HomeMy WebLinkAboutFile Documents.134 E Bleeker St.0064-2022-BCHO (3) 1 134 E Bleeker Summary of Changes: General: • Change of ownership • Change of Contractor • Change of Civil Engineer (The civil engineer had previously worked on 134 E Bleeker with Roaring Fork Engineering prior to starting his own firm.) Civil: • All sheets have minor readjustments due to change in Civil Engineer of Record. • Note: The civil engineer had previously worked on 134 E Bleeker with Roaring Fork Engineering prior to starting his own firm. • Drainage redesigned based on planting/hardscape changes • Sidewalk and curb ramp changes per Parks/Engineering (C.04) • Stormwater layout minor adjustments due to planting changes • Slight modifications in grading due to planting changes and sidewalk realignment Landscape: • Changes to pavers to historic entry per HPC • Realignment of sidewalk per Parks/Engineering comments • Updated snowmelt • Change to planting plan • Modifications to hardscape plan • Changes to stone paving details • Added tree protection details Irrigation: • Update to irrigation calculations based on planting changes • WELS worksheet updated Architectural: • Square footage o No change to allowable FAR o No change to building footprint o No change of gross square footage • Crawlspace A.2.06 o Crawl Space Footprint Has Not Changed, Only Minor Adjustment In The Footing Step Per Shoring Req. • Basement Level A.2.07 O 1. Gas Appliance Fireplace Added. o 2. Bar Counter Increased In Length. O 3. Closet 106 Accessed From Rec Room. O 4. Stair Landing Enlarged. RECEIVED 08/31/2022 ASPEN BUILDING DEPARTMENT 2 o 5. Under Stair Closet Added. O 6. Powder LI Added. O 7. Bath 3 010 Layout Change. O 8. Storage 001 Door Changed To Swing. O 9. Steam Shower added to Bath 1 o No Changes To Building Footprint Per Approved Building Permit 0102-2020-Bres. • Main Floor A.2.08 o 1. Kitchen Layout Updated. O 2. Gas Appliance Added In Office 101. O 3. E12 Door Changed Per Hpc Monitor Approved Fenestration Changes 11/3/2020 O 4. Gas Appliance Fireplace Added To Living Room o 5. E03 Changed Back To Door And W14 Window Updated Per Hpc Monitor Approved Fenestration Changes 2/10/22. O 7. Entry/Mudroom Modified Wall Framing. O 8. Garage Stairway Access Changed To Leave Existing Exterior Door Access E09. O 9. Update W60 Kitchen Window Per Hpc Monitor Approval 5/6/2022. o No Changes To Building Footprint Per o Approved Building Permit 0102-2020-Bres. • Upper Floor A.2.09 - O 1.Remove Powder Room In Master Closet 212. O 2. Add Laundry Room To Master Closet 212. O 3.Add Bar At Top Of Stairs Hallway 203. O 4. Change Window E07 Per Hpc Approval Per Hpc Monitor Approved Fenestration Changes 2/10/22. O 5.Add Sauna Into Master Bathroom 205. O 6. Remove Window Along Gridine 5 Per Hpc Monitor Approved Fenestration Changes 2/10/22. O 7. Add Hanging Closet In Master Bedroom O 8. Remove Interior Wall Between Bedroom And Kitchenette In Guest Bedroom 206. O 9. Change Layout In Guest Bathroom 207. O 10. Add Gas Appliance Fireplace O 11. Add Unfinished, Uninhabitable Mechanical Chase For Fireplace Flue. O 12. Steam Shower added to Guest Bath o No Changes To Building Footprint Per Approved Building Permit 0102-2020-Bres. RECEIVED 08/31/2022 ASPEN BUILDING DEPARTMENT 3 • Roof plan A.2.10 -Add callouts for downspouts as approved by HPC, add 8" flue termination in guest bedroom roof. Submitted to HP Monitor . • RCP A.2.10-A.2.13 - update lighting plan per interior layout changes • Elevations A.300 series o Removal of non-historic window in north elevation (approved by HPC 2/10/22) o Changes to fenestration on west elevation (approved by HPC 5/6/22) o Add flue in guest bedroom roof in west elevation o Changes to fenestration in south elevation (approved by HPC2/10/22) o Change depth of lightwell in south elevation o Added elevation of south garage o Changes to fenestration in east elevation (approved by HPC 11/3/2020) • Building and Wall Sections (A.400 series) o Extended floor in master closet o Footing detail simplified o Stair railing change to metal o Upper guest bedroom stair modified o Kitchen window relocated per HPC (approved by HPC 5/6/2022) o Exterior deck thresholds 1" step onto deck o Wall section details added o Foundation details added • Wall Assemblies (A.5.00 series) o Foundation wall assembly, crawl space wall modified per enclosure consultant o Added assembly Da, J, E, R2, R2 o Assembly C modified to add electric mat • Details A.600 series o Railing details added o Stair details modified to update landing a lowest level and change railing type o Lightwell details added o Window and door details updated to Loewen windows • Schedules A.700 series o Modified per manufacturer and size adjustments o Interior lighting schedule fixture changes Structural: • Modifications to foundation detail at slab step 12/S.400 • Added access hatch framing at lower level • Added axonometric drawings • Added framing in upper level master closet • Updated framing, slab, bracing details Mechanical: • Added electric heat mats • Added venting for gas appliance fireplaces • Updated ducting per interior plan changes RECEIVED 08/31/2022 ASPEN BUILDING DEPARTMENT 4 Electrical: • Plan coordinated with new floor plan RECEIVED 08/31/2022 ASPEN BUILDING DEPARTMENT