ordinances,and policies on our website. The attached corrections are required to be addressed.Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list.Indicate which detail or specification page shows the required information. Responses such as"will comply with code"are not adequate.Revised drawings must clearly show code compliance. Engineering Review is only one part of the often complex process by which projects are reviewed for approval.These parts are interrelated and are sometimes conflicting.It is ultimately the applicant's responsibility to coordinate these requirements. Kyla Crocker(she/her/hers) Project Manager I Engineering (C):970.274.7244 www.aspen.gov Email:Permit Fees Due:22-2467 at 1050 WATERS AVE 13,ASPEN:273718240015 Type Billable Assigned To Sydney Fallon Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 9/29/2022 Days in Applicants Hands Comments To:dean@doubledpropertymgmt.com CC: BCC: Attachment:--none-- Subject:Permit Fees Due:22-2467 at 1050 WATERS AVE 13,ASPEN:273718240015 Body: If you have not already paid the fees due on your permit 22-2467,at 1050 WATERS AVE 13,ASPEN:273718240015,please log into the Aspen Permitting Portal to pay them.If you pay online,be aware that credit card or e-check transaction fees will apply. If you would like to pay by check,you can mail payments to the following locations: •Building and related permits:Community Development,427 Rio Grande •Parking Reservation permits:Parking Department,427 Rio Grande •Pitkin County Water Permit:Utility Billing.,427 Rio Grande •ROW and encroachments:427 Rio Grande •Tree permits:Parks Dept.,585 Cemetery Lane Aspen •Utility Connection Permits:Utility Billing.,130 S Galena,1st Floor •Electric Community Investment Fee:Utility Billing.,130 S Galena,1st Floor Current Amount Due:$32.75 Instructions to see detail of fees due: -Log in to the Portal here:https://cityofaspen.force.com/applicantportal and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible,click the"View All"link -To filter fees,click on the black funnel icon at the top right.(Example:to only see the fees due at permit submission,select"Complete Pending Submittal Fees"under Permit Fees Due At section and then click Apply button.) Instructions to pay fees are found here:https://www.cityofaspen.com/DocumentCenter/View/5008/Paying-for-an-Application-?bidld= https://cityofaspen.my.salesforce.com/a038X000028hDQAQA2/p 5/11 3/3/25,3:24 PM 0112-2022-BRES-Salesforce-Enterprise Edition Thank you! City of Aspen Email:City of Aspen-Application Status:Completeness Review Failed Type Billable Assigned To Sydney Fallon Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 8/12/2022 Days in Applicant's Hands To:dean@doubledpropertymgmt.com CC: BCC: Attachment:--none-- Subject:City of Aspen-Application Status:Completeness Review Failed Body: Dear DEAN DOMBROWSKI, Your Permit Application#22-2467 for 1050 WATERS AVE 13,ASPEN:273718240015 is in the"Completeness Review Failed"Status because of the Comments following: -PERMIT APPLICATION PACKET -SQUARE FOOTAGE OF WORK AREA? -DRAWINGS OF EXISTING WORK SITE AND PROPOSED PLANS Please contact Sydney Fallon with any questions at sydney.fallon@services.cityofaspen.com. Thank you, City of Aspen Email:Your Building Permit Application Has Been Received...Here's What to Expect Type Billable Assigned To Sydney Fallon Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 8/3/2022 Days in Applicant's Hands Comments To:dean@doubledpropertymgmt.com CC: BCC: Attachment:--none-- Subject:Your Building Permit Application Has Been Received...Here's What to Expect Body: Dear DEAN DOMBROWSKI: I have received your permit application.I will be your Permit Coordinator.The City of Aspen permit process works as follows: Completeness Review:I will be reviewing your permit application for completeness in the next 7-10 business days.I will follow up with you directly if I need any additional information. Submittal Fees:Once your permit is deemed complete,I will provide you with a list of all permit submittal fees that are due.Your permit will not be placed into our review queue until payment of all submittal fees is received. Permit Review:Your permit will be placed in our review queue on the date that the submittal fee payment is received.Each review agency triggered for the review will either approve the permit or issue comments that you are required to address prior to their approval.You can see the status of all reviews by going into your permit on the Salesforce portal,clicking on the`Related'tab,and scrolling down to`Reviews.' Comment