134 E Bleeker Summary of Changes:
General:
• Change of ownership
• Change of Contractor
• Change of Civil Engineer (The civil engineer had previously worked on 134 E Bleeker
with Roaring Fork Engineering prior to starting his own firm.)
Civil:
• All sheets have minor readjustments due to change in Civil Engineer of Record.
• Note: The civil engineer had previously worked on 134 E Bleeker with Roaring Fork
Engineering prior to starting his own firm.
• Drainage redesigned based on planting/hardscape changes
• Sidewalk and curb ramp changes per Parks/Engineering (C.04)
• Stormwater layout minor adjustments due to planting changes
• Slight modifications in grading due to planting changes and sidewalk realignment
Landscape:
• Changes to pavers to historic entry per HPC
• Realignment of sidewalk per Parks/Engineering comments
• Updated snowmelt
• Change to planting plan
• Modifications to hardscape plan
• Changes to stone paving details
• Added tree protection details
Irrigation:
• Update to irrigation calculations based on planting changes
• WELS worksheet updated
Architectural:
• Square footage
o No change to allowable FAR
o No change to building footprint
o No change of gross square footage
• Crawlspace A.2.06
o Crawl Space Footprint Has Not Changed, Only Minor Adjustment In The Footing
Step Per Shoring Req.
• Basement Level A.2.07
O 1. Gas Appliance Fireplace Added.
o 2. Bar Counter Increased In Length.
O 3. Closet 106 Accessed From Rec Room.
O 4. Stair Landing Enlarged.
RECEIVED
08/31/2022
ASPEN
BUILDING DEPARTMENT
2
o 5. Under Stair Closet Added.
O 6. Powder LI Added.
O 7. Bath 3 010 Layout Change.
O 8. Storage 001 Door Changed To Swing.
O 9. Steam Shower added to Bath 1
o No Changes To Building Footprint Per Approved Building Permit
0102-2020-Bres.
• Main Floor A.2.08
o 1. Kitchen Layout Updated.
O 2. Gas Appliance Added In Office 101.
O 3. E12 Door Changed Per Hpc Monitor Approved Fenestration Changes
11/3/2020
O 4. Gas Appliance Fireplace Added To Living Room
o 5. E03 Changed Back To Door And W14 Window Updated Per Hpc Monitor
Approved Fenestration Changes 2/10/22.
O 7. Entry/Mudroom Modified Wall Framing.
O 8. Garage Stairway Access Changed To Leave Existing Exterior Door Access
E09.
O 9. Update W60 Kitchen Window Per Hpc Monitor Approval 5/6/2022.
o No Changes To Building Footprint Per
o Approved Building Permit 0102-2020-Bres.
• Upper Floor A.2.09 -
O 1.Remove Powder Room In Master Closet 212.
O 2. Add Laundry Room To Master Closet 212.
O 3.Add Bar At Top Of Stairs Hallway 203.
O 4. Change Window E07 Per Hpc Approval Per Hpc Monitor Approved
Fenestration Changes 2/10/22.
O 5.Add Sauna Into Master Bathroom 205.
O 6. Remove Window Along Gridine 5 Per Hpc Monitor Approved Fenestration
Changes 2/10/22.
O 7. Add Hanging Closet In Master Bedroom
O 8. Remove Interior Wall Between Bedroom And Kitchenette In Guest Bedroom
206.
O 9. Change Layout In Guest Bathroom 207.
O 10. Add Gas Appliance Fireplace
O 11. Add Unfinished, Uninhabitable Mechanical Chase For Fireplace Flue.
O 12. Steam Shower added to Guest Bath
o No Changes To Building Footprint Per Approved Building Permit
0102-2020-Bres.
RECEIVED
08/31/2022
ASPEN
BUILDING DEPARTMENT
3
• Roof plan A.2.10 -Add callouts for downspouts as approved by HPC, add 8" flue
termination in guest bedroom roof. Submitted to HP Monitor .
• RCP A.2.10-A.2.13 - update lighting plan per interior layout changes
• Elevations A.300 series
o Removal of non-historic window in north elevation (approved by HPC 2/10/22)
o Changes to fenestration on west elevation (approved by HPC 5/6/22)
o Add flue in guest bedroom roof in west elevation
o Changes to fenestration in south elevation (approved by HPC2/10/22)
o Change depth of lightwell in south elevation
o Added elevation of south garage
o Changes to fenestration in east elevation (approved by HPC 11/3/2020)
• Building and Wall Sections (A.400 series)
o Extended floor in master closet
o Footing detail simplified
o Stair railing change to metal
o Upper guest bedroom stair modified
o Kitchen window relocated per HPC (approved by HPC 5/6/2022)
o Exterior deck thresholds 1" step onto deck
o Wall section details added
o Foundation details added
• Wall Assemblies (A.5.00 series)
o Foundation wall assembly, crawl space wall modified per enclosure consultant
o Added assembly Da, J, E, R2, R2
o Assembly C modified to add electric mat
• Details A.600 series
o Railing details added
o Stair details modified to update landing a lowest level and change railing type
o Lightwell details added
o Window and door details updated to Loewen windows
• Schedules A.700 series
o Modified per manufacturer and size adjustments
o Interior lighting schedule fixture changes
Structural:
• Modifications to foundation detail at slab step 12/S.400
• Added access hatch framing at lower level
• Added axonometric drawings
• Added framing in upper level master closet
• Updated framing, slab, bracing details
Mechanical:
• Added electric heat mats
• Added venting for gas appliance fireplaces
• Updated ducting per interior plan changes
RECEIVED
08/31/2022
ASPEN
BUILDING DEPARTMENT
4
Electrical:
• Plan coordinated with new floor plan
RECEIVED