Response:Once you have addressed all agency comments,both in writing and on your plans,you will resubmit all documents via the portal. Just go into your permit,scroll down to the bottom of the page,and use the`Add more'button.You must notify me when you have uploaded your files for me to know that you have resubmitted.You can use the portal's Chatter feature(see instructions below). Issuance:Once all agencies have approved your permit,you will be notified that it is time to pay your permit issuance fees.Once you do so,your approved plans and permit documents will be sent to you electronically. Additional Important Information: https://cityofaspen.my.salesforce.com/a038X000028hDQAQA2/p 6/11 3/3/25,3:24 PM 0112-2022-BRES-Salesforce-Enterprise Edition Only after I perform a completeness review and submittal fees are paid will your permit be accepted into our system as a formal submission.At that time,it will be put into the permit work queue. I may need to meet with you—either in person,over the phone,or via a virtual meeting—before I can finish my completeness review to ensure that I have a full understanding of your project's scope. If you need to contact me about your permit,I encourage you to use the Chatter feature on your permit on the applicant portal.When you use Chatter,I get an email,but it also gets attached to the permit record in the back office.So,anyone looking at the permit can see the conversations.This will be very helpful if someone else needs to get involved with your permit. To use Chatter: Open your permit on the portal. In the`Share an update...'box,type'@,'then start typing my name.My name will appear.Just click on it then add your message. Contacts DEAN DOMBROWSKI Account DOUBLE D PROPERTY MANAGEMENT INC Type Applicant Active Contractor License Count 1.00 Number 0049407 DEAN DOMBROWSKI Account DOUBLE D PROPERTY MANAGEMENT INC Type Contractor Active Contractor License Count 1.00 Number 0049408 Fees 0076005 Type Building Permit Fees Total $25.00 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0076006 Type Use Tax Deposit-Pitkin County Total $1.25 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0076007 Type Zoning Review Fee Total $16.50 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Complete Pending Submittal Fees Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0076008 Type Zoning Review Fee Total $633.50 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart V. Paid in Full .7 Fee Paid Date/Time https://cityofaspen.my.salesforce.com/a038X000028hDQAQA2/p 7/11 3/3/25,3:24 PM 0112-2022-BRES-Salesforce-Enterprise Edition 0076009 Type Building Plan Check Fee Total $16.25 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Complete Pending Submittal Fees Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0086055 Type Zoning Hourly Fee Total $650.00 Waived/Refunded Amt Discount$ Outstanding $650.00 Fee Due At Ready for Closure;Issued Show in Cart Paid in Full Fee Paid Date/Time 0087214 Type Red Tag Fee Total $41.25 Waived/Refunded Amt Discount$ Outstanding $41.25 Fee Due At Ready for Closure;Issued Show in Cart Paid in Full Fee Paid Date/Time Files 1050 WATERS AVE 13-0112-2022-BRES_LOC_Final Revegation Plan Last Modified 11/25/2024 11:25 AM Last Modified 9/21/2023 5:12 PM Created By Martyna Wojtkowska Created By DEAN DOMBROWSKI Building_-_Perm it_Issua n ce_20230713.pdf Bu i l d i n g_Cover_Sheet_20230214.pdf Last Modified 7/13/2023 1:15 PM Last Modified 2/13/2023 8:45 PM Created By Martyna Wojtkowska Created By Justin Hahn Engineering-1-1050 Waters Ave-0112-2022-BRES Permit Application 2022-07-29 15:56:10.pdf Last Modified 1/17/2023 2:28 PM Last Modified 7/29/2022 9:56 AM Created By Kyla Smits Created By DEAN DOMBROWSKI Inspections INS-0003538-23 Status Closed-Not Needed Type Fire Subtype Requested Date 8/16/2023 12:28 PM Scheduled Start Date Completed Date 8/17/2023 Owner Last Name Legersky Permit Inspection Round Final Inspection Closed TRUE INS-0003539-23 Status Accepted as Noted Type Building&Referral Inspection Status Subtype Requested Date 8/15/2023 9:30 AM Scheduled Start Date 8/15/2023 Completed Date 8/16/2023 Owner Last Name Feder Permit Inspection Round Final Inspection Closed TRUE INS-0003540-23 Status Partial/Non-Complete Type Zoning Subtype Requested Date 8/16/2023 12:29 PM Scheduled Start Date https://cityofaspen.my.salesforce.com/a038X000028hDQAQA2/p 8/11 3/3/25,3:24 PM 0112-2022-BRES-Salesforce-Enterprise Edition Completed Date 8/24/2023 Owner Last Name Varga Permit Inspection Round Final Inspection Closed TRUE INS-0004266-23 Status Accepted as Noted Type Engineering Dev Subtype Requested Date Scheduled Start Date Completed Date 10/15/2024 Owner Last Name Hahn Permit Inspection Round Closed TRUE INS-0004267-23 Status Pass/Accepted Type Parks Subtype Requested Date 10/15/2024 12:00 PM Scheduled Start Date Completed Date 10/15/2024 Owner Last Name Pewitt Permit Inspection Round Closed TRUE INS-0004268-23 Status Accepted as Noted Type Zoning Subtype Requested Date Scheduled Start Date Completed Date 10/15/2024 Owner Last Name Hahn Permit Inspection Round Re-Inspection Closed TRUE INS-0005398-24 Status Accepted as Noted Type Building Subtype Final Building Requested Date Scheduled Start Date Completed Date 10/15/2024 Owner Last Name Hahn Permit Inspection Round Final Inspection Closed TRUE Milestones Review Round 1-0112-2022-BRES Status Not Approved Due Date Created Date 9/30/2022 Review Round 2.0-0112-2022-BRES Status Approved Due Date Created Date 2/14/2023 Notes&Attachments 1050 WATERS AVE 13-0112-2022-BRES_LOC_Final Revegation Plan Type File Type File Last Modified Martyna Wojtkowska Last Modified DEAN DOMBROWSKI Description Description Download Download Building_=Permit_Issuance_20230713.pdf Building_Cover_Sheet_20230214.pdf Type File Type File Last Modified Martyna Wojtkowska Last Modified Justin Hahn Description Description Download Download Engineering-1-1050 Waters Ave-0112-2022-BRES Permit Application 2022-07-29 15:56:10.pdf Type File Type File Last Modified Kyla Smits Last Modified DEAN DOMBROWSKI https://cityofaspen.my.salesforce.com/a038X000028hDQAQA2/p 9/11 3/3/25,3:24 PM 0112-2022-BRES-Salesforce-Enterprise Edition Description Description Download Download Signature-Sign Below-0056A000002MJdEQAW-7/29/2022 9:55 AM.png Type Attachment Last Modified DEAN DOMBROWSKI Description View file Payments PY-017652 Related To 0112-2022-BRES Amount $659.75 Created Date 7/12/2023 Payment Source R-0016477 Receipt-Amount Remaining R-0016477:$0 PY-014464 Related To 0112-2022-BRES Amount $32.75 Created Date 9/29/2022 Payment Source R-0013554 Receipt-Amount Remaining R-0013554:$0 Reviews REV-026824 Milestone Review Round 1-0112-2022-BRES Status Approved Type Zoning Due Date Completed Date 1/10/2023 12:16 PM Owner Alias SVarg On Hold Created Date 9/30/2022 REV-026825 Milestone Review Round 1-0112-2022-BRES Status Approved Type Building Due Date Completed Date 2/13/2023 8:57 PM Owner Alias JHahn On Hold Created Date 9/30/2022 REV-028105 Milestone Review Round 1-0112-2022-BRES Status Approved Type Engineering Dev Due Date Completed Date 1/18/2023 8:11 AM Owner Alias KSmit On Hold Created Date 1/9/2023 REV-028183 Milestone Review Round 1-0112-2022-BRES Status Approved Type Engineering Erosion&Sediment Due Date Completed Date 2/14/2023 7:54 AM Owner Alias AReed On Hold Created Date 1/17/2023 Submissions Andy Rothchild-Deck Pictures.pdf Actions Submission Date 7/29/2022 9:59 AM Status Required Description Andrew R.-Revegetation Pictures.pdf https://cityofaspen.my.salesforce.com/a038X000O28hDQAQA2/p 10/11 3/3/25,3:24 PM 0112-2022-BRES-Salesforce-Enterprise Edition Actions Submission Date 9/27/2022 10:08AM Status Required Description Rothchild-Building Permit Contact Sheet.pdf Actions Submission Date 9/27/2022 10:09 AM Status Required Description Rothchild-Building Permit Contact Sheet.pdf Actions Submission Date 9/27/2022 12:48 PM Status Required Description Andrew Rothchild-Deck-Pergola-Step Pictures.pdf Actions Submission Date 9/28/2022 11:36 AM Status Required Description Permit History 3/3/2025 3:15 PM User Fernando Cruz Action Changed Owner from Gosia Dubiel to Fernando Cruz. 11/25/2024 11:31 AM User Martyna Wojtkowska Action Changed Status from Ready for Closure to Closed-Final. 10/16/2024 8:14 AM User Gosia Dubiel Action Changed Owner from Sydney Fallon to Gosia Dubiel. 10/15/2024 8:35 PM User Justin Hahn Action Changed Status from Final Inspections to Ready for Closure. 10/15/2024 8:35 PM User Justin Hahn Action Changed Status from Issued to Final Inspections. 10/15/2024 1:28 PM User Joseph Pewitt Action Changed Expiration Date from 4/6/2025 to 4/13/2025. 10/8/2024 8:38 AM User Joseph Pewitt Action Changed Expiration Date from 4/5/2025 to 4/6/2025. 10/7/2024 4:30 PM User Joseph Pewitt Action Changed Expiration Date from 2/20/2024 to 4/5/2025. 10/16/2023 2:54 PM User Sydney Fallon Action Changed Total Fees from$5,467.50 to$1,383.75. 10/16/2023 2:53 PM User Sydney Fallon Action Changed Total Fees from$1,342.50 to$5,467.50. Copyright©2000-2025 salesforce.com,inc.All rights reserved. https://cityofaspen.my.salesforce.com/a038X000028hDQAQA2/p 11/11